# US 2017/0282266 A1 · Method for producing a primary material for a cutting tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0282266 A1
- Document ID: US20170282266A1
- Status: Published application
- Kind: A1
- Application number: 15/508,255
- Filed: 2015-09-03
- Published: 2017-10-05
- Earliest claimed: 2014-09-05
- Assignees: Voestalpine Precision Strip GmbH
- Applicants: Voestalpine Precision Strip GmbH
- Inventors: Manfred HARRER
- Web page: https://patentgrep.com/patent/US20170282266A1

## CPC

- B23D 65/00: Making tools for sawing machines or sawing devices for use in cutting any kind of material
- B23K 15/006: {of rectilinear seams}
- B23K 26/0619: {with spots located on opposed surfaces of the workpiece}
- B23K 26/26: of rectilinear seams
- B23K 31/025: {Connecting cutting edges or the like to tools; Attaching reinforcements to workpieces, e.g. wear-resisting zones to tableware}
- C22C 38/34: with more than 1.5% by weight of silicon
- C22C 38/44: with molybdenum or tungsten
- C22C 38/46: with vanadium
- C22C 38/52: with cobalt
- C22C 38/58: with more than 1.5% by weight of manganese
- B23K 2101/20: Tools
- B23K 2103/04: Steel {or steel} alloys
- B23D: PLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR (making toothed gears or the like B23F; cutting metal by applying heat locally B23K; arrangements for copying or controlling B23Q)
- B23K: SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- C22C: ALLOYS (treatment of alloys C21D, C22F)

## Abstract

A method for producing a primary material for a cutting tool, for example a primary material for a saw blade or a saw band, in which a band-shaped carrier of a metal carrier material and a wire of high-speed steel are continuously brought together along a lateral edge of the band-shaped carrier and transported into a welding device and the band-shaped carrier is welded to the wire along the lateral edge of the carrier to produce a bimetal band. The band-shaped carrier and the edge wire are welded to one another by at least a first welding device, which is arranged on one side of the band-shaped carrier, and at least a second welding device, which is arranged on the opposite side of the band-shaped carrier.

## Claims

### Claim at position 1

1-10. (canceled)

### Claim 11

A method for producing a primary material for a cutting tool, or a primary material for a saw blade or a saw band, comprising:
bringing together continuously a band-shaped carrier of a metal carrier material and an edge wire of a high-speed steel along a lateral edge of the band-shaped carrier;
transporting the brought together band-shaped carrier and the edge wire into a welding device;
welding the band-shaped carrier to the edge wire along the lateral edge of the carrier to produce a bimetal band, wherein
the band-shaped carrier and the edge wire are welded to one another by at least a first laser welding device arranged on one side of the band-shaped carrier, and at least a second laser welding device arranged on the opposite side of the band-shaped carrier.

### Claim 12 (depends on 11)

The method as claimed in claim 11, wherein the first welding device and the second welding device are offset with respect to one another in a transporting direction of the band-shaped carrier.

### Claim 13 (depends on 11)

The method as claimed in claim 11, wherein power of the welding devices is controllable in an open-loop or closed-loop manner.

### Claim 14 (depends on 13)

The method as claimed in claim 13, wherein angular distortion and a weld seam elevation of the welded assembly including the band-shaped carrier and the edge wire are recorded and the power of the first and second welding devices lying opposite one another is configured such that angular distortion and weld seam elevation are minimized.

### Claim 15 (depends on 11)

The method as claimed in claim 11, wherein a weld seam created between the carrier and the edge wire is not machined before a possible dressing of the bimetal band.

### Claim 16 (depends on 15)

The method as claimed in claim 15, wherein the bimetal band is not dressed.

### Claim 17 (depends on 11)

A saw blade or saw band, wherein the saw blade or saw band comprises a primary material produced by a method as claimed in claim 11.

### Claim 18 (depends on 17)

The saw blade or saw band as claimed in claim 17, wherein the carrier material has the following composition (figures given in % by weight):
carbon (C)
0.2 to 1.5
silicon (Si)
up to 2.0
manganese (Mn)
up to 2.0
chromium (Cr)
up to 7.0
molybdenum (Mo)
up to 3.0
nickel (Ni)
up to 1.5
vanadium (V)
up to 0.6
tungsten (W)
up to 5.0
iron (Fe) and smelting-induced accompanying elements and impurities as the remainder.

### Claim 19 (depends on 17)

The saw blade or saw band as claimed in claim 17, wherein the high-speed steel has the following composition (figures given in % by weight):
carbon (C)
0.5 to 2.5
silicon (Si)
up to 1.5
manganese (Mn)
up to 0.8
chromium (Cr)
2 to 6.0
molybdenum (Mo)
up to 11.0
vanadium (V)
up to 10.0
tungsten (W)
up to 20.0
cobalt (Co)
up to 15.0
iron (Fe) and smelting-induced accompanying elements and impurities as the remainder;
the proportion of the elements Si+V+Mo+W/2 being >5% by weight.
