# US 2017/0254030 A1 · Screed assembly with automatic start-stop system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0254030 A1
- Document ID: US20170254030A1
- Status: Published application
- Kind: A1
- Application number: 15/447,574
- Filed: 2017-03-02
- Published: 2017-09-07
- Earliest claimed: 2016-03-02
- Assignees: Joseph Voegele AG
- Applicants: Joseph Voegele AG
- Inventors: Harald REUFELS
- Web page: https://patentgrep.com/patent/US20170254030A1

## CPC

- E01C 19/48: for laying-down the materials and consolidating them, or finishing the surface {, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ (E01C19/002, E01C23/065 take precedence; devices for guiding or controlling the machines along a predetermined path E01C19/004)}
- E01C 19/22: for consolidating or finishing laid-down unset materials ({E01C19/002, E01C19/48, E01C21/00} E01C23/02 {E01C23/065} take precedence; apparatus for generating vibrations in general B06B)
- E01C: CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR (forming roads or like surfaces by compacting or grading snow or ice E01H)

## Abstract

The disclosure relates to a screed assembly for use at a road finisher. This comprises a control unit, a first compacting device and a second compacting device, which is arranged in a first direction behind the first compacting device. The disclosure is characterized in that the control unit is configured to activate and/or deactivate the second compacting device in a delayed manner relative to the first compacting device by a time period, which is unequal to zero. The disclosure furthermore related to a method for operating a screed assembly for use at a road finisher. This comprises the following steps: activating and/or deactivating a first compacting device of the screed assembly, activating and/or deactivating a second compacting device of the screed assembly, which is arranged in direction of travel of the road finisher behind the first compacting device, after expiration of a predeterminable time period, which is unequal to zero.

## Claims

### Claim 1

A screed assembly for use at a road finisher, the screed assembly comprising:
a control unit;
a first compacting device; and
a second compacting device, which is arranged in a first direction behind the first compacting device;
wherein the control unit is configured to activate and/or deactivate the second compacting device in a delayed manner relative to the first compacting device by a time period, which is unequal to zero.

### Claim 2 (depends on 1)

The screed assembly according to claim 1 wherein the screed assembly comprises a first screed segment and a second screed segment, wherein the second screed segment is arranged in the first direction behind the first screed segment, and wherein the first screed segment comprises the first compacting device and the second screed segment comprises the second compacting device.

### Claim 3 (depends on 1)

The screed assembly according to claim 1 further comprising a sensor unit configured to detect an installation start and/or an installation end.

### Claim 4 (depends on 3)

The screed assembly according to claim 3 wherein the sensor unit comprises a temperature sensor, a pyrometer, an infrared sensor, an ultrasonic sensor and/or a path sensor.

### Claim 5 (depends on 1)

A road finisher comprising the screed assembly according to claim 1 and a tractor, which is configured to tow the screed assembly.

### Claim 6 (depends on 5)

The road finisher according to claim 5 wherein the first direction corresponds to a direction of travel of the road finisher.

### Claim 7 (depends on 5)

The road finisher according to claim 5 wherein the control unit is configured to calculate the time period based on a driving speed of the road finisher.

### Claim 8 (depends on 6)

The road finisher according to claim 6 wherein a distance in the direction of travel of the road finisher defined between the first and second compacting devices is provided, and the time period corresponds to a time required by the road finisher to cover a distance, the length of which corresponds to the distance between the first and second compacting devices, with a driving speed.

### Claim 9 (depends on 5)

The road finisher according to claim 5 wherein the control unit is provided at the tractor.

### Claim 10

A method for operating a screed assembly for use at a road finisher, the method comprising:
activating and/or deactivating a first compacting device of the screed assembly;
activating and/or deactivating a second compacting device of the screed assembly, which is arranged in a direction of travel of the road finisher behind the first compacting device, after expiration of a predeterminable time period, which is unequal to zero.

### Claim 11 (depends on 10)

The method according to claim 10 wherein the time period is calculated based on a driving speed of the road finisher.

### Claim 12 (depends on 10)

The method according to claim 10 wherein the time period is calculated based on a distance defined in the direction of travel of the road finisher between the compacting devices.

### Claim 13 (depends on 10)

The method according to claim 10 wherein an installation start and/or an installation end are/is detected by a sensor unit.

### Claim 14 (depends on 10)

The method according to claim 10 wherein an installation start and/or an installation end are/is detected by means of a temperature difference.

### Claim 15 (depends on 10)

The method according to one of the claim 10 wherein the first compacting device is provided at a first screed segment of the screed assembly and the second compacting device is provided at a second screed segment of the screed assembly, which is arranged in the direction of travel of the road finisher behind the first screed segment.
