# US 2017/0283958 A1 · Dual layer fusion bond epoxy coating for continuous sucker rod

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0283958 A1
- Document ID: US20170283958A1
- Status: Published application
- Kind: A1
- Application number: 15/088,880
- Filed: 2016-04-01
- Published: 2017-10-05
- Earliest claimed: 2016-04-01
- Assignees: Weatherford Technology Holdings, LLC
- Applicants: Weatherford Technology Holdings, LLC
- Inventors: James FRASER; Lonnie James DUNN; Kyle Edward ADAM; Angela Marie Sultanian; Michael Giterman; Brian Funk
- Web page: https://patentgrep.com/patent/US20170283958A1

## CPC

- B05B 13/0436: {Installations or apparatus for applying liquid or other fluent material to elongated bodies, e.g. light poles, pipes (B05B13/0442, B05B13/0463 take precedence)}
- B05B 12/126: {responsive to target velocity, e.g. to relative velocity between spray apparatus and target (B05B9/06 takes precedence)}
- E21B 17/00: Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; {Cables;} Casings; Tubings
- E21B 47/0175: {Cooling arrangements}
- B05B 7/1404: {Arrangements for supplying particulate material}
- B05C 9/14: the auxiliary operation involving heating {or cooling}
- B05C 11/1015: {responsive to a conditions of ambient medium or target, e.g. humidity, temperature (B05C11/1005 takes precedence); responsive to position or movement of the coating head relative to the target}
- B05C 11/1023: {responsive to velocity of target, e.g. to web advancement rate}
- B05D 1/06: Applying particulate materials
- B05D 3/0245: {with induction heating}
- B05D 3/12: by mechanical means
- B05D 7/146: {to metallic pipes or tubes (processes for coating the interior of pipes B05D7/222)}
- B05D 7/148: {using epoxy-polyolefin systems in mono- or multilayers}
- B05D 7/546: {each layer being cured, at least partially, separately}
- B05D 2202/10: based on Fe
- B05D 2254/02: Applying the material on the exterior of the tube
- B05D 2504/00: Epoxy polymers
- B05D 2601/22: Silica
- E21B 43/126: {Adaptations of down-hole pump systems powered by drives outside the borehole, e.g. by a rotary or oscillating drive (powered by fluid E21B43/129)}
- B05B: SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES (spray-mixers with nozzles B01F25/72; processes for applying liquids or other fluent materials to surfaces by spraying B05D)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- B05C: APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL (spraying apparatus, atomising apparatus, nozzles B05B; plant for applying liquids or other fluent materials to objects by electrostatic spraying B05B5/08)
- B05D: PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL (conveying articles or workpieces through baths of liquid B65G, e.g. B65G49/02)

## Abstract

Embodiments of the present disclosure generally relate to apparatus and methods for manufacturing continuous sucker rods with protective coatings. One embodiment provides a coating system including a first drive station disposed on a first end of a coating line, a second drive station disposed on a second end of the coating line to move a continuous sucker rod along the coating line from the first drive station to the second drive station, a heater disposed along the coating line, and a first coating station disposed along the coating line.

## Claims

### Claim 1

A coating system, comprising:
a first drive station disposed on a first end of a coating line;
a second drive station disposed on a second end of the coating line to move a continuous sucker rod along the coating line from the first drive station to the second drive station;
a heater disposed along the coating line; and
a first coating station disposed along the coating line.

### Claim 2 (depends on 1)

The coating system of claim 1, wherein the first coating station is disposed downstream to the heater at a first predetermined distance so that the continuous sucker rod moving at a substantially constant speed arrives at the first coating station at a desired temperature.

### Claim 3 (depends on 2)

The coating system of claim 2, further comprising:
a second coating station disposed along the coating line downstream to the first coating station at a second predetermined distance.

### Claim 4 (depends on 3)

The coating system of claim 3, wherein each of the first and second coating stations comprises one or more spray guns configured to dispend a powder coating towards the continuous sucker rod passing through the corresponding coating station.

### Claim 5 (depends on 1)

The coating system of claim 1, further comprising:
a surface preparation station along the coating line.

### Claim 6 (depends on 5)

The coating system of claim 5, wherein the surface preparation station comprises:
a wheelabrator;
an air blaster; and
a solvent washer.

### Claim 7 (depends on 1)

The coating system of claim 1, further comprising an inspection station disposed along the coating line adjacent the second drive station.

### Claim 8 (depends on 1)

The coating system of claim 1, further comprising a repair station disposed along the coating line, wherein the first drive station moves the continuous sucker rod from the second drive station to the first drive station to align a stretch of the continuous sucker rod with the repair station.

### Claim 9 (depends on 1)

The coating system of claim 1, further comprising a central control unit.

### Claim 10

A method for coating a continuous sucker rod, comprising:
moving the continuous sucker rod at a substantially constant speed a long a coating line; and
while moving the continuous sucker rod,
heating the moving continuous sucker rod at a first location of the coating line; and
applying a first coating on an outer surface of the moving continuous sucker rod at a second location of the coating line.

### Claim 11 (depends on 10)

The method of claim 10, further comprising: while moving the continuous sucker rod,
applying a second coating on the moving continuous sucker rod at a third location on the coating line, wherein the third location is downstream to the second location, and a distance between the second and third locations is selected to allow the first coating to solidify for the second coating.

### Claim 12 (depends on 11)

The method of claim 11, further comprising, while moving the continuous sucker rod, preparing the outer surface of the continuous sucker rod at a fourth location along the coating line upstream to the first location.

### Claim 13 (depends on 12)

The method of claim 12, wherein preparing the outer surface comprises:
grit blasting the outer surface;
air blasting the outer surface; and
washing the outer surface with a solvent.

### Claim 14 (depends on 12)

The method of claim 12, further comprising, while moving the continuous sucker rod, inspecting the continuous sucker rod at a fifth location along the coating line downstream to the third location.

### Claim 15 (depends on 14)

The method of claim 14, further comprising:
moving the continuous sucker rod at a reverse direction along the coating line to align a stretch of the continuous sucker rod with a repair station disposed along the coating line; and
repairing the stretch of the continuous sucker rod at the repair station.

### Claim 16 (depends on 10)

The method of claim 10, wherein a distance between the first and second locations is selected to allow a surface temperature of the continuous sucker rod to reach a target value at the second location.

### Claim 17 (depends on 11)

The method of claim 11, wherein the first coating comprises a first fusion bond epoxy, and the second coating comprises a second fusion bond epoxy.

### Claim 18

A continuous sucker rod, comprising:
a body;
a first coating applied on an outer surface of the body, wherein the first coating comprises a thermosetting polymer and has a first thickness; and
a second coating applied on the second coating, wherein the second coating comprise a thermosetting polymer and has a second thickness, and the second thickness is bigger than the first thickness.

### Claim 19 (depends on 18)

The continuous sucker rod of claim 18, wherein the first coating is formed from a first fusion bond epoxy and the second coating is formed from a second fusion bond epoxy.

### Claim 20 (depends on 18)

The continuous sucker rod of claim 18, wherein the second thickness is between about 3 times to about 30 times the first thickness.