# US 2017/0256952 A1 · Power management system and power management method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0256952 A1
- Document ID: US20170256952A1
- Status: Published application
- Kind: A1
- Application number: 15/510,395
- Filed: 2015-09-16
- Published: 2017-09-07
- Earliest claimed: 2014-09-16
- Assignees: Sekisui Chemical Co., Ltd.
- Applicants: Sekisui Chemical Co., Ltd.
- Inventors: Yasuhiro SUGAHARA; Junichi MATSUZAKI; Akihiro UENISHI; Nobuhiro MORI
- Web page: https://patentgrep.com/patent/US20170256952A1

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 50/06: Energy or water supply
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 7/35: with light sensitive cells
- H02J 7/50: acting upon multiple batteries simultaneously or sequentially
- H02S 40/38: Energy storage means, e.g. batteries, structurally associated with PV modules
- H02J 2101/24: Photovoltaics
- H02J 2105/12: supplying households or buildings
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 70/30: Systems combining energy storage with energy generation of non-fossil origin
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02S: GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES (obtaining electrical energy from radioactive sources G21H1/12; light sensitive inorganic semiconductor devices H10F; light sensitive organic semiconductor devices H10K30/00; thermoelectric devices H10N10/00; pyroelectric devices H10N15/00)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A power management system includes: a power consumption estimation unit which, based on a first filter estimation function to make estimation by measured value of power consumption in a limited period of past measurement, estimates power consumption of next period of measurement in a first customer facility as an estimated power consumption; a power generation estimation unit which, based on a second filter estimation function to make estimation by measured value of power generation in a limited period of past measurement, estimates power generation by a power generator of next period of measurement in the first customer facility as an estimated power generation; an surplus power estimation unit which obtains an estimated surplus power which is a difference between the estimated power generation and the estimated power consumption; and a power management unit for controlling each of the charge and discharge of the storage battery.

## Claims

### Claim 1

A power management system, which is connected to a system power supply, and which, with respect to a storage battery in a first customer facility having a storage battery and a power generator as electrical equipment, controls discharge thereof to the first customer facility or charge thereof with surplus power generated in the first customer facility, the power management system comprising:
a power consumption estimation unit which, based on a first filter estimation function to make estimation by measured value of power consumption in a limited period of past measurement, estimates power consumption of next period of measurement in the first customer facility as an estimated power consumption,
a power generation estimation unit which, based on a second filter estimation function to make estimation by measured value of power generation in a limited period of past measurement, estimates power generation by the power generator of next period of measurement in the first customer facility as an estimated power generation,
an surplus power estimation unit which obtains an estimated surplus power which is a difference between the estimated power generation and the estimated power consumption, and
a power management unit for controlling each of the charge and discharge of the storage battery, based on the estimated surplus power obtained by the surplus power estimation unit.

### Claim 2 (depends on 1)

The power management system according to claim 1, which controls each of the charge and discharge of a plurality of the storage batteries of customer facilities including the first customer facility having the storage battery and the power generator as electrical equipment and a second customer facility lacking one of the storage battery and the power generator, both being connected commonly to the system power supply,
wherein the power consumption estimation unit, the power generation estimation unit and the surplus power estimation unit respectively obtain the estimated power consumption, the estimated power generation and the estimated surplus power, and
the power management unit controls the charge and discharge of the storage battery of each of the customer facilities, based on the estimated surplus power of each of the customer facilities.

### Claim 3 (depends on 1)

The power management system according to claim 1, wherein the first filter estimation function for obtaining the estimated power consumption is defined by equation (1) below, and the weighting parameter w1 for each tap in the filter estimation function is set by a predetermined first function, and
wherein the second filter estimation function for obtaining the estimated power generation is defined by equation (2) below, and the weighting parameter w2 for each tap in the filter estimation function is set by a predetermined second function,
c(t+1)=w1(0)c(t)+w1(1)c(t−1)+w1(2)c(t−2)+ . . . w1(n−1)c(t−n+1) (1)
w1(q)=2q(1−β)/(n(n−1))+β/n (2)
wherein β is a weight coefficient, n is a tracking number, and q is an order of weight function.

### Claim 4 (depends on 3)

The power management system according to claim 3, wherein the first function to set the weighting parameter w1 for each tap in the first filter estimation function for obtaining the estimated power consumption is defined by equation (3) below, and
the second function to set the weighting parameter w2 for each tap in the second filter estimation function for obtaining the estimated power generation is defined by equation (4) below,
g(t+1)=w2(0)g(t)+w2(1)g(t−1)+w2(2)g(t−2)+ . . . w2(n−1)g(t−m+1) (3)
W2(r)=2r(1−α)/(m(m−1))+α/m (4)
wherein α is a weight coefficient, m is a tracking number, and r is an order of weight function.

### Claim 5 (depends on 4)

The power management system according to claim 4, wherein each of the weighting coefficient β and the tracking number n in the first function is previously set as an estimation pattern which is a set of different numerical values corresponding to control modes, and
each of the weighting coefficient α and the tracking number m in the second function is previously set as an estimation pattern which is a set of different numerical values corresponding to control modes.

### Claim 6 (depends on 1)

The power management system according to claim 1, wherein the measured value of power generation is a power generated by the power generator which is measured in a latest limited period of past measurement.

### Claim 7 (depends on 1)

The power management system according to claim 1, wherein the measured value of power consumption is a power consumed in the customer facility which is measured in a latest limited period of past measurement.

### Claim 8 (depends on 2)

The power management system according to claim 2, wherein the measured value of power generation is a total of the measured values of power generation in a plurality of the customer facilities.

### Claim 9 (depends on 2)

The power management system according to claim 2, wherein the measured value of power consumption is a total of the measured values of power consumption in a plurality of the customer facilities.

### Claim 10 (depends on 2)

The power management system according to claim 2, wherein the estimated power generation is a total of values of the estimated power generation in an arbitrary plurality of the customer facilities.

### Claim 11 (depends on 2)

The power management system according to claim 2, wherein the estimated power consumption is a total of values of the estimated power consumption in an arbitrary plurality of the customer facilities.

### Claim 12 (depends on 2)

The power management system according to claim 2, wherein the estimated power generation is a total of values of the estimated power generation in the customer facilities.

### Claim 13 (depends on 2)

The power management system according to claim 2, wherein the estimated power consumption is a total of values of the estimated power consumption in the customer facilities.

### Claim 14 (depends on 2)

The power management system according to claim 2, wherein the difference between the estimated power generation and the estimated power consumption is a total of values of the estimated power generation in an arbitrary plurality of the customer facilities.

### Claim 15 (depends on 2)

The power management system according to claim 2, wherein the difference between the estimated power generation and the estimated power consumption is a difference between the total of values of the estimated power generation in the customer facilities and the total of values of the estimated power consumption in the customer facilities.

### Claim 16 (depends on 1)

The power management system according to claim 1, wherein the control of the discharge and charge of the storage battery based on a differential power obtained in the period of measurement is performed for a control period which is the same as the period of measurement or for a control period formed by a plurality of periods of measurement, depending on mode of the control.

### Claim 17

A power management method for controlling a power management system which is connected to a system power supply, and which, with respect to a storage battery in a first customer facility having a storage battery and a power generator as electrical equipment, controls discharge thereof to the first customer facility or charge thereof with surplus power generated in the first customer facility, the power management method comprising:
a power consumption estimation step wherein, based on a first filter estimation function to make estimation by measured value of power consumption in a limited period of past measurement, a power consumption estimation unit estimates power consumption of next period of measurement in the first customer facility as an estimated power consumption,
a power generation estimation step wherein, based on a second filter estimation function to make estimation by measured value of power generation in a limited period of past measurement, a power generation estimation unit estimates power generation of next period of measurement in the first customer facility as an estimated power generation,
a surplus power estimation step wherein a surplus power estimation unit obtains an estimated surplus power which is a difference between the estimated power generation and the estimated power consumption, and
a power management step wherein a power management unit controls each of the charge and discharge of the storage battery, based on the estimated surplus power obtained by the surplus power estimation unit.

### Claim 18 (depends on 17)

The power management method according to claim 17, which controls each of the charge and discharge of a plurality of the storage batteries of customer facilities including the first customer facility having the storage battery and the power generator as electrical equipment and a second customer facility lacking one of the storage battery and the power generator, while being connected to the system power supply,
wherein the power consumption estimation unit, the power generation estimation unit and the surplus power estimation unit respectively obtain the estimated power consumption, the estimated power generation and the estimated surplus power, and
the power management unit controls the charge and discharge of the storage battery of each of the customer facilities, based on the estimated surplus power of each of the customer facilities.

### Claim 19 (depends on 17)

The power management method according to claim 17, which controls each of the charge and discharge of a plurality of the storage batteries of customer facilities including the first customer facility having the storage battery and the power generator as electrical equipment and a second customer facility lacking one of the storage battery and the power generator, while being connected to the system power supply,
wherein the power consumption estimation unit, the power generation estimation unit and the surplus power estimation unit respectively obtain the estimated power consumption, the estimated power generation and the estimated surplus power, and
the power management unit controls the charge and discharge of the storage battery of each of the customer facilities, based on the estimated surplus power of each of the customer facilities, and performs an output suppression control, based on a total surplus power and a total chargeable power.

### Claim 20 (depends on 17)

The power management method according to claim 17, wherein the power management unit obtains a total surplus power which is a total surplus of powers generated by the power generators in the customer facilities, obtains a total chargeable power which is a total of chargeable powers of the storage batteries in the customer facilities, and requests an output suppression to the customer facilities when the total surplus power exceeds the total chargeable power.

### Claim 21 (depends on 19)

The power management method according to claim 19, which controls each of the charge and discharge of a plurality of the storage batteries of customer facilities including the first customer facility comprising the storage battery and the power generator as electrical equipment and a second customer facility lacking one of the storage battery and the power generator, while being connected commonly to the system power supply,
wherein the power consumption estimation unit, the power generation estimation unit and the surplus power estimation unit respectively obtain the estimated power consumption, the estimated power generation and the estimated surplus power, and
the power management unit controls the charge and discharge of the storage battery of each of the customer facilities, based on the estimated surplus power of each of the customer facilities.

### Claim 22 (depends on 20)

The power management method according to claim 20, wherein the power management unit performs the output suppression control from the second customer facility lacking the storage battery.

### Claim 23 (depends on 21)

The power management method according to claim 21, wherein the power management unit performs the output suppression control from the first customer facility with the storage battery thereof being fully charged and the second customer facility having the storage battery.
