Fuel battery system and control method for fuel battery system
AssigneeHonda Motor Co., Ltd.
InventorsYasutaka SAKAI, Kuniaki OJIMA, Masaaki KOMATSU
Life of this patent
Estimating the term…
Loading patent…
AssigneeHonda Motor Co., Ltd.
InventorsYasutaka SAKAI, Kuniaki OJIMA, Masaaki KOMATSU
Estimating the term…
A fuel battery system includes a fuel battery, an electric storage, a voltage adjuster, a pump, an abnormity detector, and circuitry. The fuel battery generates electricity using fuel gas and oxidant gas. The voltage adjuster is connected to at least one of the fuel battery and the electric storage. The voltage adjuster is configured to adjust voltage output from the fuel battery or the electric storage to output the adjusted voltage to a load. The pump supplies the oxidant gas to the fuel battery using electric power output from at least one of the fuel battery and the electric storage. The voltage adjuster is connected between the fuel battery and the pump. The abnormity detector detects abnormity in the voltage adjuster. The circuitry is configured to restrict the electric power supplied to the pump in a case where the abnormity detector detects the abnormity in the voltage adjuster.
A fuel battery system comprising:
A fuel battery system comprising:
A control method for a fuel battery system including a fuel battery, an electric storage, a voltage adjuster to adjust voltage output from the fuel battery or the electric storage to output the adjusted voltage to a load, and a pump to supply an oxidant gas to the fuel battery using electric power output from at least one of the fuel battery and the electric storage, the voltage adjuster being connected between the fuel battery and the pump, the control method comprising:
Dependencies are inferred from the claim text.