# US 2017/0251492 A1 · Periodic Uplink Grant Alignment in a Cellular Network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0251492 A1
- Document ID: US20170251492A1
- Status: Published application
- Kind: A1
- Application number: 15/500,139
- Filed: 2014-08-26
- Published: 2017-08-31
- Earliest claimed: 2014-08-26
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget LM Ericsson (publ)
- Inventors: Eric Andersson; Ying Sun; Lotta Voigt
- Web page: https://patentgrep.com/patent/US20170251492A1

## CPC

- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W 88/08: Access point devices
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A node (100, 200) of a cellular network controls sending of first uplink grants to a communication device (10). The first uplink grants indicate first uplink radio resources allocated to the communication device (10) and are sent in response to receiving scheduling requests from the communication device (10). Further, the node (100, 200) controls sending of second uplink grants to the communication device (10). The second uplink grants indicate second uplink radio resources allocated to the communication device (10) and are sent according to a configured periodicity. Depending on a periodicity of opportunities for transmission of the scheduling requests by the communication device (10) and the configured periodicity of sending the second uplink grants, the node (100, 200) controls an alignment of the sending of the second uplink grants with respect to the opportunities for transmission of the scheduling requests.

## Claims

### Claim at position 1

1-25. (canceled)

### Claim 26

A method of controlling radio transmission in a cellular network, the method comprising:
a node of the cellular network controlling sending of first uplink grants to a communication device, the first uplink grants indicating first uplink radio resources allocated to the communication device and being sent in response to receiving scheduling requests from the communication device;
the node controlling sending of second uplink grants to the communication device, the second uplink grants indicating second uplink radio resources allocated to the communication device and being sent according to a configured periodicity; and
the node controlling, depending on a periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants, an alignment of the sending of the second uplink grants with respect to the opportunities for transmission of the scheduling requests.

### Claim 27 (depends on 26)

The method of claim 26, further comprising:
the node determining, depending on the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants, a maximum delay between determining a need for transmission of uplink data by the communication device and transmission of this uplink data on the radio resources indicated in one of the first uplink grants and the second uplink grants; and
the node controlling the alignment depending on the maximum delay.

### Claim 28 (depends on 26)

The method of claim 26, further comprising:
the node determining a least common multiple of the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants; and
the node controlling the alignment depending on the least common multiple of the periodicities.

### Claim 29 (depends on 28)

The method of claim 28, further comprising the node selecting an offset between sending one of the second uplink grants and a preceding one of the opportunities of sending the scheduling requests to be smaller than the least common multiple of the periodicities.

### Claim 30 (depends on 26)

The method of claim 26, further comprising:
the node determining a least common multiple of the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants; and
the node controlling the alignment depending on the least common multiple of the periodicities;
the node selecting an offset between sending one of the second uplink grants and a preceding one of the opportunities of sending the scheduling requests to be smaller than the least common multiple of the periodicities; and
wherein the node selects the offset, from candidate offsets smaller than the least common multiple of the periodicities, to correspond to that one having the smallest maximum scheduling delay.

### Claim 31 (depends on 26)

The method of claim 26, wherein the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants are integer multiples of each other.

### Claim 32 (depends on 26)

The method of claim 26, wherein the configured periodicity of sending the second uplink grants is equal to or larger than the periodicity of opportunities for transmission of the scheduling requests by the communication device.

### Claim 33 (depends on 26)

The method of claim 26, further comprising the node, depending on one or more criteria, configuring the periodicity of sending the second uplink grants.

### Claim 34 (depends on 33)

The method of claim 33, wherein the one or more criteria comprise a traffic load of the communication device and/or a channel quality experienced by the communication device.

### Claim 35 (depends on 26)

The method of claim 26, further comprising: the node sending the first uplink grants and the second uplink grants to the communication device.

### Claim 36 (depends on 26)

The method of claim 26, wherein the node is a base station of the cellular network.

### Claim 37

A node for a cellular network, the network node comprising:
processing circuitry,
memory containing instructions executable by the processing circuitry whereby the node is operative to:
control sending of first uplink grants to the communication device, the first uplink grants indicating first uplink radio resources allocated to the communication device and being sent in response to receiving scheduling requests from the communication device;
control sending of second uplink grants to the communication device, the second uplink grants indicating second uplink radio resources allocated to the communication device and being sent according to a configured periodicity; and
depending on a periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants, control an alignment of the sending of the second uplink grants with respect to the opportunities for transmission of the scheduling requests.

### Claim 38 (depends on 37)

The node of claim 37, wherein the instructions are such that the node is operative to:
depending on the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants, determine a maximum scheduling delay between determining a need for transmission of uplink data by the communication device and transmission of this uplink data on the radio resources indicated in one of the first uplink grants and the second uplink grants; and
control the alignment depending on the maximum delay.

### Claim 39 (depends on 37)

The node of claim 37, wherein the instructions are such that the node is operative to:
determine a least common multiple of the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants; and
control the alignment depending on the least common multiple of the periodicities.

### Claim 40 (depends on 39)

The node of claim 39, wherein the instructions are such that the node is operative to select an offset between sending one of the second uplink grants and a preceding one of the opportunities of sending the scheduling requests to be smaller than the least common multiple of the periodicities.

### Claim 41 (depends on 37)

The node of claim 37, wherein the instructions are such that the node is operative to:
depending on the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants, determine a maximum scheduling delay between determining a need for transmission of uplink data by the communication device and transmission of this uplink data on the radio resources indicated in one of the first uplink grants and the second uplink grants;
control the alignment depending on the maximum delay;
select an offset between sending one of the second uplink grants and a preceding one of the opportunities of sending the scheduling requests to be smaller than the least common multiple of the periodicities; and
wherein the offset is selected, from candidate offsets smaller than the least common multiple of the periodicities, to correspond to that one having the smallest maximum scheduling delay.

### Claim 42 (depends on 37)

The node of claim 37, wherein the periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants are integer multiples of each other.

### Claim 43 (depends on 37)

The node of claim 37, wherein the configured periodicity of sending the second uplink grants is equal to or larger than the periodicity of opportunities for transmission of the scheduling requests by the communication device.

### Claim 44 (depends on 37)

The node of claim 37, wherein the instructions are such that the node is operative to configure the periodicity of sending the second uplink grants depending on one or more criteria.

### Claim 45 (depends on 44)

The node of claim 44, wherein the one or more criteria comprise a traffic load of the communication device and/or a channel quality experienced by the communication device.

### Claim 46 (depends on 37)

The node of claim 37, wherein the instructions are such that the node is operative to send the first uplink grants and the second uplink grants to the communication device.

### Claim 47 (depends on 37)

The node of claim 37, wherein the node is a base station of the cellular network.

### Claim 48

A non-transitory computer readable recording medium storing a computer program product for controlling radio transmission in a cellular network, the computer program product comprising software instructions which, when run on processing circuitry of a network entity, causes the network entity to:
control sending of first uplink grants to a communication device, the first uplink grants indicating first uplink radio resources allocated to the communication device and being sent in response to receiving scheduling requests from the communication device;
control sending of second uplink grants to the communication device, the second uplink grants indicating second uplink radio resources allocated to the communication device and being sent according to a configured periodicity; and
control, depending on a periodicity of opportunities for transmission of the scheduling requests by the communication device and the configured periodicity of sending the second uplink grants, an alignment of the sending of the second uplink grants with respect to the opportunities for transmission of the scheduling requests.
