# US 2017/0285587 A1 · Two-stage control systems and methods for economical optimization of an electrical system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0285587 A1
- Document ID: US20170285587A1
- Status: Published application
- Kind: A1
- Application number: 15/414,551
- Filed: 2017-01-24
- Published: 2017-10-05
- Earliest claimed: 2016-04-01
- Assignees: Demand Energy Networks, Inc.
- Applicants: Demand Energy Networks, Inc.
- Inventors: John Michael Fife
- Web page: https://patentgrep.com/patent/US20170285587A1

## CPC

- G06Q 10/06313: {Resource planning in a project environment}
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- G01R 31/392: Determining battery ageing or deterioration, e.g. state of health
- G05B 13/021: {in which a variable is automatically adjusted to optimise the performance}
- G05B 13/0265: {the criterion being a learning criterion}
- G05B 13/041: {in which a variable is automatically adjusted to optimise the performance}
- G05B 13/048: {using a predictor}
- G05B 17/02: electric
- G05F 1/66: Regulating electric power
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06Q 50/06: Energy or water supply
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 13/00: Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J 13/1337: {involving the use of Internet protocols}
- H02J 7/585: {Sequential battery discharge in systems with a plurality of batteries}
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2105/55: according to an economic condition, e.g. tariff-based load management
- Y02B 10/30: Wind power
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The present disclosure is directed to systems and methods for economically optimal control of an electrical system. Some embodiments employ generalized multivariable constrained continuous optimization techniques to determine an optimal control sequence over a future time domain in the presence of any number of costs, savings opportunities (value streams), and constraints. Some embodiments also include control methods that enable infrequent recalculation of the optimal setpoints. Some embodiments may include a battery degradation model that, working in conjunction with the economic optimizer, enables the most economical use of any type of battery. Some embodiments include techniques for load and generation learning and prediction. Some embodiments include consideration of external data, such as weather.

## Claims

### Claim 1

An electrical system controller to optimize overall economics of operation of an electrical system, the controller comprising:
a first computing device to determine a control plan for managing control of the electrical system during an upcoming time domain and provide the control plan as output, the control plan including a plurality of sets of parameters each to be applied for a different time segment within the upcoming time domain; and
a second computing device to determine a set of control values for a set of control variables for a given time segment of the upcoming time domain and provide the set of control values to the electrical system, wherein the second computing device determines the set of control values based on a control law and a set of values for a given set of parameters of the plurality of sets of parameters of the control plan, wherein the given set of parameters corresponds to an upcoming time segment.

### Claim 2 (depends on 1)

The electrical system controller of claim 1, wherein the first computing device determines the control plan based on a set of configuration elements and a set of process variables, the set of configuration elements specifying one or more constraints of the electrical system and defining one or more cost elements associated with operation of the electrical system, the set of process variables providing one or more measurements of a state of the electrical system.

### Claim 3 (depends on 2)

The electrical system controller of claim 2, wherein the first computing device determines the control plan by:
preparing a cost function to be evaluated based on the plurality of sets of control parameters, the cost function including the one or more constraints and the one or more cost elements associated with operation of the electrical system; and
executing a minimization of the cost function to determine optimal values for the plurality of sets of control parameters.

### Claim 4 (depends on 3)

The electrical system controller of claim 3, wherein the first computing device executes the minimization of the cost function by utilizing an optimization algorithm to identify the optimal values in accordance with the one or more constraints and the one or more cost elements.

### Claim 5 (depends on 4)

The electrical system controller of claim 4, wherein the optimization algorithm comprises one or more of:
a continuous optimization algorithm,
a constrained optimization algorithm,
a generalized optimization algorithm, and
a multivariable optimization algorithm.

### Claim 6 (depends on 1)

The electrical system controller of claim 1, wherein the first computing device is further to receive a set of process variables that provide one or more measurements of a state of the electrical system, the set of process variables to be used to determine progress toward meeting the objective for economical optimization of the electrical system,
wherein the first computing device determines the control plan based on the set of process variables.

### Claim 7 (depends on 1)

The electrical system controller of claim 1, wherein the second computing device providing the set of values to the electrical system comprises providing given values for a given set of the plurality of sets of control parameters, wherein the given set corresponds to a given time segment during the upcoming time domain.

### Claim 8 (depends on 1)

The electrical system controller of claim 1, wherein the set of values comprises a set of control values for a set of control variables corresponding to a given time segment of the upcoming time domain,
wherein the second computing device determines the set of control values based on a control law and a set of values for a given set of the plurality of sets of control parameters of the control plan, wherein the given set of the plurality of sets of control parameters corresponds to the given time segment.

### Claim 9 (depends on 8)

The electrical system controller of claim 8, wherein the second computing device is further to receive a set of process variables, and
wherein the second computing device determines the set of control values based on the set of process variables.

### Claim 10 (depends on 1)

The electrical system controller of claim 1, wherein the first computing device is further to predict one or more of a load on the electrical system and generation by a local generator of the electrical system during the upcoming time domain,
wherein the first computing device determines the control plan considering the predicted one or more of the predicted load and predicted generation during the upcoming time domain.

### Claim 11

A method to optimize overall economics of operation of an electrical system, the method comprising:
determining on a first computing device a control plan that includes a plurality of sets of control parameters, each set of the plurality of sets to be applied for a different time segment within an upcoming time domain;
providing the control plan to a second computing device for managing control of the electrical system during the upcoming time domain; and
providing, by the second computing device, a set of values to the electrical system to effectuate a change to the electrical system toward meeting an objective for economical optimization of the electrical system during the upcoming time domain, the set of values provided according to the control plan.

### Claim 12 (depends on 11)

The method of claim 11, further comprising:
receiving at the first computing device a set of configuration elements specifying one or more constraints of the electrical system and defining one or more cost elements associated with operation of the electrical system,
wherein the determining the control plan is based on the one or more constraints and the one or more cost elements.

### Claim 13 (depends on 12)

The method of claim 12, wherein determining the control plan comprises:
preparing a cost function to be evaluated based on the plurality of sets of control parameters, the cost function including the one or more constraints and the one or more cost elements associated with operation of the electrical system; and
executing a minimization of the cost function to determine optimal values for the plurality of sets of control parameters.

### Claim 14 (depends on 13)

The method of claim 13, wherein executing the minimization of the cost function comprises utilization of an optimization algorithm to identify the optimal values in accordance with the one or more constraints and the one or more cost elements.

### Claim 15 (depends on 14)

The method of claim 14, wherein the optimization algorithm comprises one or more of:
a continuous optimization algorithm,
a constrained optimization algorithm,
a generalized optimization algorithm, and
a multivariable optimization algorithm.

### Claim 16 (depends on 11)

The method of claim 11, further comprising:
receiving at the first computing device a set of process variables that provide one or more measurements of a state of the electrical system, the set of process variables to be used to determine progress toward meeting the objective for economical optimization of the electrical system,
wherein the control plan is determined based on the set of process variables.

### Claim 17 (depends on 11)

The method of claim 11, wherein the providing the set of values to the electrical system comprises providing given values for a given set of the plurality of sets of control parameters, wherein the given set corresponds to a given time segment during the upcoming time domain, wherein the given values are provided to effectuate a change to the electrical system toward meeting an objective for economical optimization of the electrical system during the given time segment of the upcoming time domain.

### Claim 18 (depends on 11)

The method of claim 11, wherein the set of values comprises a set of control values for a set of control variables corresponding to a given time segment of the upcoming time domain, the method further comprising:
determining on the second computing device the set of control values based on a control law and a set of values for a given set of a plurality of sets of control parameters, wherein the given set of the plurality of sets of control parameters corresponds to the given time segment.

### Claim 19 (depends on 18)

The method of claim 18, further comprising receiving at the second computing device a set of process variables,
wherein the determining on the second computing device the set of control values is further based on the set of process variables.

### Claim 20 (depends on 11)

The method of claim 11, further comprising predicting on the first computing device one or more of a load on the electrical system and generation by a local generator of the electrical system during the upcoming time domain,
wherein the determining the control plan includes consideration of the predicted one or more of the predicted load and predicted generation during the upcoming time domain.

### Claim 21 (depends on 11)

The method of claim 11, wherein the plurality of sets of control parameters comprise a control parameter set X,
wherein determining the control plan comprises determining an optimal set of values for the control parameter set X.

### Claim 22 (depends on 11)

The method of claim 11, wherein providing the set of values to the electrical system comprises providing given values from the optimal set of values, the given values corresponding to a given set of the plurality of sets of control parameters, the given set corresponding to a given time segment during the upcoming time domain,
wherein the given values are provided to effectuate a change to the electrical system toward meeting an objective for economical optimization of the electrical system during the given time segment of the upcoming time domain.