# US 2017/0285598 A1 · Systems and methods for managing power grid demand

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0285598 A1
- Document ID: US20170285598A1
- Status: Published application
- Kind: A1
- Application number: 15/509,389
- Filed: 2015-09-14
- Published: 2017-10-05
- Earliest claimed: 2014-09-12
- Assignees: BCP Controls, LLC
- Applicants: Bcp Controls, LLC
- Inventors: JOHN EDWARD FITCH; CHRIS SADLER
- Web page: https://patentgrep.com/patent/US20170285598A1

## CPC

- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 13/1337: {involving the use of Internet protocols}
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2105/42: Home appliances
- H02J 2105/55: according to an economic condition, e.g. tariff-based load management
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/242: Home appliances
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method for reducing aggregate power cost that includes determining an end device power consumption profile for each of a plurality of end devices, storing the end device power consumption profiles in a switching device configured to determine a desired power flow timing for each of the plurality of end devices, determining an optimal rate period with the switching device, determining, with the switching device, the desired power flow timing for each of the plurality of end devices such that a power consumption of the plurality of end devices is preferably within the optimal rate period, and controlling, via the control device, the plurality of end devices such that the desired power flow timing is substantially obtained, thereby reducing aggregate cost per kWhr of the plurality of end devices.

## Claims

### Claim 1

A method for reducing aggregate power cost, the method comprising:
determining an end device power consumption profile for each of a plurality of end devices, wherein said plurality of end devices are electrically coupled to a control device configured to control power flow to said plurality of end devices;
storing said end device power consumption profiles in a switching device configured to determine a desired power flow timing for each of said plurality of end devices, wherein said switching device is communicably coupled to said control device;
determining an optimal rate period with said switching device;
determining, with said switching device, said desired power flow timing for each of said plurality of end devices such that a power consumption of said plurality of end devices is preferably within said optimal rate period; and
controlling, via said control device, said plurality of end devices such that said desired power flow timing is substantially obtained, thereby reducing aggregate cost per kWhr of said plurality of end devices.

### Claim 2 (depends on 1)

The method of claim 1, wherein said power consumption profile for each of said plurality of end devices is determined by said control device.

### Claim 3 (depends on 1)

The method of claim 1, wherein determining an optimal rate period accounts for at least one of a current peak demand or predicted future peak demand of energy usage.

### Claim 4 (depends on 1)

The method of claim 1, wherein determining an optimal rate period accounts for a temporal rate plan.

### Claim 5 (depends on 1)

The method of claim 1, further comprising override means for controlling at least one of said plurality of end devices which overrides said switching device.

### Claim 6 (depends on 1)

The method of claim 1, wherein determining said desired power flow timing excludes critical end devices of said plurality of end devices.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
associating a user with a user device configured to transmit a unique user device ID; and
determining a user location of said user relative to an effective use range of at least one of said plurality of end devices,
wherein determining said desired power flow timing for each of said plurality of end devices is at least partially based on said user location.

### Claim 8 (depends on 7)

The method of claim 7, wherein said user device is an active RFID tag, and wherein said user location is determined via a received signal strength indication (RSSI) received by said control device.

### Claim 9

A system for reducing aggregate power cost, the system comprising:
a plurality of end devices, each of said plurality of end devices having a power consumption profile;
first means for controlling power flow timing of said plurality of end devices, said first means being electrically coupled to said plurality of end devices; and
a switching device having second means for determining a desired power flow timing for each of said plurality of end devices, said switching device being communicably coupled to said first means and configured for:
storing said end device power consumption profiles; and
determining an optimal rate period,
wherein said second means determines said desired power flow timing such that power consumption of said plurality of end devices is preferentially within said optimal rate period, and
wherein said first means controls power flow timing to said plurality of end devices such that said desired power flow is substantially obtained, thereby reducing aggregate cost per kWhr of said plurality of end devices.

### Claim 10 (depends on 9)

The system of claim 9, wherein said power consumption profile for each of said plurality of end devices is determined by said first means.

### Claim 11 (depends on 9)

The system of claim 9, wherein determining an optimal rate period accounts for at least one of a current peak demand or predicted future peak demand of energy usage.

### Claim 12 (depends on 9)

The system of claim 9, wherein determining an optimal rate period accounts for a temporal rate plan.

### Claim 13 (depends on 9)

The system of claim 9, further comprising override means for controlling at least one of said plurality of end devices which overrides said first means.

### Claim 14 (depends on 9)

The system of claim 9, wherein said second means for determining said desired power flow timing excludes critical end devices of said plurality of end devices.

### Claim 15 (depends on 9)

The system of claim 9, further comprising a user device configured to be associated with a user and transmit a unique user device ID,
wherein a user location of said user is determined relative to an effective use range of at least one of said plurality of end devices, and
wherein said desired power flow timing is further at least partially based on said user location.

### Claim 16 (depends on 15)

The system of claim 15, wherein said user device is an active RFID tag, and wherein said user location is determined via a received signal strength indication (RSSI) received by said first control means.
