# US 2017/0254687 A1 · Flowmeter profiling system for use in groundwater production wells and boreholes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0254687 A1
- Document ID: US20170254687A1
- Status: Published application
- Kind: A1
- Application number: 15/445,896
- Filed: 2017-02-28
- Published: 2017-09-07
- Earliest claimed: 2016-03-01
- Assignees: BESST, Inc.
- Applicants: BESST, Inc.
- Inventors: Noah R. Heller
- Web page: https://patentgrep.com/patent/US20170254687A1

## CPC

- G01F 1/7086: using optical detecting arrangements
- E21B 47/11: using tracers; using radioactivity
- G01V 9/02: Determining existence or flow of underground water
- G01F: MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

A flowmeter profiling system for measuring a flow profile of water in a subsurface environment includes a tracer injection system positioned at least partially within the subsurface environment. The tracer injection system includes an injection tube that contains a tracer material, and an injection port that is coupled to the injection tube near a bottom of the injection tube. Additionally, the injection port is configured to inject the tracer material substantially horizontally into the subsurface environment. The injection port can include a plurality of exit holes such that the tracer material is injected substantially horizontally into the subsurface environment through each of the plurality of exit holes. The water can be in a groundwater production well having a cross-sectional plane, and the tracer material can be injected substantially horizontally into the groundwater production well through each of the plurality of exit holes to fill substantially the entire cross-sectional plane of the groundwater production well.

## Claims

### Claim 1

A flowmeter profiling system for measuring a flow profile of water in a subsurface environment, the flowmeter profiling system comprising:
a tracer injection system positioned at least partially within the subsurface environment, the tracer injection system including an injection tube that contains a tracer material, and an injection port that is coupled to the injection tube near a bottom of the injection tube, the injection port being configured to inject the tracer material substantially horizontally into the subsurface environment.

### Claim 2 (depends on 1)

The flowmeter profiling system of claim 1 wherein the injection port includes a plurality of exit holes, and wherein the tracer material is injected substantially horizontally into the subsurface environment through each of the plurality of exit holes.

### Claim 3 (depends on 2)

The flowmeter profiling system of claim 2 wherein the water is in a groundwater production well having a cross-sectional plane, and wherein the tracer material is injected substantially horizontally into the groundwater production well through each of the plurality of exit holes to fill substantially the entire cross-sectional plane of the groundwater production well.

### Claim 4 (depends on 3)

The flowmeter profiling system of claim 3 wherein the groundwater production well includes a support casing and a well screen that are positioned within the subsurface environment; wherein the flowmeter profiling system further comprises a primary pump that is positioned within the groundwater production well, the primary pump defining at least a portion of an annulus between the primary pump and one of the support casing and the well screen; and wherein the injection tube is positioned within the groundwater production well and below the primary pump via the annulus, and without removing the primary pump from the groundwater production well.

### Claim 5 (depends on 3)

The flowmeter profiling system of claim 3 wherein the groundwater production well includes a support casing and a well screen that are positioned within the subsurface environment; wherein the flowmeter profiling system further comprises a primary pump that is positioned within the groundwater production well; and wherein the injection tube is positioned within the groundwater production well and below the primary pump via an access pipe that is positioned between the primary pump and one of the support casing and the well screen.

### Claim 6 (depends on 2)

The flowmeter profiling system of claim 2 wherein the tracer injection system is a single-depth tracer injection system that is configured such that each of the plurality of exit holes is positioned at a first depth within the subsurface environment, and wherein the tracer material is injected into the subsurface environment through each of the plurality of exit holes at the first depth.

### Claim 7 (depends on 6)

The flowmeter profiling system of claim 6 wherein the single-depth tracer injection system can be used consecutively at multiple depth locations within the subsurface environment to measure the flow profile of the water at various depths throughout the subsurface environment without removing the single-depth tracer injection system from the subsurface environment.

### Claim 8 (depends on 2)

The flowmeter profiling system of claim 2 wherein the tracer injection system further includes a tracer detector that is positioned at a surface above the subsurface environment; and wherein the tracer detector detects the presence of the tracer material within the water to measure the flow profile of the water within the subsurface environment.

### Claim 9 (depends on 2)

The flowmeter profiling system of claim 2 wherein the tracer injection system further includes a tracer detector that is coupled to the injection tube within the subsurface environment; and wherein the tracer detector detects the presence of the tracer material within the water to measure the flow profile of the water within the subsurface environment.

### Claim 10 (depends on 1)

The flowmeter profiling system of claim 1 wherein the tracer injection system is a multi-depth tracer injection system that further includes a second injection port that is coupled to the injection tube, the second injection port being spaced apart from the injection port along a length of the injection tube; wherein the injection port is configured to inject the tracer material substantially horizontally into the subsurface environment at a first depth; and wherein the second injection port is configured to inject the tracer material substantially horizontally into the subsurface environment at a second depth that is different than the first depth.

### Claim 11 (depends on 10)

The flowmeter profiling system of claim 10 wherein the tracer injection system further includes a tracer detector that is positioned at a surface above the subsurface environment; and wherein the tracer detector detects the presence of the tracer material within the water to measure the flow profile of the water within the subsurface environment at each of the first depth and the second depth.

### Claim 12 (depends on 10)

The flowmeter profiling system of claim 10 wherein the tracer injection system further includes a tracer detector that is coupled to the injection tube within the subsurface environment; and wherein the tracer detector detects the presence of the tracer material within the water to measure the flow profile of the water within the subsurface environment at each of the first depth and the second depth.

### Claim 13

The flowmeter profiling system 1 wherein the tracer injection system is a multi-depth tracer injection system that further includes a second injection tube that contains the tracer material, and a second injection port that is coupled to the second injection tube near a bottom of the second injection tube, the second injection port being configured to inject the tracer material substantially horizontally into the subsurface environment; wherein the injection port is configured to inject the tracer material substantially horizontally into the subsurface environment at a first depth; and wherein the second injection port is configured to inject the tracer material substantially horizontally into the subsurface environment at a second depth that is different than the first depth.

### Claim 14 (depends on 13)

The flowmeter profiling system of claim 13 wherein the injection tube and the second injection tube are conjoined together within a single jacket.

### Claim 15 (depends on 13)

The flowmeter profiling system of claim 13 wherein the tracer injection system further includes a tracer detector that is positioned at a surface above the subsurface environment; and wherein the tracer detector detects the presence of the tracer material within the water to measure the flow profile of the water within the subsurface environment at each of the first depth and the second depth.

### Claim 16 (depends on 10)

The flowmeter profiling system of claim 10 wherein the tracer injection system further includes a tracer detector that is coupled to one of the injection tube and the second injection tube within the subsurface environment; and wherein the tracer detector detects the presence of the tracer material within the water to measure the flow profile of the water within the subsurface environment at each of the first depth and the second depth.

### Claim 17 (depends on 1)

The flowmeter profiling system of claim 1 further comprising a primary pump that is positioned within the subsurface environment; wherein the tracer injection system includes the injection tube being positioned within the subsurface environment such that the injection port is positioned below the primary pump; and wherein the primary pump is turned on to pump the water within the subsurface environment such that the flowmeter profiling system measures a dynamic flow profile of the water in the subsurface environment.

### Claim 18 (depends on 1)

The flowmeter profiling system of claim 1 wherein the tracer material has a specific gravity that is approximately equal to a specific gravity of the water within the subsurface environment.

### Claim 19 (depends on 1)

The flowmeter profiling system of claim 1 wherein a rate at which the tracer material becomes diluted and asymptotically approaches a specific gravity of the water within the subsurface environment is substantially instantaneous.

### Claim 20 (depends on 1)

A water sampling assembly for use within a subsurface environment, the water sampling assembly including a water sampler that samples water within the subsurface environment, and the flowmeter profiling system of claim 1 that measures a flow profile of the water in the subsurface environment.

### Claim 21

A method for measuring a flow profile of water in a subsurface environment, the method comprising the steps of:
positioning a tracer injection system at least partially within the subsurface environment, the tracer injection system including an injection tube that contains a tracer material, and an injection port that is coupled to the injection tube near a bottom of the injection tube; and
injecting the tracer material substantially horizontally into the subsurface environment with the injection port.

### Claim 22 (depends on 21)

The method of claim 21 wherein the step of positioning includes the injection port having a plurality of exit holes; and wherein the step of injecting includes injecting the tracer material substantially horizontally into the subsurface environment through each of the plurality of exit holes with the injection port.

### Claim 23 (depends on 22)

The method of claim 22 wherein the water is in a groundwater production well having a cross-sectional plane; and wherein the step of injecting includes injecting the tracer material substantially horizontally into the groundwater production well through each of the plurality of exit holes with the injection port to fill substantially the entire cross-sectional plane of the groundwater production well.

### Claim 24 (depends on 21)

The method of claim 21 further comprising the step of detecting the presence of the tracer material within the water with a tracer detector to measure the flow profile of the water within the subsurface environment, the tracer detector being positioned at a surface above the subsurface environment.

### Claim 25 (depends on 21)

The method of claim 21 further comprising the step of detecting the presence of the tracer material within the water with a tracer detector to measure the flow profile of the water within the subsurface environment, the tracer detector being coupled to the injection tube within the subsurface environment.

### Claim 26 (depends on 21)

The method of claim 21 further comprising the steps of positioning a primary pump within the subsurface environment; positioning the injection tube within the subsurface environment such that the injection port is positioned below the primary pump; and turned on the primary pump to pump the water within the subsurface environment such that the flowmeter profiling system measures a dynamic flow profile of the water in the subsurface environment.

### Claim 27 (depends on 21)

The method of claim 21 wherein the step of positioning includes the tracer material having a specific gravity that is approximately equal to a specific gravity of the water within the subsurface environment.

### Claim 28 (depends on 21)

The method of claim 21 wherein the step of positioning includes the tracer material becoming diluted and asymptotically approaching a specific gravity of the water within the subsurface environment substantially instantaneously.
