# US 2017/0256005 A1 · Device for scouting a construction site for construction device deployment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0256005 A1
- Document ID: US20170256005A1
- Status: Published application
- Kind: A1
- Application number: 15/446,056
- Filed: 2017-03-01
- Published: 2017-09-07
- Earliest claimed: 2016-03-02
- Assignees: Husqvarna AB
- Applicants: Husqvarna AB
- Inventors: Tommy Olsson
- Web page: https://patentgrep.com/patent/US20170256005A1

## CPC

- G06Q 50/08: Construction
- G06Q 10/063114: {Status monitoring or status determination for a person or group}
- E02F 9/261: {Surveying the work-site to be treated}
- G06Q 50/165: {Land development}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

A construction site status monitoring device is provided including processing circuitry configured to receive sensor data associated with a construction site from a scout device and generate a site map based on the sensor data for deployment of the construction device.

## Claims

### Claim 1

A construction site status monitoring device comprising processing circuitry configured to:
receive sensor data associated with a construction site from a scout device; and
generate a site map based on the sensor data, the site map supporting deployment of a construction device.

### Claim 2 (depends on 1)

The construction site status monitoring device of claim 1, wherein the processing circuitry is further configured to:
cause a working element of the construction device to be deployed based on the site map.

### Claim 3 (depends on 1)

The construction site status monitoring device of claim 1, wherein the processing circuitry is further configured to:
cause the scout device to collect the sensor data associated with the construction site.

### Claim 4 (depends on 1)

The construction site status monitoring device of claim 1, wherein the processing circuitry is further configured to:
receive a site plan;
compare the site plan to the site map;
identify deviations from the site plan based on the comparison of the site plan to the site map; and
cause the working element of the construction device to be deployed based on the site map and the deviations from the site plan.

### Claim 5 (depends on 1)

The construction site status monitoring device of claim 1, wherein the processing circuitry is further configured to;
determine a job type and location based on the site map.

### Claim 6 (depends on 1)

The construction site status monitoring device of claim 1, wherein the processing circuitry is further configured to:
determine a work route based on the site map.

### Claim 7 (depends on 6)

The construction site status monitoring device of claim 6, wherein the processing circuitry is further configured to:
cause the work route to be displayed on a graphic user interface.

### Claim 8 (depends on 6)

The construction site status monitoring device of claim 6, wherein the processing circuitry is further configured to:
cause a working element of the construction device to be deployed based on the work route.

### Claim 9 (depends on 1)

The construction site status monitoring device of claim 1, wherein the sensor data is indicative of the orientation or topography of a floor of the construction site.

### Claim 10 (depends on 1)

The construction site status monitoring device of claim 1, wherein the processing circuitry is further configured to:
cause the site map to be displayed on a graphic user interface.

### Claim 11 (depends on 1)

The construction site status monitoring device of claim 1, wherein the construction device is a floor grinder.

### Claim 12

A construction site status monitoring system comprising:
a scout device comprising a sensor;
a construction device; and
a construction site status monitoring device comprising processing circuitry configured to:
receive sensor data associated with a construction site from the scout device; and
generate a site map based on the sensor data, the site map supporting deployment of the construction device.

### Claim 13 (depends on 12)

The construction site status monitoring device of claim 12, wherein the processing circuitry is further configured to:
cause a working element of the construction device to be deployed based on the site map.

### Claim 14 (depends on 12)

The construction site status monitoring system of claim 12, wherein the processing circuitry is further configured to:
cause the scout device to collect the sensor data associated with the construction site.

### Claim 15 (depends on 12)

The construction site status monitoring system of claim 12, wherein the processing circuitry is further configured to:
receive a site plan;
compare the site plan to the site map,
identify deviations from the site plan based on the comparison of the site plan to the site map, and
cause the working element of the construction device to be deployed based on the site map and the deviations from the site plan.

### Claim 16 (depends on 12)

The construction site status monitoring system of claim 12, wherein the processing circuitry is further configured to;
determine a job type and location based on the site map.

### Claim 17 (depends on 12)

The construction site status monitoring system of claim 12, wherein the processing circuitry is further configured to:
determine a work route based on the site map.

### Claim 18 (depends on 17)

The construction site status monitoring system of claim 17, wherein the processing circuitry is further configured to:
cause the work route to be displayed on a graphic user interface.

### Claim 19 (depends on 17)

The construction site status monitoring system of claim 17, wherein processing circuitry is further configured to:
cause a working element of the construction device to be deployed based on the work route.

### Claim 20 (depends on 12)

The construction site status monitoring system of claim 12, wherein the sensor data is indicative of the orientation or topography of a floor of the construction site.