# US 2016/0365805 A1 · Power transfer systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0365805 A1
- Document ID: US20160365805A1
- Status: Published application
- Kind: A1
- Application number: 14/734,964
- Filed: 2015-06-09
- Published: 2016-12-15
- Earliest claimed: 2015-06-09
- Assignees: O2Micro, Inc.
- Applicants: O2Micro Inc.
- Inventors: Guoyong GUO; Shiqiang YANG; Zhanpeng YANG
- Web page: https://patentgrep.com/patent/US20160365805A1

## CPC

- H01R 24/60: Contacts spaced along planar side wall transverse to longitudinal axis of engagement
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- G06F 1/266: {Arrangements to supply power to external peripherals either directly from the computer or under computer control, e.g. supply of power through the communication port, computer controlled power-strips}
- H01R: ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

In a power transfer system, a first main switch can transfer power from a first connector to an output terminal. A first path can deliver a current from the first connector to the output terminal and control the current to be within a predefined ranger. A second main switch can transfer power from a second connector to the output terminal. A second path can deliver a current from the second connector to the output terminal and control the current to be within a predefined range. Control circuitry can turn off the second main switch and the second path and turn on the first path if the first power source is available at the first connector when the second power source is providing power to the output terminal. The control circuitry can turn on the first main switch when a time interval from turning on the first path has elapsed.

## Claims

### Claim 1

A system comprising:
a first main switch operable for transferring power from a first connector to an output terminal if a first power source is available at said first connector;
a first path operable for delivering a first current from said first connector to said output terminal and controlling said first current to be within a first predefined range if said first power source is available at said first connector;
a second main switch operable for transferring power from a second connector to said output terminal if a second power source is available at said second connector;
a second path operable for delivering a second current from said second connector to said output terminal and controlling said second current to be within a second predefined range if said second power source is available at said second connector; and
control circuitry, coupled to said first and second main switches and said first and second paths, operable for turning off said second main switch and said second path and turning on said first path if said control circuitry detects that said first power source is available at said first connector when said second power source is providing power to said output terminal through said second connector, and operable for turning on said first main switch when a first predetermined time interval from said turning on said first path has elapsed.

### Claim 2 (depends on 1)

The system of claim 1, wherein said second path comprises:
a switch element; and
a current limit component, coupled to said switch element, operable for controlling said second current to be within said second predefined range.

### Claim 3 (depends on 2)

The system of claim 2, wherein said switch element comprises a diode, and wherein when said switch element is turned off, said diode is operable for delivering said second current to said output terminal to increase an output voltage at said output terminal.

### Claim 4 (depends on 3)

The system of claim 3, wherein said control circuitry starts counting time when said output voltage increases to a voltage threshold, wherein said control circuitry determines whether said second power source is available, wherein if said second power source is available, then said control circuitry turns on said switch element when a preset time interval has elapsed from the start of said counting time, and wherein said control circuitry turns on said second main switch when a second predetermined time interval has elapsed from turning on said switch element.

### Claim 5 (depends on 1)

The system of claim 1, wherein said first path comprises:
a switch element; and
a current limit component, coupled to said switch element, operable for controlling said first current to be within said first predefined range.

### Claim 6 (depends on 5)

The system of claim 5, wherein said control circuitry starts counting time in response to detecting that said first connector is connected to said first power source, wherein said control circuitry determines whether said first power source is available, and wherein if said first power source is available, then said control circuitry turns on said switch element when a preset time interval has elapsed from the start of said counting time.

### Claim 7 (depends on 1)

The system of claim 1, wherein said first main switch comprises a body terminal, a first body diode coupled between said body terminal and said first connector, and a second body diode coupled between said body terminal and said output terminal.

### Claim 8 (depends on 7)

The system of claim 7, wherein said control circuitry further comprises:
a body control circuit operable for maintaining an open circuit between said body terminal and said first connector in said first predetermined time interval, and enabling a short circuit between said body terminal and said first connector after said first predetermined time interval has elapsed and before said turning on said first main switch.

### Claim 9 (depends on 1)

The system of claim 1, wherein said first connector is compatible with a power source having a first maximum output power, and said second connector is compatible with a power source having a second maximum output power, and wherein said first maximum output power is greater than said second maximum output power.

### Claim 10

A method comprising:
controlling a first main switch to selectively transfer power from a first connector to an output terminal according to statuses of said first connector and a second connector;
controlling a first path to selectively deliver a first current from said first connector to said output terminal according to said statuses, wherein said first current is controlled by said first path to be within a first predefined range;
controlling a second main switch to selectively transfer power from said second connector to said output terminal according to said statuses;
controlling a second path to selectively deliver a second current from said second connector to said output terminal according to said statuses, wherein said second current is controlled by said second path to be within a second predefined range;
turning off said second main switch and said second path and turning on said first path if a first power source is detected to be available at said first connector when a second power source is providing power to said output terminal through said second connector; and
turning on said first main switch when a first predetermined time interval from said turning on said first path has elapsed.

### Claim 11 (depends on 10)

The method of claim 10, wherein said second path comprises a switch element having a diode, and wherein said controlling said second path comprises:
delivering, using said diode, said second current to said output terminal to increase an output voltage at said output terminal when said switch element is turned off.

### Claim 12 (depends on 11)

The method of claim 11, wherein said controlling said second path further comprises:
starting to count time when said output voltage increases to a voltage threshold;
determining whether said second power source is available;
if said second power source is available, then turning on said switch element when a preset time interval has elapsed from said starting; and
turning on said second main switch when a second predetermined time interval has elapsed from said turning on said switch element.

### Claim 13 (depends on 10)

The method of claim 10, wherein said first path comprises a switch element, and wherein said controlling said first path comprises:
starting to count time in response to detecting that said first connector is connected to said first power source;
determining whether said first power source is available; and
if said first power source is available, then turning said switch element when a preset time interval has elapsed from said starting.

### Claim 14 (depends on 10)

The method of claim 10, wherein said first main switch comprises a body terminal, a first body diode coupled between said body terminal and said first connector, and a second body diode coupled between said body terminal and said output terminal, wherein said controlling said first main switch comprises:
maintaining an open circuit between said body terminal and said first connector in said first predetermined time interval; and
enabling a short circuit between said body terminal and said first connector after said first predetermined time interval has elapsed and before said turning on said first main switch.

### Claim 15 (depends on 10)

The method of claim 10, further comprising:
detecting whether a power source having a first maximum output power is available at said first connector; and
detecting whether a power source having a second maximum output power is available at said second connector, wherein said first maximum output power is greater than said second maximum output power.

### Claim 16

A system comprising:
a processor; and
memory coupled to said processor, said memory comprising computer-readable instructions that, when executed by said processor, cause said power transfer system to perform a first plurality of operations, said first plurality of operations comprising:
controlling a first main switch to selectively transfer power from a first connector to an output terminal according to statuses of said first connector and a second connector;
controlling a first path to selectively deliver a first current from said first connector to said output terminal according to said statuses, wherein said first current is controlled to be within a first predefined range;
controlling a second main switch to selectively transfer power from said second connector to said output terminal according to said statuses;
controlling a second path to selectively deliver a second current from said second connector to said output terminal according to said statuses, wherein said second current is controlled to be within a second predefined range;
turning off said second main switch and said second path and turning on said first path if said power transfer system detects that a first power source is available at said first connector when a second power source is providing power to said output terminal through said second connector; and
turning on said first main switch when a predetermined time interval from said turning on said first path has elapsed.

### Claim 17 (depends on 16)

The system of claim 16, wherein said computer-readable instructions, when executed by said processor, also cause said power transfer system to perform a second plurality of operations, and wherein said second plurality of operations comprise:
starting to count time if said power transfer system detects that said second connector is connected to said second power source and no power is being provided at said first connector;
determining whether said second power source is available; and
if said second power source is available, then turning on a switch element in said second path when a preset time interval from said starting has elapsed.

### Claim 18 (depends on 16)

The system of claim 16, wherein said computer-readable instructions, when executed by said processor, also cause said power transfer system to perform a second plurality of operations, and wherein said second plurality of operations comprise:
starting to count time if said power transfer system detects that said first connector is connected to said first power source when said second power source is providing power to said output terminal through said second connector;
determining whether said first power source is available; and
if said first power source is available, then turning on a switch element in said first path when a preset time interval from said starting has elapsed.

### Claim 19 (depends on 16)

The system of claim 16, wherein said computer-readable instructions, when executed by said processor, also cause said power transfer system to perform a second plurality of operations, and wherein said second plurality of operations comprise:
maintaining an open circuit between a body terminal of said first main switch and said first connector in said predetermined time interval; and
enabling a short circuit between said body terminal and said first connector after said predetermined time interval has elapsed and before said turning on said first main switch, wherein said first main switch comprises a first body diode coupled between said body terminal and said first connector, and a second body diode coupled between said body terminal and said output terminal.

### Claim 20 (depends on 16)

The system of claim 16, wherein said computer-readable instructions, when executed by said processor, also cause said power transfer system to detect whether a power source having a first maximum output power is available at said first connector, and to detect whether a power source having a second maximum output power is available at said second connector, and wherein said first maximum output power is greater than said second maximum output power.
