Evaluating far field fracture complexity and optimizing fracture design in multi-well pad development
AssigneeBaker Hughes Incorporated
InventorsJames B. Crews, Robert Samuel Hurt
Life of this patent
Estimating the term…
Loading patent…
AssigneeBaker Hughes Incorporated
InventorsJames B. Crews, Robert Samuel Hurt
Estimating the term…
A method for evaluating and optimizing complex fractures, in one non-limiting example far-field complex fractures, in subterranean shale reservoirs significantly simplifies how to generate far-field fractures and their treatment designs to increase or optimize complexity. The process gives information on how much complexity is generated for a given reservoir versus distance from the wellbore under known fracturing parameters, such as rate, volume and viscosity. The method allows the evaluation of the performance of diversion materials and processes by determining the amount of fracture volume generated off of primary fractures, including far-field secondary fracture volumes. The methodology utilizes fracture hit times, volumes, pressures and similar parameters from injecting fracturing fluid from a first primary lateral wellbore to create fractures and record fracture hit times, pressures and volumes from a diagnostic lateral wellbore in the same interval.
A method for evaluating and optimizing fracture complexity when fracturing a subterranean formation having a plurality of intervals in a sequence along a first primary lateral wellbore and at least one diagnostic lateral wellbore adjacent the first primary lateral wellbore, the method comprising:
A method for evaluating and optimizing fracture complexity when fracturing a subterranean formation having a plurality of intervals in a sequence along a first primary lateral wellbore and at least one diagnostic lateral wellbore adjacent the first primary lateral wellbore, the method comprising:
A method for evaluating and optimizing fracture complexity when fracturing a subterranean formation having a plurality of intervals in a sequence along a first primary lateral wellbore and at least one diagnostic lateral wellbore adjacent the first primary lateral wellbore, the method comprising:
Dependencies are inferred from the claim text.