# US 2017/0257973 A1 · Deployable Barrier For Data Center

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0257973 A1
- Document ID: US20170257973A1
- Status: Published application
- Kind: A1
- Application number: 15/601,990
- Filed: 2017-05-22
- Published: 2017-09-07
- Earliest claimed: 2014-06-27
- Assignees: Amazon Technologies, Inc.
- Applicants: Amazon Technologies, Inc.
- Inventors: Peter George Ross; Timothy Logan Sadler
- Web page: https://patentgrep.com/patent/US20170257973A1

## CPC

- H05K 7/1497: {Rooms for data centers; Shipping containers therefor}
- E04H 5/00: Buildings or groups of buildings for industrial or agricultural purposes
- H05K 7/20745: {within rooms for removing heat from cabinets, e.g. by air conditioning device}
- E04H 2005/005: {Buildings for data processing centers}
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)

## Abstract

Deployable barriers are reversibly deployed in a data center hall to partition the data center. The hall is partitioned into an operational area, where rack computer systems are installed, a non-operational area, and a staging area where support infrastructure is at least partially installed. A barrier can be collapsed to incorporate the staging area into the operational area, thereby expanding the operational area, when rack computer systems are to be installed in the staging area. A barrier deployed in the non-operational area establishes another staging area. A barrier includes a deployment mechanism which extends through a space in the data center to enable a partition to be extended to partition the hall. The barrier can be mounted and deployed on support infrastructure, so that the deployed barrier and a side portion of the support infrastructure collectively partition the hall.

## Claims

### Claim at position 1

-4. (canceled)

### Claim 5

An apparatus, comprising:
a reversibly deployable barrier configured to reversibly partition a portion of a data center hall into at least two separate areas, the reversibly deployable barrier comprising:
a mounting element configured to reversibly mount the barrier in the portion of a data center hall between the two separate areas to be partitioned; and
a deployment mechanism configured to reversibly extend from the mounting element through an interior space of the data center hall to enable extension, through the interior space, of a collapsible partition element which reversibly partitions the portion of the data center hall into at least two separate areas.

### Claim 6 (depends on 5)

The apparatus of claim 5, wherein:
the deployment mechanism comprises:
at least one reversibly extendible mast structure; and
a boom support element, coupled to an extendible end of the reversibly extendible mast structure, configured to receive and support a partition boom structure at the extendible end, wherein the collapsible partition element is coupled to the partition boom structure; and
to reversibly extend from the mounting element through the interior space of the data center hall to enable extension of the collapsible partition element, the deployment mechanism is configured to:
extend the reversibly extendible mast structure upwards from the mounting element to a fully-extended configuration, such that the partition boom structure is supported by the boom support element at an elevated position proximate to a roof structure of the data center hall.

### Claim 7 (depends on 6)

The apparatus of claim 6, wherein:
the boom support element is configured to pivot, based at least in part upon the partition boom structure contacting an angled roof structure, such that the partition boom structure is held flush with at least a portion of the angled roof structure.

### Claim 8 (depends on 6)

The apparatus of claim 6, wherein:
the data center hall comprises at least one computer room module configured to support at least one set of rack computer systems, wherein the computer room module comprises at least one side wall element and at least one top end; and
the mounting element is configured to reversibly mount the barrier on the top end of the computer room module, such that at least the partition element of the barrier and the at least one side wall element of the computer room module collectively partition the data center hall into at least two separate areas.

### Claim 9 (depends on 8)

The apparatus of claim 8, wherein:
to reversibly mount the barrier on the top end of the computer room module, the mounting element comprises at least one boss structure configured to be inserted into a vertically-oriented structural member of a computer room module in the data center hall.

### Claim 10 (depends on 6)

The apparatus of claim 6, wherein:
to reversibly extend upwards from the mounting element towards a roof structure of the data center hall to enable extension of the collapsible partition element, the deployment mechanism is configured to:
rotate the reversibly extendible mast structure, in a collapsed configuration, from a horizontal stowed orientation to a vertical orientation.

### Claim 11 (depends on 5)

The apparatus of claim 5, wherein:
to reversibly partition a portion of a data center hall into at least two separate areas, the barrier is configured to:
collapse the deployment mechanism to remove a partition between an operational area and a staging area, where the operational area includes a set of rack computer systems and the staging area is configured to accommodate at least one set of rack computer systems, such that the staging area is incorporated into the operational area;
relocate to another separate portion of the data center hall which does not include rack computer systems and support infrastructure; and
re-deploy the deployment mechanism in the other separate portion of the data center hall to partition the other separate portion into an additional staging area and a remainder area.

### Claim 12

A method, comprising:
incrementally expanding a portion of a data center hall used to support computing operations, based at least in part upon installation of additional rack computer systems in the data center hall, the incrementally expanding comprising:
deploying a plurality of barriers within the data center hall to partition the data center hall into a plurality of areas, the plurality of areas comprising:
an operational area comprising a set of rack computer systems and a set of support infrastructure configured to support computing operations by the set of rack computer systems;
a non-operational area comprising a portion of the data center hall that does not include at least rack computer systems and support infrastructure; and
a staging area, bounded by at least two deployed barriers and located between the operational area and non-operational area, comprising at least one additional set of support infrastructure and does not include rack computer systems; and
collapsing at least one of the plurality of barriers to incorporate the staging area into the operational area, based at least in part upon installation of an additional set of rack computer systems in the staging area, such that the operational area is expanded to include the additional set of rack computer systems and the additional set of support infrastructure.

### Claim 13 (depends on 12)

The method of claim 12, comprising:
subsequent to collapsing at least one of the plurality of barriers to incorporate the staging area into the operational area, re-deploying the collapsed at least one of the plurality of barriers to partition the non-operational area into a remainder non-operational area and an additional staging area, located between the operational area and the remainder non-operational area, to configure the additional staging area to accommodate at least one set of support infrastructure.

### Claim 14 (depends on 12)

The method of claim 12, wherein:
each of the plurality of barriers comprises:
a partition element coupled, at one end, to at least one channel trolley configured to roll along a channel, such that the partition element is configured to hang from the at least one channel trolley to partition a portion of the data center hall into at least two areas; and
deploying at least one of the plurality of barriers comprises:
moving the at least one channel trolley through a channel extending over the portion of the data center hall to pull the partition element through the portion of the data center hall to at least partially partition the portion of the data center hall into at least two areas.

### Claim 15 (depends on 12)

The method of claim 12, wherein:
deploying at least one of the plurality of barriers comprises deploying at least two separate barriers to at least partially partition a portion of the data center into at least two areas; and
coupling the at least two separate barriers together, such that the at least two separate barriers collectively partition the portion of the data center into the at least two areas.

### Claim 16 (depends on 12)

The method of claim 12, wherein:
deploying at least one of the plurality of barriers comprises:
mounting the barrier on a top end of a computer room module in the data hall and deploying the barrier upwards from the top end towards a roof structure of the data center hall, such that a wall element of the computer room module and the barrier collectively partition a portion of the data center hall into at least two areas.

### Claim 17 (depends on 16)

The method of claim 16, wherein:
each of the plurality of barriers comprises:
a mounting component configured to mount the respective barrier on a structural member of the computer room module;
at least one reversibly extendible mast structure; and
a boom support element, coupled to an extendible end of the reversibly extendible mast structure, configured to receive and support a partition boom structure at the extendible end; and
deploying at least one of the plurality of barriers comprises:
mounting the mounting component on a portion of a structural member of a computer room module that is located between at least two areas of the data center hall to be partitioned;
extending the reversibly extendible mast structure upwards to a fully-extended configuration, such that the partition boom structure is supported by the boom support element at an elevated position proximate to a roof structure of the data center hall; and
extending a partition element between the partition boom structure and the computer room module to partition the at least two areas in the data center hall.

### Claim 18 (depends on 17)

The method of claim 17, wherein:
the boom support element is configured to pivot, based at least in part upon the reversibly extendible mast structure being extended upwards, such that the partition boom structure received in the boom support element contacts an angled roof structure, such that the partition boom structure is held flush with at least a portion of the angled roof structure.

### Claim 19 (depends on 5)

The apparatus of claim 5, wherein:
the mounting element comprises a fixed structural element of the data center hall; and
the deployment mechanism comprises a set of coupling elements configured to couple with the fixed mounting element to support the collapsible partition element.

### Claim 20 (depends on 19)

The apparatus of claim 19, wherein the coupling elements each comprise a trolley configured to couple with a channel of the fixed structural element of the data center hall and roll through at least a portion of the channel.

### Claim 21 (depends on 5)

The apparatus of claim 5, wherein the collapsible partition element is inflatable.

### Claim 22 (depends on 21)

The apparatus of claim 21, wherein the deployment mechanism comprises an air conduit configured to convey air to or from the collapsible partition to inflate or deflate the collapsible partition.

### Claim 23 (depends on 12)

The method of claim 12, wherein deploying the plurality of barrier comprises:
inflating one or more collapsible partition elements.

### Claim 24 (depends on 12)

The method of claim 12, wherein collapsing the at least one of the barriers comprises:
deflating one or more collapsible partition elements.