# US 2017/0285088 A1 · Systems and Methods for Testing Electrical Leakage

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0285088 A1
- Document ID: US20170285088A1
- Status: Published application
- Kind: A1
- Application number: 15/505,640
- Filed: 2015-08-24
- Published: 2017-10-05
- Earliest claimed: 2014-08-22
- Assignees: Disruptive Technologies Research AS
- Applicants: Disruptive Technologies Research AS
- Inventors: Bjornar Hernes
- Web page: https://patentgrep.com/patent/US20170285088A1

## CPC

- G01R 31/2812: {Checking for open circuits or shorts, e.g. solder bridges; Testing conductivity, resistivity or impedance (of connections G01R31/66)}
- G01R 31/2851: {Testing of integrated circuits [IC] (G01R31/317 takes precedence; testing individual devices G01R31/26; testing printed circuits G01R31/2801)}
- G01R 31/52: Testing for short-circuits, leakage current or ground faults
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

A method of testing a self-contained device under test having at least a circuit under test and a power source is provided. The method may include at least temporarily enabling power from the power source to the circuit under test, determining a first voltage across the circuit under test, determining a second voltage across the circuit under test after a test duration, and calculating an average current of the circuit under test based at least partially on the first voltage, the second voltage and the test duration.

## Claims

### Claim 1

A method of testing a self-contained device under test having at least a circuit under test and a power source, comprising:
at least temporarily enabling power from the power source to the circuit under test;
determining a first voltage across the circuit under test;
determining a second voltage across the circuit under test after a test duration; and
calculating an average current of the circuit under test based at least partially on the first voltage, the second voltage and the test duration.

### Claim 2 (depends on 1)

The method of claim 1, wherein the calculated average current corresponds to an average active current of the circuit under test.

### Claim 3 (depends on 1)

The method of claim 1, further powering down the circuit under test after enabling power from the power source to the circuit under test and prior to determining the first voltage across the circuit under test, the calculated average current corresponding to an average leakage current of the circuit under test.

### Claim 4 (depends on 1)

The method of claim 1, further disabling power from the power source to the circuit under test at a time that is one of prior to determining the first voltage across the circuit under test, and after determining the first voltage across the circuit under test.

### Claim 5 (depends on 1)

The method of claim 1, further determining a first capacitance across the circuit under test, and determining a second capacitance across the circuit under test after the test duration.

### Claim 6 (depends on 1)

The method of claim 1, wherein the test duration is defined based on an expected current value and a total capacitance of the circuit under test.

### Claim 7 (depends on 1)

The method of claim 1, wherein the average current is calculated based on one or more of a difference between the first voltage and the second voltage, a total capacitance of the circuit under test, and the test duration.

### Claim 8

A device under test, comprising:
a power source;
a circuit under test; and
a testing device in communication with each of the power source and the circuit under test, the testing device configured to at least temporarily enable power from the power source to the circuit under test, determine a first voltage across the circuit under test, determine a second voltage across the circuit under test after a test duration, and calculate an average current of the circuit under test based at least partially on the first voltage, the second voltage and the test duration.

### Claim 9 (depends on 8)

The device under test of claim 8, wherein the testing device is configured to calculate an average active current of the circuit under test.

### Claim 10 (depends on 8)

The device under test of claim 8, wherein the testing device is configured to power down the circuit under test after enabling power from the power source to the circuit under test and prior to determining the first voltage across the circuit under test, and calculate an average leakage current of the circuit under test.

### Claim 11 (depends on 8)

The device under test of claim 8, wherein the testing device is configured to determine a first capacitance across the circuit under test, and determine a second capacitance across the circuit under test after the test duration.

### Claim 12 (depends on 8)

The device under test of claim 8, wherein the testing device is configured to define the test duration based on an expected current value and a total capacitance of the circuit under test.

### Claim 13 (depends on 8)

The device under test of claim 8, wherein the testing device is configured to calculate the average current based on one or more of a difference between the first voltage and the second voltage, a total capacitance of the circuit under test, and the test duration.

### Claim 14

A device for testing a circuit under test, comprising:
a timer module configured to define a test duration;
a measurement module configured to measure at least a voltage across the circuit under test;
a switch module configured to selectively couple a power source to the circuit under test; and
a sequencing module in communication with each of the timer module, the measurement module and the switching module, the sequencing module being configured to at least temporarily enable power from the power source to the circuit under test, measure a first voltage, measure a second voltage after the test duration, and calculate an average current of the circuit under test based at least partially on the first voltage, the second voltage and the test duration.

### Claim 15 (depends on 14)

The device of claim 14, wherein the circuit under test is disposed within a manufactured device under test, and wherein each of the timer module, the measurement module, the switch module, the sequencing module, and the power source is implemented and self-contained within the device under test.

### Claim 16 (depends on 14)

The device of claim 14, wherein the sequencing module is configured to calculate an average active current of the circuit under test.

### Claim 17 (depends on 14)

The device of claim 14, wherein the sequencing module is configured to power down the circuit under test after enabling power the power source to the circuit under test and prior to measuring the first voltage, and calculate an average leakage current of the circuit under test.

### Claim 18 (depends on 14)

The device of claim 14, wherein the measurement module is configured to determine a capacitance of the circuit under test, the sequencing module being configured to determine a first capacitance across the circuit under test, and determine a second capacitance across the circuit under test after the test duration.

### Claim 19 (depends on 14)

The device of claim 14, wherein the timer module is configured to define the test duration based on an expected current value and a total capacitance of the circuit under test.

### Claim 20 (depends on 14)

The device of claim 14, wherein the sequencing module is configured to calculate the average current based on one or more of a difference between the first voltage and the second voltage, a total capacitance of the circuit under test, and the test duration.
