# US 2017/0255913 A1 · System for distributing electrical energy

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0255913 A1
- Document ID: US20170255913A1
- Status: Published application
- Kind: A1
- Application number: 15/501,081
- Filed: 2015-07-21
- Published: 2017-09-07
- Earliest claimed: 2014-08-01
- Assignees: Citytec B.V.
- Applicants: Citytec B.V.
- Inventors: Henricus David STOKMAN
- Web page: https://patentgrep.com/patent/US20170255913A1

## CPC

- H02J 13/36: specially adapted for protection systems
- C23F 13/04: Controlling or regulating desired parameters
- G01R 22/063: {related to remote communication}
- G01R 31/52: Testing for short-circuits, leakage current or ground faults
- G01R 35/005: {Calibrating; Standards or reference devices, e.g. voltage or resistance standards, "golden" references (G01R33/0035, G01R35/002 take precedence)}
- G06Q 20/145: {Payments according to the detected use or quantity}
- G06Q 50/06: Energy or water supply
- H02H 3/087: for DC applications
- H02H 3/52: responsive to the appearance of harmonics
- H02H 7/268: {for DC systems}
- H02J 1/02: Arrangements for reducing harmonics or ripples
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/1321: {using a wired telecommunication network or a data transmission bus}
- C23F 2213/11: for structures subject to stray currents
- G01D 2204/12: Determination or prediction of behaviour, e.g. likely power consumption or unusual usage patterns
- G01D 2204/22: Arrangements for detecting or reporting faults, outages or leaks
- H02J 1/102: being switching converters (H02J1/108, H02J1/12 take precedence)
- H02J 4/00: Circuit arrangements for mains or distribution networks not specified as AC or DC; Circuit arrangements for mains or distribution networks combining AC and DC sections or sub-networks (arrangements using intermediate DC-AC-DC conversion H02J1/002; arrangements using high-voltage DC [HVDC] links H02J3/36)
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 20/30: Smart metering, e.g. specially adapted for remote reading
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- C23F: NON-MECHANICAL REMOVAL OF METALLIC MATERIAL FROM SURFACE (working metal by laser beams B23K26/00; desurfacing by applying flames B23K7/00; working of metal by electro-erosion B23H; producing decorative effects by removing surface material, e.g. by engraving, by etching, B44C1/22; electrolytic etching or polishing C25F); INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL; MULTI-STEP PROCESSES FOR SURFACE TREATMENT OF METALLIC MATERIAL INVOLVING AT LEAST ONE PROCESS PROVIDED FOR IN CLASS C23 AND AT LEAST ONE PROCESS COVERED BY SUBCLASS C21D OR C22F OR CLASS C25
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- G01D: MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The present invention relates to a system for distributing electrical energy, comprising an electricity grid configured to supply electrical energy to end users, characterized in that the grid is operated on a direct voltage.

## Claims

### Claim 1

A device for billing energy consumption within a system for distributing electrical energy, the system comprising:
an electricty grid configured to supply electrical energy to end users, characterized in that the grid is operated on a direct voltage; the device comprising:
a connection for consumption of electrical energy from an electricity grid;
a connection for supplying electrical energy to a consumer connection;
a connection for data communication with an administrator of the electricity grid;
a metering device connected to the connection for consumption and to the connection for data communication and configured to:
monitor the amount of electrical energy consumed at the consumption point; and
monitor the moment the electrical energy is consumed;
a data processing unit connected to the metering device and to the connection for data communication and configured to
determine, via the connection for data communication, the electric power available for consumption at the connection;
determine, via the connection to the metering device, the power consumed; and
make available to an output for data output the amount of the electric power available for consumption at the connection.

### Claim 2 (depends on 1)

The device as claimed in claim 1, coupled to a control member which is configured to:
set a target value for the consumed electrical energy,
consume the target value of electrical energy,
supply electrical energy to an energy buffer coupled to the control member when the electrical energy actually consumed by users connected to the control member is less than the target value; and
draw electrical energy from the energy buffer coupled to the control member when the electrical energy actually consumed by users connected to the control member is greater than the target value.

### Claim 3 (depends on 1)

The device as claimed in claim 1, wherein a measuring device is arranged in series with a first pole of the connection for delivering electrical energy to a consumer connection for the purpose of measuring a current level, and wherein a controller is provided for the purpose of breaking, on the basis of the measured signal, the connection between the connection for consumption of electrical energy from an electricity grid and the connection for delivering electrical energy to a consumer connection, and wherein a coil is arranged in series with a second pole for the purpose of preventing rapid fluctuations in the current level.

### Claim 4 (depends on 3)

The device as claimed in claim 3, wherein, when the connection between the connection for consumption of electrical energy from an electricity grid and the connection for delivering electrical energy to a consumer connection is broken, the controller connects the connection for delivering electrical energy to a consumer connection to a power supply.

### Claim 5

A system for distributing electrical energy, comprising:
an electricity grid configured to supply electrical energy to end users, characterized in that
the grid is operated on a direct voltage.

### Claim 6 (depends on 5)

The system as claimed in claim 5 further comprising a protection device configured to detect change in a power consumption at the connection of an end user and to limit the power consumption at the connection of the end user if the change is greater than a predetermined threshold value.

### Claim 7 (depends on 6)

The system as claimed in claim 6, wherein the protection device is configured to detect a change on the basis of the measured presence of harmonic current or voltage components.

### Claim 8 (depends on 6)

The system as claimed in claim 6, wherein the protection device is configured to detect the power consumption and to limit or shut off the connection of the end user if the power consumption is greater than a predetermined threshold value.

### Claim 9 (depends on 5)

The system as claimed in claim 5 further comprising a device for preventing corrosion of metal reinforcing parts in buildings in the vicinity of a system, wherein said device comprises a measuring device for determining a current, in particular a leakage current, through a metal reinforcing part and a device for injecting a current into the system, wherein a control device is provided for injecting the current such that the current through the metal reinforcing part becomes zero.

### Claim 10 (depends on 5)

The system as claimed in claim 5, comprising a method for calibrating a leakage current detection device for use in the system, wherein said method comprises the steps of:
injecting a known test current during operation;
measuring the response;
designating the response not correlated to the test current as leakage current;
designating a subsequently measured current which differs from the leakage current as faulty; and
repeating the foregoing steps at a predetermined interval.

### Claim 11

A method for determining the sequence of electrical elements in a ladder network, wherein the electrical elements are provided with a measuring device for measuring the voltage with which they are supplied and a communication device for communicating via their power connection at least the measured voltage and a unique code to a control device, and which are configured to receive via the communication device power-on or power-off instructions, comprising the steps of:
supplying a reference voltage to each of the electrical elements prior to their being placed in the ladder;
placing the electrical elements in the ladder network;
detecting the unique codes of the electrical elements present with the control device;
switching the electrical elements on and off one by one and receiving the voltage measured by the electrical elements with the control device; and
determining the sequence in which the electrical elements are present in the ladder on the basis of the general principle that the higher the voltage measured, the closer to the voltage source.

### Claim 12 (depends on 5)

The system of claim 5, further comprising a user connection, wherein said user connection is provided with USB connections for electrical apparatuses, and wherein said USB connections are configured for power and data transfer.