# US 2017/0286910 A1 · Configuration management system for large-scale capital projects

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0286910 A1
- Document ID: US20170286910A1
- Status: Published application
- Kind: A1
- Application number: 15/286,088
- Filed: 2016-10-05
- Published: 2017-10-05
- Earliest claimed: 2016-03-30
- Assignees: Hexagon Technology Center GmbH
- Applicants: Hexagon Technology Center GmbH
- Inventors: Ewan D. Botterill; Alain Mouyal
- Web page: https://patentgrep.com/patent/US20170286910A1

## CPC

- G06Q 10/103: {Workflow collaboration or project management}
- G06F 8/71: Version control (security arrangements therefor G06F21/57); Configuration management
- G06F 9/44505: {Configuring for program initiating, e.g. using registry, configuration files}
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/101: Collaborative creation, e.g. joint development of products or services
- G06Q 50/04: Manufacturing
- Y02P 90/30: Computing systems specially adapted for manufacturing
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A configuration management system more efficiently and effectively manages template configuration information across a plurality of large-scale capital projects that execute multiple applications at a plurality of project sites.

## Claims

### Claim 1

A configuration management system for managing templates between a central site and a plurality of large-scale capital projects, the plurality of large-scale capital projects executing multiple applications at a plurality of project sites, the configuration management system comprising:
a template generator at a central site, the template generator configured to produce a master template for at least one large-scale capital project, the master template having a plurality of master template configuration options;
a central site updater configured to update the master template configuration options at the central site;
an interface at the central cite operatively coupled with the central site updater, the interface being configured to forward a project template to the plurality of project sites, the project template having thousands of project configuration options for developing the large-scale capital projects, the project template being based on the master template,
the interface also being configured to forward to the plurality of project sites and/or one or more staging areas the updated master template configuration options, each project template having a set of existing project configuration options prior to receipt of the updated master template configuration options;
one or more automated comparators, at respective project sites and/or the staging area(s), configured to determine differences between the updated master template configuration options and existing project configuration options for each project, the one or more automated comparators being configured to produce a difference report having the master template configuration options that are different than the existing project configuration options of each project;
a manual selection interface operably coupled with the one or more automated comparators, the manual selection interface enabling a user to select, for each project, a sub-set of the master template configuration options from the difference report, each project template having a specific sub-set of project configuration options to be updated from the difference report; and
a project site updater configured to update, using the specific sub-set of template configuration options, the respective existing project configuration options for each project template to produce new existing project configuration options for each project template.

### Claim 2 (depends on 1)

The configuration management system as defined by claim 1 further comprising:
a project output operatively coupled with the project site updater, the project output being configured to forward the new existing configuration options for each project to the interface at the central site; and
the central site updater being configured to update the updated master template configuration options using the new existing configuration options for each project.

### Claim 3 (depends on 2)

The configuration management system as defined by claim 2 wherein the central site updater is configured to:
determine differences between the updated master template configuration options and the new existing configuration options for each project, and produce a further difference report having the updated master template configuration options that are different than the new existing configuration options for each project,
permit a user to select a sub-set of the new existing configuration options for each project from the further difference report, and
further update the updated master template configuration options using the sub-set of the new existing configuration options for each project from the further difference report.

### Claim 4 (depends on 2)

The configuration management system as defined by claim 2 wherein the central site updater is configured to again update the updated master template configuration options after updating the updated master template configuration options using the new existing configuration options for each project.

### Claim 5 (depends on 1)

The configuration management system as defined by claim 1 wherein the central site is geographically remote from at least one of the project sites.

### Claim 6 (depends on 1)

The configuration management system as defined by claim 1 wherein the plurality of project sites includes a physical site having a structure and a computer system.

### Claim 7

A method of managing template configuration information with a CMS across a plurality of large-scale capital projects, the plurality of large-scale capital projects executing multiple applications at a plurality of project sites, the method comprising:
forwarding, from a central site having a master template with a plurality of master template configuration options, a project template to the plurality of project sites, the project template having thousands of project configuration options for developing the large-scale capital projects, the project template being based on the master template;
updating, at the central site, the master template configuration options;
forwarding to the plurality of project sites and/or one or more staging areas, from the central site, the updated master template configuration options, each project template having a set of existing project configuration options prior to receipt of the updated master template configuration options;
using one or more automated comparators, at respective project sites and/or the staging area(s), to determine differences between the updated master template configuration options and existing project configuration options for each project, the one or more automated comparators producing a difference report having the master template configuration options that are different than the existing project configuration options of each project;
selecting, for each project, a sub-set of the master template configuration options from the difference report, each project template having a specific sub-set of project configuration options to be updated from the difference report; and
updating, using the specific sub-set of template configuration options, the respective existing project configuration options for each project template to produce new existing project configuration options for each project template.

### Claim 8 (depends on 7)

The method as defined by claim 7 further comprising:
forwarding the new existing configuration options for each project to the central site; and
updating the updated master template configuration options using the new existing configuration options for each project.

### Claim 9 (depends on 8)

The method as defined by claim 8 wherein updating the updated master template configuration options comprises:
using one or more automated comparators, at the central site and/or staging area, to determine differences between the updated master template configuration options and the new existing configuration options for each project, the one or more automated comparators producing a further difference report having the updated master template configuration options that are different than the new existing configuration options for each project;
selecting a sub-set of the new existing configuration options for each project from the further difference report; and
further updating the updated master template configuration options using the sub-set of the new existing configuration options for each project from the further difference report.

### Claim 10 (depends on 8)

The method as defined by claim 8 comprising again updating the updated master template configuration options after updating the updated master template configuration options using the new existing configuration options for each project.

### Claim 11 (depends on 7)

The method as defined by claim 7 wherein the central site is geographically remote from at least one of the project sites.

### Claim 12 (depends on 7)

The method as defined by claim 7 wherein using one or more automated comparators comprises first determining first differences between the updated master template configuration options and existing project configuration options for each project at the staging area(s), and then determining second differences between the updated master template configuration options and existing project configuration options for each project at one of the project site(s).

### Claim 13 (depends on 7)

The method as defined by claim 7 wherein selecting comprises a person selecting, for each project, the sub-set of the master template configuration options from the difference report.

### Claim 14 (depends on 7)

The method as defined by claim 7 wherein the plurality of project sites includes a physical site having a structure and a computer system.

### Claim 15 (depends on 14)

The method as defined by claim 14 wherein the computer system at the physical site is remote from the structure.

### Claim 16 (depends on 7)

The method as defined by claim 7 wherein:
forwarding to the plurality of project sites or one or more staging areas comprises forwarding to the one or more staging areas,
further wherein using one or more automated comparators, at respective project sites and/or the staging area(s), comprises using one or more automated comparators at the staging area(s).

### Claim 17

A computer program product for use on a computer system for managing CMS template configuration information across a plurality of large-scale capital projects, the plurality of large-scale capital projects executing multiple applications at a plurality of project sites, the computer program product comprising a tangible, non-transient computer usable medium having computer readable program code thereon, the computer readable program code comprising:
program code for forwarding, from a central site having a master template with a plurality of master template configuration options, a project template to the plurality of project sites, the project template having thousands of project configuration options for developing the large-scale capital projects, the project template being based on the master template;
program code for updating, at the central site, the master template configuration options;
program code for forwarding to the plurality of project sites and/or one or more staging areas, from the central site, the updated master template configuration options, each project template having a set of existing project configuration options prior to receipt of the updated master template configuration options;
program code for using one or more automated comparators, at respective project sites and/or the staging area(s), to determine differences between the updated master template configuration options and existing project configuration options for each project, the one or more automated comparator producing a difference report having the master template configuration options that are different than the existing project configuration options of each project;
program code for selecting, for each project, a sub-set of the master template configuration options from the difference report, each project template having a specific sub-set of project configuration options to be updated from the difference report; and
program code for updating, using the specific sub-set of template configuration options, the respective existing project configuration options for each project template to produce new existing project configuration options for each project template.

### Claim 18 (depends on 17)

The computer program product as defined by claim 17 further comprising:
program code for forwarding the new existing configuration options for each project to the central site; and
program code for updating the updated master template configuration options using the new existing configuration options for each project.

### Claim 19 (depends on 18)

The computer program product as defined by claim 18 wherein the program code for updating the updated master template configuration options comprises:
program code for using one or more automated comparators, at the central site and/or staging area, to determine differences between the updated master template configuration options and the new existing configuration options for each project, the one or more automated comparators producing a further difference report having the updated master template configuration options that are different than the new existing configuration options for each project;
program code for selecting a sub-set of the new existing configuration options for each project from the further difference report; and
program code for further updating the updated master template configuration options using the sub-set of the new existing configuration options for each project from the further difference report.

### Claim 20 (depends on 18)

The computer program product as defined by claim 18 comprising program code for again updating the updated master template configuration options after updating the updated master template configuration options using the new existing configuration options for each project.

### Claim 21 (depends on 17)

The computer program product as defined by claim 17 wherein the program code for using one or more automated comparators comprises program code for first determining first differences between the updated master template configuration options and existing project configuration options for each project at the staging area(s), and program code for then determining second differences between the updated master template configuration options and existing project configuration options for each project at one of the project site(s).

### Claim 22 (depends on 17)

The computer program product as defined by claim 17 wherein program code for selecting comprises program code for providing a manual user interface or enabling a person to select, for each project, the sub-set of the master template configuration options from the difference report.
