# US 2017/0286568 A1 · System and method for testing the validity of bim-designed electrical wiring pathways

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0286568 A1
- Document ID: US20170286568A1
- Status: Published application
- Kind: A1
- Application number: 15/087,080
- Filed: 2016-03-31
- Published: 2017-10-05
- Earliest claimed: 2016-03-31
- Assignees: M.C. Dean Inc.
- Applicants: M.C. Dean Inc.
- Inventors: William H. Dean; Alexey Karshakevich; Oleksandr Tomkeiev
- Web page: https://patentgrep.com/patent/US20170286568A1

## CPC

- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06F 2111/04: Constraint-based CAD
- G06F 2113/16: Cables, cable trees or wire harnesses
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A testing system and method are provided for verifying that a BIM-designed electrical distribution system in a building provides a valid, cost-effective electrical wiring pathway between every device and its assigned electrical distribution source. The system includes a digital processor having access to the informational content of the BIM-designed electrical distribution system, and a user interface and display screen connected to the digital processor. In operation, the digital processor extracts from the BIM-designed electrical distribution system the x-y locations of the devices, distribution sources such as electrical supply panels, and wiring pathway elements (e.g. conduits, junction boxes, etc.) forming electrical pathways. As the user lays out the pathways, the processor immediately informs the user, via the display screen, whether the distances between the device and the nearest exit point of the associated pathway and the distribution source and the nearest entry point of the associated pathway are within pre-selected, empirically-determined tolerances.

## Claims

### Claim 1

A testing system for verifying that a BIM-designed electrical distribution system in a building provides a valid wiring pathway between every device and a distribution source, wherein the BIM design provides a building floor plan, the x-y-z locations on the floor plan of the devices, the distribution sources, and the identity of both the distribution source and a circuit assigned to each device, comprising:
a digital processor having access to the informational content of the BIM-designed electrical distribution system,
a user interface operatively connected to the digital processor, and
a visual display screen operatively connected to the digital processor,
wherein the digital processor executes the steps of:
(a) extracting from the BIM-designed electrical distribution system the x-y location of the devices and the distribution sources and any wiring pathway elements included within the BIM-designed electrical distribution system;
(b) determining the identity of pathway elements that form at least a partial wiring pathway for each circuit, and the x-y location of exit and entry points of each pathway;
(c) selecting, for each device, the closest exit point of the pathway associated with the device's assigned circuit, and the closest entry point of the associated pathway with respect to the distribution source of the assigned circuit, and
(d) informing the user, via the display screen, whether the distances between the device and the nearest exit point and the distribution source and the nearest entry point exceed pre-selected tolerances indicative of a valid wiring pathway.

### Claim 2 (depends on 1)

The testing system defined in claim 1, wherein the digital processor further executes the steps of:
informing the user via the display screen if the x-y distance between the device and the closest exit point of the associated pathway is greater than or equal to a preselected distance ε2, wherein distances greater than or equal to ε2 indicate an invalid wiring pathway between the device and its assigned distribution source circuit, and
informing the user via the display screen if the x-y distance between the distribution source associated with the device and the closest entry point of the pathway is greater than or greater than a preselected distance ε1, wherein distances greater than or equal to ε1 indicate that there is an invalid wiring pathway between the device and its assigned distribution source,
wherein ε2 is substantially greater than ε1.

### Claim 3 (depends on 2)

The testing system defined in claim 2, wherein the value of ε2 is about twice as much as the value of ε1.

### Claim 4 (depends on 2)

The testing system defined in claim 2, wherein the value of ε1 is about 10 feet, and the value of ε2 is about 20 feet.

### Claim 5 (depends on 1)

The testing system defined in claim 1, wherein the digital processor further executes the step of confirming whether the BIM-designed electrical distribution system has assigned each device to a circuit of one of the distribution sources, and for any such unassigned device, informing the user of the testing system via the display screen of the unassigned condition of the device.

### Claim 6 (depends on 1)

The testing system defined in claim 1, wherein the digital processor further executes the step of determining, for each device for which the BIM-designed electrical distribution system has assigned a circuit, whether there is a pathway exit point element associated with the circuit assigned to the device, and if not, if the x-y distance between the device and its assigned distribution source is greater than or equal to a preselected distance ε2, then informing the user via the display screen that no valid pathway exists between the device and its assigned distribution source.

### Claim 7 (depends on 1)

The testing system defined in claim 1, wherein the pathway elements include at least one of the group consisting of an electrical conduit, a junction box, a cable tray, and a length of MC cable.

### Claim 8 (depends on 1)

The testing system defined in claim 1, wherein the processor informs the user, via the display screen, whether the distances between the device and the nearest exit point and the distribution source and the nearest entry point exceed pre-selected tolerances indicative of a valid wiring pathway simultaneously with the positioning of pathway elements by the system user into the BIM-designed electrical distribution system.

### Claim 9 (depends on 1)

The testing system defined in claim 1, wherein after the digital processor determines the closest exit point of the pathway to the device, the digital processor determines the closest entry point of the pathway to the distribution source associated with the device by tracing backwards from the exit point from the first to the last connected element of the pathway.

### Claim 10 (depends on 9)

The testing system defined in claim 9, wherein the digital processor determines the closest entry point of the pathway by determining the x-y distance between each entry point of each pathway element and the distribution source associated with the device, and then selecting the closest entry point to the distribution source.

### Claim 11

A testing system for verifying that a BIM-designed electrical distribution system in a building provides a valid wiring pathway between every device and a distribution source, wherein the BIM model provides a building floor plan, the x-y-z locations on the floor plan of the devices, the distribution sources, and the identity of both the distribution source and a circuit assigned to each device, comprising:
a digital processor having access to the informational content of the BIM-designed electrical distribution system,
a user interface operatively connected to the digital processor, and
a display screen operatively connected to the digital processor,
wherein the digital processor executes the steps of:
(a) extracting from the BIM-designed electrical distribution system the x-y location of the devices and the distribution sources and any wiring pathway elements included within the BIM-designed electrical distribution system or added thereafter;
(b) determining the identity of pathway elements that form a wiring pathway for each distribution source circuit, and the x-y locations of exit and entry points of each pathway;
(c) selecting, for each device, the closest exit point for the pathway associated with the device's assigned circuit, and then selecting the nearest entry point of the pathway associated with the device's assigned circuit to the distribution source associated with the assigned circuit, and
(d) informing the user, via the display screen, whether the x-y distance between the device and the nearest exit point is within a pre-selected distance ε2 and the x-y distance between the associated distribution source and the nearest entry point is within a pre-selected distance ε1 simultaneously with the positioning of pathway elements by the system user into the BIM-designed electrical and signal distribution system,
wherein distances less than ε1 and ε2 are indicative of a valid wiring pathway.

### Claim 12 (depends on 11)

The testing system defined in claim 11, wherein the digital processor further executes the step of confirming whether the BIM-designed electrical distribution system has assigned each device to a circuit of one of the distribution sources, and for any such unassigned device, informing a user of the testing system via the display screen of the unassigned condition of the device.

### Claim 13 (depends on 11)

The testing system defined in claim 11, wherein the pathway elements include at least one of the group consisting of an electrical conduit, a junction box, a cable tray, and a length of MC cable.

### Claim 14 (depends on 11)

The testing system defined in claim 11, wherein the digital processor further executes the step of determining, for each device for which the BIM-designed electrical distribution system has assigned a circuit, whether there is a pathway exit point element associated with the circuit assigned to the device, and if not, if the x-y distance between the device and its assigned distribution source is greater than or equal to a preselected distance ε2, then informing the user via the display screen that no valid pathway exists between the device and its assigned distribution source.

### Claim 15 (depends on 11)

The testing system defined in claim 11, wherein the digital processor determines the closest entry point for the pathway associated with the device's assigned circuit by tracing back from the exit point to the last pathway element forming the electrical pathway.

### Claim 16 (depends on 15)

The testing system defined in claim 15, wherein the digital processor determines the closest entry point of the pathway by determining the x-y distance between each entry point of each pathway element and the distribution source associated with the device, and then selecting the closest entry point to the distribution source.

### Claim 17

A testing method for verifying that a BIM-designed electrical distribution system in a building provides a valid wiring pathway between every device and a distribution source, wherein the BIM-designed system includes a building floor plan, the x-y-z locations on the floor plan of the devices, the distribution sources, and the identity of both the distribution source and a circuit assigned to each device, wherein the BIM-designed electrical distribution system is shown on a display screen of a digital processor having a user interface, comprising the steps of:
extracting from the BIM-designed electrical distribution system the x-y location of the devices and the distribution source and any wiring pathway elements included within the BIM-designed electrical distribution system;
determining the identity of pathway elements that form at least a partial wiring pathway for each panel circuit, and the x-y location of exit and entry points of each pathway;
selecting, for each device and its assigned source, the closest exit point to the device and the closest entry point to the source for the pathway associated with the device's assigned circuit, and
displaying on the display screen whether the distances between the device and the nearest exit point and the distribution source and the nearest entry point are within pre-selected distance tolerances ε2 and ε1 indicative of a valid wiring pathway simultaneously with the positioning of pathway elements by the system user into the BIM-designed electrical and signal distribution system.

### Claim 18 (depends on 17)

The testing method defined in claim 17, further comprising the step of:
determining, for each device for which the BIM-designed electrical distribution system has assigned a circuit, whether there is a pathway exit element associated with the circuit assigned to the device, and if not, determining if the x-y distance between the device and its assigned distribution source is greater than or equal to the preselected distance ε2, wherein distances greater than ε2 indicate that no valid pathway exists between the device and its assigned distribution source.

### Claim 19 (depends on 17)

The testing method defined in claim 17, further comprising the step of:
confirming whether the BIM-designed electrical distribution system has assigned each device to a circuit of one of the distribution sources, and for any such unassigned device, informing the user of the testing system via the display screen of the unassigned condition of the device.

### Claim 20 (depends on 17)

The testing method defined in claim 17, wherein the system user manually positions on the display screen at least exit and entry points of a pathway formed from a string of pathway elements, and the display screen simultaneously displays a validation report on all pathways present in the BIM-designed electrical distribution system.