# US 2017/0284169 A1 · A tool cemented in a wellbore containing a port plug dissolved by galvanic corrosion

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0284169 A1
- Document ID: US20170284169A1
- Status: Published application
- Kind: A1
- Application number: 14/655,040
- Filed: 2014-06-23
- Published: 2017-10-05
- Earliest claimed: 2014-06-23
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Zachary W. Walton; Michael L. Fripp; Zachary R. Murphree
- Web page: https://patentgrep.com/patent/US20170284169A1

## CPC

- E21B 34/063: {Valve or closure with destructible element, e.g. frangible disc (E21B34/103 takes precedence)}
- C25F 5/00: Electrolytic stripping of metallic layers or coatings
- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B 33/13: Methods or devices for cementing, for plugging holes, crevices or the like
- E21B 33/14: for cementing casings into boreholes
- E21B 43/26: by forming crevices or fractures
- C22C 21/00: Alloys based on aluminium
- E21B 43/25: Methods for stimulating production {(by vibrating earth formations E21B43/003)}
- E21B 2200/06: Sleeve valves
- E21B 2200/08: Down-hole devices using materials which decompose under well-bore conditions
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- C25F: PROCESSES FOR THE ELECTROLYTIC REMOVAL OF MATERIALS FROM OBJECTS; APPARATUS THEREFOR
- C22C: ALLOYS (treatment of alloys C21D, C22F)

## Abstract

A method of performing an operation in a wellbore comprising: introducing a tool into the wellbore, wherein the tool comprises: (A) a mandrel comprising a port; and (B) a plug, wherein the plug is located within the port, and wherein the plug comprises at least a first material, wherein the first material partially or wholly dissolves via corrosion; introducing a cement composition into an annulus located between the outside of the tool at least at the location of the port and the inside of the wellbore; and causing or allowing at least a portion of the first material to dissolve, wherein the step of causing or allowing is performed after the step of introducing the cement composition.

## Claims

### Claim 1

A method of performing an operation in a wellbore comprising:
introducing a tool into the wellbore, wherein the tool comprises:
(A) an mandrel comprising a port; and
(B) a plug,
wherein the plug is located within the port, and wherein the plug comprises at least a first material, wherein the first material partially or wholly dissolves via corrosion within the wellbore;
introducing a cement composition into an annulus located between the outside of the tool at least at the location of the port and the inside of the wellbore; and
causing or allowing at least a portion of the first material to dissolve, wherein the step of causing or allowing is performed after the step of introducing the cement composition.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the wellbore operation is selected from, completion operations, stimulation operations, production operations, or injection operations.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the tool further comprises a sliding sleeve, wherein the sliding sleeve is located adjacent to the port.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the plug is threadingly inserted into the port.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the shape and dimensions of the plug are selected such that the plug fits within the port and forms a seal.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the plug is positioned within the port such that the plug can withstand a specified pressure differential across the plug prior to dissolution of the first material.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the plug prevents the cement composition from flowing from the annulus into the port or through the port prior to dissolution of the first material.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the first material is a metal alloy.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the metal alloy is an aluminum alloy containing at least 85% by volume of aluminum metal.

### Claim 10 (depends on 1)

The method according to claim 1, wherein the plug further comprises a second material.

### Claim 11 (depends on 10)

The method according to claim 10, wherein the first material and the second material are metals or metal alloys.

### Claim 12 (depends on 11)

The method according to claim 11, wherein the metals or metal of the metal alloys are selected from the group consisting of, lithium, sodium, potassium, rubidium, cesium, beryllium, calcium, strontium, barium, radium, aluminum, gallium, indium, tin, thallium, lead, bismuth, scandium, titanium, vanadium, chromium, manganese, thorium, iron, cobalt, nickel, copper, zinc, yttrium, zirconium, niobium, molybdenum, ruthenium, rhodium, palladium, praseodymium, silver, cadmium, lanthanum, hafnium, tantalum, tungsten, terbium, rhenium, osmium, iridium, platinum, gold, neodymium, gadolinium, erbium, oxides of any of the foregoing, graphite, carbon, silicon, boron nitride, and any combinations thereof.

### Claim 13 (depends on 11)

The method according to claim 11, wherein the first material and the second material form a galvanic couple, and wherein the first material is the anode and the second material is the cathode of the couple, and wherein the first material dissolves via galvanic corrosion when both the first and second materials are in contact with an electrolyte.

### Claim 14 (depends on 13)

The method according to claim 13, wherein the electrolyte is the cement composition.

### Claim 15 (depends on 1)

The method according to claim 1, wherein at least a portion of the first material dissolves in a desired amount of time.

### Claim 16 (depends on 15)

The method according to claim 15, wherein the desired amount of time is at least 30 minutes after the cement composition has set within the annulus.

### Claim 17 (depends on 1)

The method according to claim 1, further comprising opening the port.

### Claim 18 (depends on 17)

The method according to claim 17, further comprising flowing a fluid through the opened port.

### Claim 19 (depends on 18)

The method according to claim 18, further comprising creating a fracture in a subterranean formation penetrated by the wellbore by flowing a fracturing treatment fluid through the opened port.

### Claim 20

A well system for use in a wellbore comprising:
a tool, wherein the tool comprises:
(A) an mandrel comprising a port; and
(B) a plug,
wherein the plug is located within the port, and wherein the plug comprises at least a first material, wherein the first material partially or wholly dissolves via corrosion; and
a cement composition, wherein the cement composition is located within an annulus between the outside of the tool at least at the location of the port and the inside of the wellbore.
