# US 2017/0256429 A1 · Systems and methods for dynamic semiconductor process scheduling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0256429 A1
- Document ID: US20170256429A1
- Status: Published application
- Kind: A1
- Application number: 15/598,169
- Filed: 2017-05-17
- Published: 2017-09-07
- Earliest claimed: 2012-08-28
- Assignees: ASM IP Holding B.V.
- Applicants: ASM IP Holding B.V.
- Inventors: Keith R. Lawson; Michael E. Givens
- Web page: https://patentgrep.com/patent/US20170256429A1

## CPC

- H10P 72/0612: {Production flow monitoring, e.g. for increasing throughput}
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G05B 2219/45031: Manufacturing semiconductor wafers
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Embodiments of the present disclosure can help increase throughput and reduce resource conflicts and delays in semiconductor processing tools. An exemplary method according to various aspects of the present disclosure includes analyzing, by a computer program operating on a computer system, a plurality of expected times to complete each of a respective plurality of actions to be performed by a semiconductor processing tool, the semiconductor processing tool including a first process module and a second process module. The method further includes generating, by the computer program, a wafer processing plan based on the analysis, wherein the wafer processing plan, when executed by the processing tool, causes the semiconductor processing tool to: load a first wafer into the first process module; unload a second wafer from the second process module after loading the first wafer into the first process module; load the third wafer into the first process module after unloading the second wafer from the second process module; and unload the first wafer from the first process module after loading the third wafer into the first process module.

## Claims

### Claim 1

(canceled)

### Claim 2

A method comprising:
analyzing, by a computer program operating on a computer system, a plurality of expected times to complete each of a respective plurality of actions to be performed by a semiconductor processing tool comprising an expected time to transfer a first wafer from a wafer handling chamber to a first process module, an expected time to transfer the first wafer from the first process module to the wafer handling chamber, an expected time to transfer a second wafer from the wafer handling chamber to a second process module, and an expected time to transfer the second wafer from the second process module to the wafer handling chamber, the semiconductor processing tool including the first process module and the second process module; and
automatically generating, by a computer program, a wafer processing plan based on the analysis, wherein the wafer processing plan, when executed by the processing tool, causes the semiconductor processing tool to:
load the a first wafer into the first process module;
load the a second wafer into the second process module;
unload the first wafer from the first process module after loading the second wafer into the second process module;
load a third wafer into the first process module after unloading the first wafer form the first process module; and
unload the second wafer from the second process module after loading the third wafer into the first process module;
wherein the semiconductor processing tool includes the wafer handling chamber in communication with the first process module and the second process module, and
wherein the computer program measures an actual time to complete the steps of load the first wafer, load the second wafer, unload the first wafer, load the third wafer, and unload the second wafer, and automatically adjusts future wafer processing plans based on the actual time to complete steps of load the first wafer, load the second wafer, unload the first wafer, load the third wafer, and unload the second wafer.

### Claim 3 (depends on 2)

The method of claim 2, wherein at least one of the plurality of expected times is an estimation of the time required to complete an action.

### Claim 4 (depends on 2)

The method of claim 2, wherein at least one of the plurality of expected times is a measured time for the time required to complete an action.

### Claim 5 (depends on 2)

The method of claim 2, wherein the plurality of expected times include a first expected time required to perform an action from the plurality of actions, the method further comprising:
measuring an actual time for the semiconductor processing tool to perform the action; and
comparing the actual time to the first expected time;
wherein the step of the computer program automatically adjusts future wafer processing plans comprises replacing the first expected time with the measured time in the plurality of expected times for subsequent wafer process plans in response to the difference between the measured time and the first expected time exceeding a predetermined amount.

### Claim 6 (depends on 2)

The method of claim 2, wherein the plurality of expected times includes a first expected time required to complete an action from the plurality of actions, the method further comprising:
measuring an actual time for the semiconductor processing tool to perform the action;
comparing the actual time to the first expected time; and
generating an alert, via a user interface coupled to the computer system, in response to the difference between the measured time and the first expected time exceeding a predetermined amount.

### Claim 7 (depends on 6)

The method of claim 6, wherein the alert identifies a component of the semiconductor processing tool that may be malfunctioning to cause the difference between the measured time and the first expected time.

### Claim 8 (depends on 2)

The method of claim 2, further comprising:
generating a first wafer processing plan based on first plurality of expected times for a respective plurality of actions;
measuring actual times for a semiconductor processing tool to perform the plurality of actions in the first wafer processing plan;
generating a second plurality of times by modifying at least one time from the first plurality of expected times based on the measured times for the first wafer processing plan; and
automatically generating a second wafer processing plan based on the second plurality of times.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
measuring actual times for the semiconductor processing tool to perform the plurality of actions in the second wafer processing plan;
generating a third plurality of times by modifying at least one time from the second plurality of expected times based on the measured times for the second wafer processing plan; and
automatically generating a third wafer processing plan based on the third plurality of times.

### Claim 10 (depends on 2)

The method of claim 2, wherein the wafer handling chamber comprises a robot for transferring wafers to and from the first process module and the second process module, wherein analyzing the plurality of expected times includes identifying a first expected time when the robot is in a first position, and identifying a second expected time when the robot is in a second position, the first expected time being shorter than the second expected time.

### Claim 11 (depends on 2)

The method of claim 2, wherein analyzing the plurality of expected times includes analyzing a sum of expected times associated with processing a wafer in one or more of the first process module and the second process module.

### Claim 12 (depends on 2)

The method of claim 2, wherein analyzing the plurality of expected times includes analyzing an expected time for one or more of:
an expected time to transfer a wafer from the wafer handling chamber to the first process module;
an expected time to transfer a wafer from the first process module to the wafer handling chamber;
an expected time to transfer a wafer from the wafer handling chamber to the second process module; and
an expected time to transfer a wafer from the second process module to the wafer handling chamber.

### Claim 13 (depends on 2)

The method of claim 2, wherein the semiconductor processing tool includes a load lock in communication with the wafer handling chamber, and a load port in communication with the load lock, and wherein analyzing the plurality of expected times includes analyzing an expected time for one or more of:
an expected time to transfer a wafer form the load port to the load lock;
an expected time to transfer a wafer from the load lock to the wafer handling chamber;
an expected time to transfer a wafer from the wafer handling chamber to the load lock; and
an expected time to transfer a wafer from the load lock to the load port.

### Claim 14 (depends on 13)

The method of claim 13, wherein analyzing the plurality of expected times includes determining whether the load lock is idle.

### Claim 15 (depends on 13)

The method of claim 13, wherein analyzing the plurality of expected times includes determining whether the wafer handling chamber is idle.

### Claim 16 (depends on 2)

The method of claim 2, wherein analyzing the plurality of expected times includes determining whether one or more of the first process module and the second process module is idle.

### Claim 17 (depends on 2)

The method of claim 2, wherein analyzing the plurality of expected times includes comparing a first process recipe and a second process recipe to be performed sequentially.

### Claim 18 (depends on 2)

The method of claim 2, wherein analyzing the plurality of expected times includes identifying an expected time to purge gas from one or more of the first process chamber and the second process chamber.

### Claim 19 (depends on 2)

The method of claim 2, wherein analyzing the plurality of expected times includes identifying an expected time to increase or decrease a temperature of at least a portion of one or more of the first process chamber and the second process chamber.

### Claim 20 (depends on 2)

The method of claim 2, wherein the computer program includes a semaphore that, regardless of the wafer processing plan, prevents the semiconductor processing tool from attempting to perform a first action until a second action is completed, wherein the first action and the second action cannot be performed simultaneously.

### Claim 21

A system comprising:
a semiconductor processing tool including a first process module and a second process module; and
a computer system comprising:
a processor; and
a memory coupled to the processor and storing instructions that, in response to execution by the processor, cause the processor to perform operations comprising:
analyzing a plurality of expected times to complete each of a respective plurality of actions to be performed by the semiconductor processing tool comprising an expected time to transfer a first wafer from a wafer handling chamber to a first process module, an expected time to transfer the first wafer from the first process module to the wafer handling chamber, an expected time to transfer a second wafer from the wafer handling chamber to a second process module, and an expected time to transfer the second wafer from the second process module to the wafer handling chamber, the semiconductor processing tool including the first process module and the second process module; and
automatically generating a wafer processing plan based on the analysis, wherein the wafer processing plan, when executed by the processing tool, is configured to cause the semiconductor processing tool to:
load the first wafer into the first process module;
load the second wafer into the second process module;
unload the first wafer from the first process module after loading the second wafer into the second process module;
load a third wafer into the first process module after unloading the first wafer from the first process module; and
unload the second wafer from the second process module after loading the third wafer into the first process module;
wherein the semiconductor processing tool includes the wafer handling chamber in communication with the first process module and the second process module, and
wherein the wafer computer program measures an actual time to complete the steps of load the first wafer, load the second wafer, unload the first wafer, load the third wafer, and unload the second wafer, and automatically adjusts future wafer processing plans based on actual time to complete load the first wafer, load the second wafer, unload the first wafer, load the third wafer, and unload the second wafer.

### Claim 22 (depends on 21)

The system of claim 21, wherein at least one of the plurality of expected times is an estimation of the time required to complete an action.

### Claim 23 (depends on 21)

The system of claim 21, wherein at least one of the plurality of expected times is a measured time for the time required to complete an action.

### Claim 24 (depends on 21)

The system of claim 21, wherein the plurality of expected times includes a first expected time required to perform an action from the plurality of actions, and wherein the memory further stores instructions to cause the processor to perform operations comprising:
measuring an actual time for the semiconductor processing tool to perform the action; and
comparing the actual time to the first expected time;
wherein the step of the wafer computer program automatically adjusts future wafer processing plans comprises replacing the first expected time with the measured time in the plurality of expected times for subsequent wafer process plans in response to the difference between the measured time and the first expected time exceeding a predetermined amount.

### Claim 25 (depends on 21)

The system of claim 21, wherein the plurality of expected times includes a first expected time required to complete an action from the plurality of actions, and wherein the memory further stores instructions to cause the processor to perform operations comprising:
measuring an actual time for the semiconductor processing tool to perform the action;
comparing the actual time to the first expected time; and
generating an alert, via a user interface coupled to the computer system, in response to the difference between the measured time and the first expected time exceeding a predetermined amount.

### Claim 26 (depends on 25)

The system of claim 25, wherein the alert identifies a component of the semiconductor processing tool that may be malfunctioning to cause the difference between the measured time and the first expected time.

### Claim 27 (depends on 21)

The system of claim 21, wherein the memory further stores instructions to cause the processor to perform operations comprising:
generating a first wafer processing plan based on first plurality of expected times for a respective plurality of actions;
measuring actual times for a semiconductor processing tool to perform the plurality of actions in the first wafer processing plan;
generating a second plurality of times by modifying at least one time from the first plurality of expected times based on the measured times for the first wafer processing plan; and
generating a second wafer processing plan based on the second plurality of times.

### Claim 28 (depends on 27)

The system of claim 27, wherein the memory further stores instructions to cause the processor to perform operations comprising:
measuring actual times for the semiconductor processing tool to perform the plurality of actions in the second wafer processing plan;
generating a third plurality of times by modifying at least one time from the second plurality of expected times based on the measured times for the second wafer processing plan; and
generating a third wafer processing plan based on the third plurality of times.

### Claim 29 (depends on 21)

The system of claim 21, wherein the wafer handling chamber comprises a robot for transferring wafers to and from the first process module and the second process module, wherein analyzing the plurality of expected times includes identifying a first expected time when the robot is in a first position, and identifying a second expected time when the robot is in a second position, the first expected time being shorter than the second expected time.

### Claim 30 (depends on 21)

The system of claim 21, wherein analyzing the plurality of expected times includes analyzing a sum of expected times associated with processing a wafer in one or more of the first process module and the second process module.

### Claim 31 (depends on 21)

The system of claim 21, wherein analyzing the plurality of expected times includes analyzing an expected time for one or more of:
an expected time to transfer a wafer from the wafer handling chamber to the first process module;
an expected time to transfer a wafer from the first process module to the wafer handling chamber;
an expected time to transfer a wafer form the wafer handling chamber to the second process module; and
an expected time to transfer a wafer from the second process module to the wafer handling chamber.

### Claim 32 (depends on 21)

The system of claim 21, wherein the semiconductor processing tool includes a load lock in communication with the wafer handling chamber, and a load port in communication with the load lock, and wherein analyzing the plurality of expected times includes analyzing an expected time for one or more of:
an expected time to transfer a wafer from the load port to the load lock;
an expected time to transfer a wafer from the load lock to the wafer handling chamber;
an expected time to transfer a wafer from the wafer handling chamber to the load lock; and
an expected time to transfer a wafer form the load lock to the load port.

### Claim 33 (depends on 32)

The system of claim 32, wherein analyzing the plurality of expected times includes determining whether the load lock is idle.

### Claim 34 (depends on 32)

The system of claim 32, wherein analyzing the plurality of expected times includes determining whether the wafer handling chamber is idle.

### Claim 35 (depends on 21)

The system of claim 21, wherein analyzing the plurality of expected times includes determining whether one or more of the first process module and the second process module is idle.

### Claim 36 (depends on 21)

The system of claim 21, wherein analyzing the plurality of expected times includes comparing a first process recipe and a second process recipe to performed sequentially.

### Claim 37 (depends on 21)

The system of claim 21, wherein analyzing the plurality of expected times includes identifying an expected time to purge gas from one or more of the first process chamber and the second process chamber.

### Claim 38 (depends on 21)

The system of claim 21, wherein analyzing the plurality of expected times includes identifying an expected time to increase or decrease a temperature of at least a portion of one or more of the first process chamber and the second process chamber.