# US 2017/0255903 A1 · Determining delivery dates for multiple product types

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0255903 A1
- Document ID: US20170255903A1
- Status: Published application
- Kind: A1
- Application number: 15/060,913
- Filed: 2016-03-04
- Published: 2017-09-07
- Earliest claimed: 2016-03-04
- Assignees: Dell Software Inc.
- Applicants: Dell Software, Inc.
- Inventors: Amer J. Chowdhry; Aravind Rajagopal Kotikanyadanam; Anuj Kumar Gupta; K V Sai Prasad; SivaKumar Sambandam
- Web page: https://patentgrep.com/patent/US20170255903A1

## CPC

- G06Q 10/0833: Tracking
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Systems and techniques to determine, substantially in real time, an estimated ship date or an estimated delivery date associated with a product are described. A commitment engine may receive, from a computing device, data associated with a product that comprises a built-to-order product. The commitment engine may determine whether the product is eligible for one of direct shipment, international parcel direct, or hard merge shipment. The commitment engine may determine a shipping method for the product, determine the estimated ship date, the estimated delivery date or both, and send a message to the computing device information identifying at least one of the estimated ship date or the estimated delivery date.

## Claims

### Claim 1

A computer-implemented method, comprising:
receiving, from a first customer computing device, first data associated with a first product;
determining, based at least in part on the first data, that the first product comprises a built-to-order product;
determining, based at least in part on the first data, a shipment type of the first product, the shipment type comprising one of:
a direct shipment comprising shipment from an original design manufacturer to a carrier hub and from the carrier hub to a delivery location;
an international parcel direct comprising shipment from the original design manufacturer directly to the delivery location; or
a hard merge shipment comprising shipment from the original design manufacturer to a regional fulfillment center and from the regional fulfillment center to the delivery location;
determining a first shipping method based at least in part on the first data and the shipment type;
determining, based at least in part on the first shipping method and weather data, at least one of a first estimated ship date or a first estimated delivery date;
sending, to the first customer computing device, a first message that includes at least one of the first estimated ship date or the first estimated delivery date.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein:
determining the first estimated ship date includes determining a manufacturing time to manufacture the first product at a manufacturing facility; and
determining the first estimated delivery date includes determining a shuttle time to transport the first product from the manufacturing facility to a fulfillment center.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, wherein determining, based at least in part on the first data, that the first product is to undergo special handling comprises:
determining that a sum of a height, a width, and a depth of the first product satisfies a pre-determined total dimensions threshold.

### Claim 4 (depends on 2)

The computer-implemented method of claim 2, wherein determining, based at least in part on the first data, that the first product is to undergo special handling comprises:
determining that at least one of a height, a width, or a depth of the first product satisfies a pre-determined single dimension threshold.

### Claim 5 (depends on 2)

The computer-implemented method of claim 2, wherein determining, based at least in part on the first data, that the first product is to undergo special handling comprises:
determining that a weight of the first product satisfies a pre-determined weight threshold.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, further comprising:
receiving, from a second customer computing device, second data associated with a second product;
determining, based at least in part on the second data, that the second product comprises a built-to-stock product;
determining a second delivery location included in the second data;
determining a nearest fulfillment center to the second delivery location;
determining a second shipping method based at least in part on the second data;
determining, based at least in part on the second shipping method, at least one of a second estimated ship date or a second estimated delivery date;
sending, to the second customer computing device, a second message that includes at least one of the second estimated ship date or the second estimated delivery date.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, further comprising:
determining a logistics lead time associated with the first product;
determining a manufacturing lead time associated with the first product;
determining a payment lead time associated with the first product;
determining regional holidays associated with a region in which the original design manufacturer is located; and
determining planned events associated with the original design manufacturer.

### Claim 8

One or more non-transitory computer-readable media storing instructions executable by one or more processors to perform operations comprising:
receiving, from a customer computing device, data associated with a product;
determining, based at least in part on the data, that the product comprises a built-to-order product;
determining, based at least in part on the first data, a shipment type of the product, the shipment type comprising one of:
a direct shipment comprising shipment from an original design manufacturer to a carrier hub and from the carrier hub to a delivery location;
an international parcel direct comprising shipment from the original design manufacturer directly to the delivery location; or
a hard merge shipment comprising shipment from the original design manufacturer to a regional fulfillment center and from the regional fulfillment center to the delivery location;
determining a shipping method based at least in part on the data and the shipment type;
determining, based at least in part on the shipping method and predicted weather data, at least one of an estimated ship date or an estimated delivery date;
sending, to the customer computing device, a message that includes at least one of the estimated ship date or the estimated delivery date.

### Claim 9 (depends on 8)

The one or more non-transitory computer-readable media of claim 8, the operations further comprising:
determining a logistics lead time associated with the product.

### Claim 10 (depends on 8)

The one or more non-transitory computer-readable media of claim 8, the operations further comprising:
determining a manufacturing lead time associated with the product including determining a manufacturing time to manufacture the product at a manufacturing facility and a shuttle time to shuttle the product from the manufacturing facility to a fulfillment center.

### Claim 11 (depends on 8)

The one or more non-transitory computer-readable media of claim 8, the operations further comprising:
determining a payment lead time associated with the product.

### Claim 12 (depends on 8)

The one or more non-transitory computer-readable media of claim 8, the operations further comprising:
determining regional holidays associated with a region in which the original design manufacturer is located.

### Claim 13 (depends on 8)

The one or more non-transitory computer-readable media of claim 8, the operations further comprising:
determining planned events associated with the original design manufacturer.

### Claim 14

A server, comprising:
one or more processors; and
one or more non-transitory computer-readable media storing instructions that are executable by the one or more processors to perform operations comprising:
receiving, from a first customer computing device, first data associated with a first product;
determining, based at least in part on the first data, that the first product comprises a built-to-order product;
determining, based at least in part on the first data, a shipment type of the first product, the shipment type comprising one of:
a direct shipment comprising shipment from an original design manufacturer to a carrier hub and from the carrier hub to a delivery location;
an international parcel direct comprising shipment from the original design manufacturer directly to the delivery location; or
a hard merge shipment comprising shipment from the original design manufacturer to a regional fulfillment center and from the regional fulfillment center to the delivery location;
determining a first shipping method based at least in part on the first data, weather data, and the shipment type;
determining, based at least in part on the first shipping method, at least one of a first estimated ship date or a first estimated delivery date;
sending, to the first customer computing device, a first message that includes at least one of the first estimated ship date or the first estimated delivery date.

### Claim 15 (depends on 14)

The server of claim 14, the operations further comprising:
determining that the first product is to undergo special handling based on at least one of:
determining that a sum of a height, a width, and a depth of the first product satisfies a pre-determined total dimensions threshold;
determining that at least one of the height, the width, or the depth of the first product satisfies a pre-determined single dimension threshold; or
determining that a weight of the first product satisfies a pre-determined weight threshold.

### Claim 16 (depends on 14)

The server of claim 14, the operations further comprising:
receiving, from a second customer computing device, second data associated with a second product;
determining, based at least in part on the second data, that the second product comprises a built-to-stock product;
determining a second delivery location included in the second data;
determining a nearest fulfillment center to the second delivery location;
determining a second shipping method based at least in part on the second data;
determining, based at least in part on the second shipping method, at least one of a second estimated ship date or a second estimated delivery date;
sending, to the second customer computing device, a second message that includes at least one of the second estimated ship date or the second estimated delivery date.

### Claim 17 (depends on 14)

The server of claim 14, wherein the second message is sent less than thirty seconds after receiving the second data from the second customer computing device.

### Claim 18 (depends on 14)

The server of claim 14, the operations further comprising:
determining a logistics lead time associated with the first product;
determining a manufacturing lead time associated with the first product including determining a manufacturing time to manufacture the first product at a manufacturing facility and a shuttle time to shuttle the first product from the manufacturing facility to a fulfillment center;
determining a payment lead time associated with the first product;
determining regional holidays associated with a region in which the original design manufacturer is located; and
determining planned events associated with the original design manufacturer.

### Claim 19 (depends on 14)

The server of claim 14, the operations further comprising:
receiving notification of an unplanned event comprising a weather alert; and
automatically associating, based at least in part on the unplanned event, an unplanned events adder with the first product; and
determining a revised estimated ship date or a revised estimated delivery date associated with the first product based at least in part on the unplanned events adder.

### Claim 20 (depends on 14)

The server of claim 14, the operations further comprising:
receiving an indication that the first product is to be discontinued; and
selling safety stock of the first product.
