Component table management system and component table management method
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsHiroki KURAHASHI, Masaki KASAHARA, Yoshinori KATO
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsHiroki KURAHASHI, Masaki KASAHARA, Yoshinori KATO
Estimating the term…
A first storage unit stores a main component table holding design information of products. A second storage unit stores a sub-component table holding the design information of the products and an update deadline of the design information for each predetermined unit constituted by products manufactured on the basis of the same design information. A first determination unit determines whether or not the main component table has been changed. A second determination unit determines whether or not a present date is before the update deadline. The second determination unit reflects contents of the change performed on the main component table on the sub-component table in a case where the main component table has been changed and the present date is before the update deadline.
A component table management system comprising:
A component table management method performed by a component table management system including a first storage unit that stores a main component table holding design information of products, and a second storage unit that stores a sub-component table holding the design information of the products and an update deadline of the design information for each predetermined unit of the products manufactured on the basis of the same design information, the method comprising:
Dependencies are inferred from the claim text.