# US 2017/0285220 A1 · Stress tensor computation using mindlin formulation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0285220 A1
- Document ID: US20170285220A1
- Status: Published application
- Kind: A1
- Application number: 15/088,576
- Filed: 2016-04-01
- Published: 2017-10-05
- Earliest claimed: 2016-04-01
- Assignees: Baker Hughes Incorporated
- Inventors: Tebis Llobet
- Web page: https://patentgrep.com/patent/US20170285220A1

## CPC

- G01V 20/00: Geomodelling in general
- G06F 17/13: Differential equations (using digital differential analysers G06F7/64)
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method for performing an earth formation borehole-related task includes: calculating a contribution to stress at each grid cell volume of interest in a geo-cellular model from other grid cell volumes that are at elevations above the grid cell volume of interest by use of the Mindlin Formulation using difference values between actual and linear approximation density values and Poisson's ratio values; adding all contributions to the stresses from all other grid cell volumes that are at elevations above the grid cell volume of interest to provide a stress tensor correction; adding first approximation of stress tensor components to the stress tensor correction to provide a total stress value; constructing a resulting stress tensor for the earth formation using the total stress values for the grid cell volumes of interest; and performing the borehole-related task using borehole-related equipment and the resulting stress tensor for the earth formation.

## Claims

### Claim 1

A method for performing a borehole-related task on an earth formation having changes in density, the method comprising:
constructing a geo-cellular model of the earth formation using a processor, the geo-cellular model comprising a plurality of grid cell volumes;
populating multiple grid cell volumes with corresponding actual density values and actual Poisson's ratio values for the grid cell volumes using the processor;
calculating with the processor a linear approximation of the density values and a linear approximation of the Poisson's ratio values as a function of spatial coordinates of the individual volume cells to provide linear approximation density values and linear approximation Poisson's ratio values for the plurality of grid cell volumes;
calculating with the processor a first approximation of components of a stress tensor representing stress in the formation using the linear approximation of the density values and the linear approximation of the Poisson's ratio values for the plurality of grid cell volumes;
calculating with the processor a difference between the actual density values and the linear approximation density values to provide density difference values for each of the grid cell volumes in the plurality of grid cell volumes;
calculating with the processor a contribution to stress at each grid cell volume of interest from other grid cell volumes that are at elevations above the grid cell volume of interest by use of the Mindlin Formulation using the density difference values and the Poisson's ratio values associated with each grid cell volume in the plurality of grid cell volumes;
adding with the processor all contributions to the stresses at each grid cell volume of interest from all other grid cell volumes that are at elevations above the grid cell volume of interest to provide a correction to the stress tensor;
adding with the processor the first approximation of the components of the stress tensor to the correction to the stress tensor to provide a total stress value that completely defines a state of stress in each grid cell volume of interest;
constructing with the processor a resulting stress tensor for the earth formation using the total stress values for the grid cell volumes of interest; and
performing the borehole-related task using borehole-related equipment and the resulting stress tensor for the earth formation.

### Claim 2 (depends on 1)

The method according to claim 1, wherein each grid cell in the plurality of grid cell volumes is processed by the processor as a grid cell volume of interest.

### Claim 3 (depends on 1)

The method according to claim 1, wherein at least one grid cell volume in the plurality has dimensions that are different from the dimensions of other grid cell volumes in the plurality.

### Claim 4 (depends on 1)

The method according to claim 1, wherein at least one grid cell volume in the plurality has a boundary line that is curved.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the earth formation is below a body of water.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the task comprises drilling a borehole into the earth formation at a selected location based on the stress tensor.

### Claim 7 (depends on 6)

The method according to claim 6, wherein drilling a borehole further comprises drilling the borehole in a selected lateral direction.

### Claim 8 (depends on 6)

The method according to claim 6, further comprising drilling the borehole using a selected drilling fluid density based on the stress tensor.

### Claim 9 (depends on 1)

The method according to claim 1, further comprising:
performing a linear regression on the actual density values in grid cell volumes in a vertical column having the same lateral coordinates (x,y) to provide a linear equation relating density values to vertical depth (z); and
performing a linear regression on the actual Poisson's ratio values in grid cell volumes in the vertical column having the same lateral coordinates (x,y) to provide a linear equation relating Poisson's ration values to vertical depth (z);
wherein calculating a linear approximation of the density values and a linear approximation of the Poisson's ratio values comprises using (i) the linear equation relating density values to vertical depth and (ii) the linear equation relating Poisson's ratio values to vertical depth.

### Claim 10 (depends on 9)

The method according to claim 9, wherein the geo-cellular model comprises a layer tilted from a horizontal plane having a density value that contrasts with a density value of the earth formation above and below the tilted layer.

### Claim 11 (depends on 1)

The method according to claim 1, wherein the spatial coordinates are x, y, z coordinates at a center of mass of each grid cell volume.

### Claim 12

A system for performing a borehole-related task on an earth formation having changes in density, the system comprising:
a memory having computer readable instructions;
a processor for executing the computer readable instructions, the computer readable instructions comprising:
constructing a geo-cellular model of the earth formation, the geo-cellular model comprising a plurality of grid cell volumes;
populating multiple grid cell volumes with corresponding actual density values and actual Poisson's ratio values for the grid cell volumes;
calculating a linear approximation of the density values and a linear approximation of the Poisson's ratio values as a function of spatial coordinates of the individual volume cells to provide linear approximation density values and linear approximation Poisson's ratio values for the plurality of grid cell volumes;
calculating a first approximation of components of a stress tensor representing stress in the formation using the linear approximation of the density values and the linear approximation of the Poisson's ratio values for the plurality of grid cell volumes;
calculating a difference between the actual density values and the linear approximation density values to provide density difference values for each of the grid cell volumes in the plurality of grid cell volumes;
calculating a contribution to stress at each grid cell volume of interest from other grid cell volumes that are at elevations above the grid cell volume of interest by use of the Mindlin Formulation using the density difference values and the Poisson's ratio values associated with each grid cell volume in the plurality of grid cell volumes;
adding all contributions to the stresses at each grid cell volume of interest from all other grid cell volumes that are at elevations above the grid cell volume of interest to provide a correction to the stress tensor;
adding the first approximation of the components of the stress tensor to the correction to the stress tensor to provide a total stress value that completely defines a state of stress in each grid cell volume of interest;
constructing a resulting stress tensor for the earth formation using the total stress values for the grid cell volumes of interest;
borehole-related equipment configured to perform the borehole-related task using the resulting stress tensor for the earth formation.

### Claim 13 (depends on 12)

The system according to claim 12, wherein the computer readable instructions further comprise:
performing a linear regression on the actual density values in grid cell volumes in a vertical column having the same lateral coordinates (x,y) to provide a linear equation relating density values to vertical depth (z); and
performing a linear regression on the actual Poisson's ratio values in grid cell volumes in the vertical column having the same lateral coordinates (x,y) to provide a linear equation relating Poisson's ration values to vertical depth (z);
wherein calculating a linear approximation of the density values and a linear approximation of the Poisson's ratio values comprises using (i) the linear equation relating density values to vertical depth and (ii) the linear equation relating Poisson's ratio values to vertical depth.

### Claim 14 (depends on 12)

The system according to claim 12, wherein the borehole-related equipment comprises a drill rig and the borehole-related task comprises drilling a borehole into the earth formation at a selected location based on the stress tensor.

### Claim 15 (depends on 14)

The system according to claim 14, wherein drilling a borehole comprises drilling the borehole in a lateral direction according to a selected geometry.
