# US 2017/0285704 A1 · Systems and methods for usage of secondary power supplies in computing environments based on risk and cost assessments

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0285704 A1
- Document ID: US20170285704A1
- Status: Published application
- Kind: A1
- Application number: 15/088,086
- Filed: 2016-03-31
- Published: 2017-10-05
- Earliest claimed: 2016-03-31
- Assignees: Lenovo Enterprise Solutions (Singapore) Pte. Ltd.
- Applicants: Lenovo Enterprise Solutions (Singapore) Pte. Ltd.
- Inventors: Paul Artman; Fred A. Bower; Gary D. Cudak; Ajay Dholakia
- Web page: https://patentgrep.com/patent/US20170285704A1

## CPC

- G06F 1/263: {Arrangements for using multiple switchable power supplies, e.g. battery and AC (G06F1/30 takes precedence)}
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- H05K 7/1492: {having electrical distribution arrangements, e.g. power supply or data communications}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS

## Abstract

Systems and methods for usage of secondary power supplies in computing environments based on risk and cost assessments are disclosed. According to an aspect, a method includes determining a risk value to a primary power source of a need to utilize a secondary power source for powering a plurality of computing devices. The method includes using the secondary power source to power a portion of the computing devices based on the determined risk value.

## Claims

### Claim 1

A method comprising:
determining a risk value to a primary power source of a need to utilize a secondary power source for powering a plurality of computing devices; and
using the secondary power source to power a portion of the computing devices based on the determined risk value.

### Claim 2 (depends on 1)

The method of claim 1, wherein the computing devices are servers operating within a data center.

### Claim 3 (depends on 1)

The method of claim 1, wherein determining a risk value comprises determining a likelihood that a weather condition will disable the primary power source, and
wherein using the secondary power source comprises using the secondary power source to power the portion of the computing devices based on the likelihood of the weather condition.

### Claim 4 (depends on 1)

The method of claim 1, wherein determining a risk value comprises determining the risk value based on an analysis of media content, and
wherein using the secondary power source comprises using the secondary power source to power the portion of the computing devices based on the analysis of media content.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining a risk value comprises determining the risk value based on an administrator setting, and
wherein using the secondary power source comprises using the secondary power source to power the portion of the computing devices based on the administrator setting.

### Claim 6 (depends on 5)

The method of claim 5, wherein the administrator setting includes one or more of a time of power usage by the portion of the computing devices, an amount of power usage by the portion of the computing devices, and a cost of using the primary power source to power the portion of the computing devices.

### Claim 7 (depends on 1)

The method of claim 1, wherein determining a risk value comprises determining a risk value of a need to utilize one of a battery backup system, generator, and solar power system for powering the computing devices.

### Claim 8 (depends on 1)

The method of claim 1, wherein using the secondary power source comprises using the secondary power source to power a portion of one of the computing devices.

### Claim 9 (depends on 1)

The method of claim 1, wherein using the secondary power source comprises using the secondary power source to power portions of two or more of the computing devices.

### Claim 10 (depends on 1)

The method of claim 1, further comprising determining costs associated with using the secondary power source and a primary power source for powering the computing devices, and
wherein using the secondary power source comprises using the secondary power source to power a portion of the computing devices based on the determined risk value and the determined costs.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
determining whether the cost of using the primary power source exceeds the cost of using the secondary power source; and
in response to determining that the cost of using the primary power source exceeds the cost of using the secondary power source, switching from the primary power source to the secondary power source.

### Claim 12 (depends on 11)

The method of claim 11, wherein switching from the primary power source to the secondary power source comprises switching from the primary power source to the secondary power source in response to determining that the determined risk meets a predetermined threshold.

### Claim 13 (depends on 1)

The method of claim 1, wherein using the secondary power source comprises using the secondary power source to power a server rack with a data center.

### Claim 14 (depends on 1)

The method of claim 1, wherein the plurality of computing devices comprises a first set of computing devices and a second set of computing devices,
wherein the method comprises:
determining whether power consumption of the first and second sets of computing devices by the primary power source exceeds a predetermined threshold; and
in response to determining that power consumption of the first and second sets of computing devices exceeds a predetermined threshold, using the secondary power source to power the second set of computing devices to lower the power consumed by the primary power source to less than the predetermined threshold.

### Claim 15 (depends on 1)

The method of claim 1, further comprising using the primary power source and the secondary power source simultaneously to power the computing devices.

### Claim 16 (depends on 15)

The method of claim 15, further comprising using both the primary power source and the secondary power source simultaneously on different portions of the computing devices for aligning workloads.

### Claim 17 (depends on 1)

The method of claim 1, further comprising analyzing usage of the primary power source and the secondary power source for reducing costs.

### Claim 18

A system comprising:
a plurality of computing devices;
primary and secondary power sources configured to power the computing devices; and
a power source manager comprising at least one processor and memory and configured to:
determine a risk value to a primary power source of a need to utilize a secondary power source for powering a plurality of computing devices; and
use the secondary power source to power a portion of the computing devices based on the determined risk value.

### Claim 19 (depends on 18)

The system of claim 18, wherein the computing devices are servers operating within a data center.

### Claim 20 (depends on 18)

The system of claim 18, wherein the risk value comprises a risk value of a need to utilize one of a battery backup system, generator, and solar power system for powering the computing devices.
