Systems and methods for adjusting production of a well using gas injection
AssigneeRockwell Automation Asia Pacific Business Center Pte. Ltd.
InventorHassan S. Suheil
Life of this patent
Estimating the term…
Abstract
A system may include a monitoring device that receives data associated with one or more properties at a well. The monitoring device may determine a plurality of expected flow rates of hydrocarbons produced from the well with respect to a plurality of gas injection rates associated with the well based on the data and a hydrocarbon model. The hydrocarbon model may estimate the plurality of expected flow rates of hydrocarbons. The monitoring device may then adjust a gas injection rate at the well based on the plurality of expected flow rates of hydrocarbons.
Claims20
A system, comprising:
- a monitoring device configured to receive data associated with one or more properties at a well, wherein the monitoring device is configured to:
- determine a plurality of expected flow rates of hydrocarbons produced from the well with respect to a plurality of gas injection rates associated with the well based on the data and a hydrocarbon model configured to estimate the plurality of expected flow rates of hydrocarbons;
- and
- adjust a gas injection rate at the well based on the plurality of expected flow rates of hydrocarbons.
A system, comprising:
- a monitoring device configured to receive data associated with one or more properties at a well, wherein the monitoring device is configured to:
- determine a plurality of expected flow rates of hydrocarbons produced from a plurality of wells with respect to a plurality of gas injection rates based on the data;
- and
- adjust a gas injection rate at the well based on the plurality of expected flow rates of hydrocarbons.
A method, comprising:
- receiving, via a processor, data associated with one or more properties at a well;
- determining a plurality of expected flow rates of hydrocarbons produced from the well with respect to a plurality of gas injection rates associated with the well based on the data and a hydrocarbon model configured to estimate the plurality of expected flow rates of hydrocarbons;
- and
- adjusting a gas injection rate at the well based on the plurality of expected flow rates of hydrocarbons.
Dependencies are inferred from the claim text.