# US 2017/0254163 A1 · Gas tight shale shaker for enhanced drilling fluid recovery and drilled solids washing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0254163 A1
- Document ID: US20170254163A1
- Status: Published application
- Kind: A1
- Application number: 15/447,971
- Filed: 2017-03-02
- Published: 2017-09-07
- Earliest claimed: 2016-03-03
- Assignees: Recover Energy Services Inc.
- Applicants: Recover Energy Services Inc.
- Inventors: Stan ROSS; Wendell PALMER
- Web page: https://patentgrep.com/patent/US20170254163A1

## CPC

- E21B 21/065: {Separating solids from drilling fluids}
- B01D 33/0346: {with flat filtering elements}
- B01D 33/41: in series connection
- B01D 33/76: for discharging the filter cake, e.g. chutes
- B01D 33/80: Accessories
- E21B 21/01: Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)

## Abstract

A gas tight shale shaker for enhanced drilling fluid recovery and drilled solids washing. A process and apparatus for liquid phase-solid phase separation of oil base drilling mud-containing drill cuttings is described including flowing the drilling mud-containing drill cuttings over a vibrating screen bed to cause a least a portion of the drilling mud to pass through the screen bed and the drill cuttings to remain on the screen bed. A diluent is added to the oil base drilling mud containing drill cuttings prior to flowing the drilling mud containing drill cutting over the screen bed. The entire process is performed in a gas-tight environment preventing escape of diluent from the process into the external atmosphere and preventing introduction of gases into the process from the external atmosphere.

## Claims

### Claim 1

A process for liquid phase-solid phase separation of oil base drilling mud-containing drill cuttings, comprising flowing the drilling mud-containing drill cuttings over a vibrating screen bed to cause a least a portion of the drilling mud to pass through the screen bed and the drill cuttings to remain above the screen bed, wherein at least one diluent is added to the oil base drilling mud containing drill cuttings to enhance fluids recovery, the entire process being performed in a gas-tight environment preventing escape of diluent from the process into the external atmosphere and preventing introduction of air containing oxygen into the process from the external atmosphere.

### Claim 2 (depends on 1)

The process of claim 1, wherein the at least one diluent is added to the unstabilized drill cuttings at a rate sufficient to achieve a yield point of the liquids phase of the drill cuttings feed equal to or less than 0.75 Pa, prior to the unstabilized drill cuttings contacting the vibrating screen bed.

### Claim 3 (depends on 1)

The process of claim 1, wherein a spray bar with at least one hole or nozzle is used to evenly deliver diluent or diluents onto the unstabilized drill cuttings after the unstabilized drill cuttings have come in contact with the vibrating screen bed, at a rate sufficient to achieve or maintain a yield point of the liquids phase of the drill cuttings feed, equal to or less than 0.75 Pa.

### Claim 4 (depends on 3)

The process of claim 3 wherein the vibrating screen bed further mixes the diluent and unstabilized drill cuttings.

### Claim 5 (depends on 1)

The process of claim 1 wherein the at least one diluent is added to the unstabilized drill cuttings at a rate sufficient to alter the plastic viscosity of the liquids phase of the drill cuttings feed to less than 5.0 cP, prior to the unstabilized drill cuttings contacting the vibrating screen bed.

### Claim 6 (depends on 1)

The process of claim 1, wherein a spray bar with at least on hole or nozzle is used to deliver the at least one diluent onto the unstabilized drill cuttings at a rate sufficient to alter the plastic viscosity of the liquids phase of the drill cuttings feed to less than 5.0 cP, after the unstabilized drill cuttings feed has come in contact with the vibrating screen bed.

### Claim 7 (depends on 1)

The process of claim 1 wherein the at least one diluent has a flashpoint less than or equal to 37° C.

### Claim 8 (depends on 1)

The process of claim 1 wherein the mixture of oil base drilling mud-containing drill cuttings and at least one diluent has a flashpoint less than or equal to 37° C.

### Claim 9 (depends on 1)

The process of claim 1 wherein the at least one diluent has a vapour pressure of at least 0.1 Torr and less than 750 Torr.

### Claim 10 (depends on 1)

The process of claim 1 wherein the diluent is hexane.

### Claim 11 (depends on 1)

The process of claim 1 wherein the diluent is n-butyl alcohol.

### Claim 12 (depends on 1)

The process of claim 1 wherein the diluent is ethyl acetate.

### Claim 13 (depends on 1)

The process of claim 1 wherein the environment within the gas tight process is maintained below the minimum oxygen content required for ignition of the diluent.

### Claim 14 (depends on 1)

The process of claim 1 wherein inert gas is introduced into the environment.

### Claim 15 (depends on 14)

The process of claim 14 wherein the inert gas comprises at least one of nitrogen, carbon dioxide, or fuel gas.

### Claim 16 (depends on 14)

The process of claim 14 wherein the inert gas exerts a positive pressure in the process.

### Claim 17

An oil base drilling mud-drill cuttings liquid phase-solid phase separation apparatus comprising, a receptacle for receiving oil base drilling mud-drill cuttings slurries, in fluid flow communication with a vibrating screen bed for separating drilling mud from drill cuttings, in fluid flow communication with conduits for conveying away separated drilling mud and drill cuttings, wherein the apparatus additionally contains flanges and seals permitting a hermetically sealed gas exchange with other gas tight processes, into and out of the apparatus.

### Claim 18 (depends on 17)

The apparatus of claim 17, in fluid flow communication with one or more of solvent wash apparatus, Verti-G dryers, decanters and solid dryers, through hermetically sealed conduits, bellows, hoses and/or conveyors.

### Claim 19 (depends on 17)

The apparatus of claim 17 wherein the separation apparatus additionally contains a receptacle inlet, an unstabilized drill cuttings storage device and/or feed hopper in fluid flow communication with the separation apparatus, including a hermetic seal between the unstabilized drill cuttings storage device and/or feed hopper, and the receptacle inlet.

### Claim 20 (depends on 17)

The apparatus of claim 17, wherein the hermetic sealing comprises at least one of a rotary air lock, positive displacement feed pump, solids trap, and/or fluids trap, preventing the ingress of air containing oxygen.