- Number: US 2017/0283014 A1
- Document ID: US20170283014A1
- Status: Published application
- Kind: A1
- Application number: 15/476,593
- Filed: 2017-03-31
- Published: 2017-10-05
- Earliest claimed: 2016-04-01
- Assignees: Mirade Consultants Ltd.
- Applicants: Mirade Consultants Ltd.
- Inventors: Timothy Robert Baker
- Web page: https://patentgrep.com/patent/US20170283014A1

## CPC

- B63B 35/44: Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)}
- B63B 25/12: closed
- B63B 27/25: for fluidised bulk material
- B63B 27/34: using pipe-lines {(anchoring arrangements for special vessels with mooring turrets B63B21/507; buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids B63B22/021)}
- E02B 17/00: Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs {or offshore constructions}; Construction methods therefor ({construction methods for floating platforms B63B75/00}; anchoring floating platforms B63B21/00; floating platforms, e.g. anchored, B63B35/44; {underwater reservoirs B65D88/78})
- E21B 41/0064: {Carbon dioxide sequestration (storing fluids in porous layers B65G5/005)}
- E21B 43/01: specially adapted for obtaining from underwater installations
- E21B 43/164: {Injecting CO2 or carbonated water (in combination with organic material C09K8/594)}
- E21B 43/40: Separation associated with re-injection of separated materials {(E21B43/385 takes precedence)}
- B63B 2035/4473: {Floating structures supporting industrial plants, such as factories, refineries, or the like}
- B63B 2035/4486: {Floating storage vessels, other than vessels for hydrocarbon production and storage, e.g. for liquid cargo}
- E02B 2017/0056: {Platforms with supporting legs}
- Y02C 20/40: of CO2
- Y02P 90/70: Combining sequestration of CO2 and exploitation of hydrocarbons by injecting CO2 or carbonated water in oil wells
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- Y02C: CAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

CO2 in the liquid or super-critical state is delivered by at least one carrier vessel from at least one CO2 storage site, which may be an onshore site, to an integrated offshore facility. The integrated offshore facility is provided with at least one on-site storage tank or vessel adapted to store CO2 in the liquid or super-critical state and with equipment for marine transfer of CO2 in the liquid or super-critical state. CO2 is utilised as required from said at least one on-site storage tank or vessel for EOR at said offshore site or for EGR at said offshore site by injection into a sub-sea oil or natural gas bearing reservoir and recovery of oil and/or natural gas from a resulting production stream.

## Claims

### Claim 1

A method for offshore CO2-based EOR or for offshore CO2-based EGR, in which method: CO2 in a state selected from the liquid and super-critical states is delivered by at least one carrier vessel from at least one CO2 storage site to an integrated offshore facility provided with at least one on-site storage means, selected from tanks and vessels, adapted to store CO2 in said state and with equipment for marine transfer of CO2 in said state; and CO2 is utilised as required from said at least one on-site storage means for EOR at said offshore site or for EGR at said offshore site by injection into a sub-sea oil or natural gas bearing reservoir and recovery of oil and/or natural gas from a resulting production stream.

### Claim 2 (depends on 1)

A method according to claim 1, wherein said at least one storage means includes a separate floating storage and offloading vessel without oil or natural gas production facilities provided at said integrated offshore facility, the said separate vessel being provided with said at least one storage tank adapted to store CO2 in said state.

### Claim 3 (depends on 2)

A method according to claim 2, wherein the said separate vessel comprises both plant and equipment which has the capability to process CO2-laden hydrocarbon production streams, separate CO2 from production fluids, and process and apply the necessary pressure and temperature regulation to CO2 so that it reaches the said state, and with plant and equipment to achieve the requisite CO2 pressure and temperature for injection into the a sub-sea oil field or a sub-sea natural gas field; whereby the said separate vessel may be supplied for CO2-based EOR or for CO2-based EGR at an offshore site not otherwise equipped for CO2-based EOR or for CO2-based EGR, and is adapted to be towed away from said site when no longer required thereat for use at a fresh offshore site.

### Claim 4 (depends on 1)

A method according to claim 1, wherein the integrated offshore facility further comprises equipment for separating CO2 from the production stream for direct re-injection or for storage in the at least one on-site storage means.

### Claim 5 (depends on 1)

A method according to claim 1, wherein the at least one CO2 storage site comprises a second integrated offshore facility provided with at least one on-site storage means selected from tanks or vessels adapted to store CO2 in said state and with equipment for marine transfer of CO2 in said state; the second integrated offshore facility having an oil/gas production stream including spare entrained CO2 selected from CO2 not required for use at the second integrated offshore facility and CO2 in excess of requirements for use at the second integrated offshore facility.

### Claim 6 (depends on 1)

A method according to claim 1, wherein the at least one CO2 storage site is at least one onshore site to which CO2 is delivered by at least one of pipeline, road and rail from at least one facility in which CO2 is produced as a waste product; and wherein the CO2 is liquefied or rendered supercritical at one of the said facility and the onshore site.

### Claim 7

Apparatus for offshore CO2-based EOR or for offshore CO2-based EGR comprising:
an integrated offshore facility provided with:
at least one on-site storage means, selected from tanks and vessels, adapted to store CO2 in a state selected from liquid and super-critical states, and equipment for marine transfer of CO2 in said state,
equipment for injecting CO2 into a sub-sea oil field for EOR or into a sub-sea natural gas field for EGR; and
equipment for recovering oil and/or natural gas from a resulting production stream;
and at least one carrier vessel adapted to deliver CO2 in said state from at least one CO2 storage site remote from the integrated offshore facility, preferably an onshore site, to the said integrated offshore facility.

### Claim 8 (depends on 7)

Apparatus according to claim 7, wherein the integrated offshore facility comprises one of a concrete gravity-based structure located in fixed position by the ballasted weight of the structure resting on the seabed, and a steel gravity based structure in which the topsides are supported by a combined tank and steel jacket which is located on the seabed by virtue of ballasted tanks capable of being emptied to allow the structure to be floated for relocation; and the said on-site storage tanks adapted to store CO2 in the liquid or super-critical state are separate from any ballasted tanks and provided in the ballasted structure or mounted on the seabed.

### Claim 9 (depends on 7)

Apparatus according to claim 7, wherein the integrated offshore facility comprises a floating structure comprising one of (a) a floating production storage and offloading structure in which a marine vessel has a hull and a deck, the hull being one of a ship-like shape and a generally cylindrical shape and being provided with oil storage tanks therewithin for periodic offloading of oil to an oil tanker, and the deck being provided with hydrocarbon processing equipment, (b) a floating natural gas structure having a hull and a deck, and comprising a vessel-based natural gas production facility provided with topsides plant comprising natural gas liquefaction plant on its deck and liquefied natural gas storage tanks in its hull for periodic offloading to a liquefied natual gas tanker, (c) a spar tethered to the seabed and comprising a vertically oriented cylindrical section located below the waterline and a floating platform supported by the cylindrical section and comprising topsides including oil production facilities, oil storage tanks being located within the vertical cylindrical section for periodic unloading to an oil tanker, (d) a semi-submersible structure comprising a buoyant platform provided with ballasted tanks for oil or liquefied natural gas located below the waterline, the semi-submersible structure being tied to the seabed, and (e) a tension leg platform in which a buoyant platform is located by mooring tethers in tension to ensure its vertical position relative to the seabed; and wherein the said storage tanks adapted to store CO2 in said state are provided in the floating structure.

### Claim 10 (depends on 7)

Apparatus according to claim 7, wherein the integrated offshore facility comprises a jack-up structure in which a barge type production platform provided with legs and towed to a selected position is jacked up on the said legs directly from the seabed or from an optional ballasted steel tank located on the seabed, and the said storage tanks adapted to store CO2 in said state are provided in one of the barge and the optional ballasted tank.

### Claim 11 (depends on 7)

Apparatus according to claim 7, wherein the integrated offshore facility is provided with a separate floating storage and offloading vessel without oil or natural gas production facilities, the vessel being provided with the said storage tanks adapted to store CO2 in said state.

### Claim 12 (depends on 11)

Apparatus according to claim 11, wherein the separate vessel comprises both with plant and equipment which has the capability to process CO2-laden hydrocarbon production streams, separate CO2 from production fluids, and process and apply the necessary pressure and temperature regulation to CO2 so that it reaches said state; and with plant and equipment to achieve the requisite CO2 pressure and temperature for storage in said at least one on-site storage means or for injection into the sub-sea oil field or the sub-sea natural gas field.

### Claim 13 (depends on 7)

Apparatus according to claim 7, wherein the integrated offshore facility additionally comprises both plant and equipment which has the capability to process CO2-laden hydrocarbon production streams, separate CO2 from production fluids, and process and apply the necessary pressure and temperature regulation to CO2 so that it reaches said state; and with plant and equipment to achieve the requisite CO2 pressure and temperature for storage in said at least one on-site storage means or for injection into the sub-sea oil field or the sub-sea natural gas field.

### Claim 14

An integrated offshore oil or natural gas facility comprising:
at least one on-site storage means, selected from tanks and vessels, adapted to store CO2 in a state selected from liquid and super-critical states, and equipment for marine transfer of CO2 in said state,
equipment for injecting CO2 into a sub-sea oil field for EOR or into a sub-sea natural gas field for EGR; and
equipment for recovering oil and/or natural gas from a resulting production stream.

### Claim 15 (depends on 14)

An integrated offshore oil or natural gas facility according to claim 14, additionally comprising both with plant and equipment which has the capability to process CO2-laden hydrocarbon production streams, separate CO2 from production fluids, and process and apply the necessary pressure and temperature regulation to CO2 so that it reaches said state; and with plant and equipment to achieve the requisite CO2 pressure and temperature for storage in said at least one on-site storage means or for injection into a sub-sea oil field or a sub-sea natural gas field.