# US 2016/0365162 A1 · System to control asset decommissioning and reconcile constraints

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0365162 A1
- Document ID: US20160365162A1
- Status: Published application
- Kind: A1
- Application number: 14/738,404
- Filed: 2015-06-12
- Published: 2016-12-15
- Earliest claimed: 2015-06-12
- Assignees: General Electric Company
- Applicants: General Electric Company
- Inventors: Christopher Donald Johnson; Brian Nathan Dingman; Ilkin Onur Dulgeroglu; David Joseph Brewer; Gregg Allen Schneider; Eric Russell Mino
- Web page: https://patentgrep.com/patent/US20160365162A1

## CPC

- G21D 1/003: {Nuclear facilities decommissioning arrangements (decontamination arrangements, treating radioactively contaminated material G21F9/00)}
- G06Q 10/0637: Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- Y02E 30/00: Energy generation of nuclear origin
- Y02E 30/30: Nuclear fission reactors
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- G21D: NUCLEAR POWER PLANT
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Aspects of the present disclosure involve a system comprising a computer-readable storage medium storing at least one program, and a method for generating optimal power plant decommissioning plans based on stakeholder constraints. In example embodiments, the method may include receiving one or more constraints for determining a power plant decommissioning plan. The method further includes accessing decommissioning strategy data representing a plurality of possible decommissioning plans, and generating a decommissioning plan in accordance with the constraints based on the decommissioning strategy data. The method may further include causing presentation of a user interface on a client device that includes a graphical representation of the power plant decommissioning plan.

## Claims

### Claim 1

A method comprising:
receiving constraint data comprising one or more constraints for determining a power plant decommissioning plan;
accessing decommissioning strategy data, the decommissioning strategy data including a decision tree, the decision tree including nodes representing activities associated with decommissioning a power plant;
parsing the decommissioning strategy data to identify a plurality of paths in the decision tree, each path of the plurality of paths representing a possible power plant decommissioning plan;
generating, using one or more processors, decommissioning plan data in accordance with the constraint data based on the decommissioning strategy data, the decommissioning plan data including the power plant decommissioning plan, the power plant decommissioning plan corresponding to a path selected from the plurality of paths of the decision tree; and
causing presentation of a user interface on a client device, the user interface including a graphical representation of the power plant decommissioning plan.

### Claim 2 (depends on 1)

The method of claim 1, further comprising calculating a range of return values associated with each path in the plurality of paths of the decision tree, wherein the path selected from the plurality of paths in the decision tree is selected based on the range of return vales associated with the path.

### Claim 3 (depends on 2)

The method of claim 2, wherein the calculating of the range of return values associated with each path in the decision tree includes:
calculating a set of activity values, the set of activity values corresponding to costs associated with each activity in the path;
calculating a set of operational values, the set of operational values corresponding to cash flows associated with operating the power plant;
calculating a set of investment values, the set of investment values corresponding to investment returns associated with the power plant; and
aggregating the set of activity values, the set of operational values, and the set of investment values to determine the range of return values.

### Claim 4 (depends on 3)

The method of claim 3, further comprising accessing a probabilistic model including a plurality of variables and a predicted range of values for each variable in the plurality of variables, wherein the plurality of variables and the predicted range of values are used in calculating the set of activity values, the set of operational values, and the set of investment values.

### Claim 5 (depends on 3)

The method of claim 3, wherein the calculating of the set of investment values is based on financial data obtained, via network, from a computer system corresponding to a financial institution.

### Claim 6 (depends on 4)

The method of claim 4, wherein the plurality of variables includes at least one of an inflation rate, an investment growth rate, an energy rate, an energy production rate, and activity cost values.

### Claim 7 (depends on 1)

The method of claim 1, further comprising calculating a risk value associated with each path in the plurality of paths of the decision tree, wherein the path selected from the plurality of paths in the decision tree is selected based on the risk value associated with the path.

### Claim 8 (depends on 1)

The method of claim 1, wherein the generating of the decommissioning plan data includes:
identifying a subset of paths from the plurality of paths that satisfy the one or more constraints;
ranking each path in the subset of paths; and
selecting the path from the subset of paths based on the ranking of the path.

### Claim 9 (depends on 8)

The method of claim 8, wherein the user interface includes a graphical representation of the decision tree, the graphical representation of the decision tree including the ranking of each path.

### Claim 10 (depends on 8)

The method of claim 8,
wherein the constraint data includes a threshold risk value;
wherein the identifying the subset of paths includes determining the subset of paths include an associated risk value below the threshold risk value;
wherein the ranking of each path in the subset of paths is based on a return associated with each path; and
wherein the selecting of the path is based on the return associated with the path.

### Claim 11 (depends on 1)

The method of claim 1, wherein the one or more constraints include at least one of a threshold risk value, a threshold return value, a decommissioning start date, a start date for a certain activity, a decommissioning end date, or a decommissioning time horizon.

### Claim 12

A system comprising:
a machine-readable medium to store decommissioning strategy data, the decommissioning strategy data including a decision tree, the decision tree including a plurality of nodes, each node in the plurality of nodes corresponding to an activity associated with decommissioning a power plant, each path in the decision tree representing a possible power plant decommissioning plan;
an interface module to receive constraint data comprising one or more constraints for determining a power plant decommissioning plan;
an optimization module, comprising one or more processors, to generate decommissioning plan data based on the decommissioning strategy data in accordance with the constraint data, the decommissioning plan data including the requested power plant decommissioning plan, the power plant decommissioning plan corresponding to a path selected from a plurality of paths of the decision tree; and
the user interface module further to cause presentation of a user interface on a client device, the user interface including a graphical representation of the power plant decommissioning plan.

### Claim 13 (depends on 12)

The system of claim 12, further comprising a simulation module to:
calculate a range of return values associated with each path in the plurality of paths of the decision tree; and
calculate a risk associated with each path based on the range of return values associated with each path;
wherein the path selected from the plurality of paths in the decision tree is selected based on the range of return values and the risk associated with the path.

### Claim 14 (depends on 13)

The system of claim 13, wherein the simulation module is to calculate the range of return values associated with each path by performing operations comprising:
calculating a set of activity values, the set of activity values corresponding to costs associated with each activity in the path;
calculating a set of operational values, the set of operational values corresponding to cash flows associated with operating the power plant;
calculating a set of investment values, the set of investment values corresponding to investment returns associated with the power plant; and
aggregating the set of activity values, the set of operational values, and the set of investment values to determine the range of return values.

### Claim 15 (depends on 14)

The system of claim 14, wherein the operations further comprise accessing a probabilistic model including a plurality of variables and a predicted range of values for each variable in the plurality of variables, wherein the plurality of variables and the predicted range of values are used in calculating the set of activity values, the set of operational values, and the set of investment values.

### Claim 16 (depends on 15)

The system of claim 15, wherein the plurality of variables includes at least one of an inflation rate, an investment growth rate, an energy rate, an energy production rate, and activity cost values.

### Claim 17 (depends on 12)

The system of claim 12, wherein the optimization module is to generate the decommissioning plan data by performing operations comprising:
identifying a subset of paths from the plurality of paths that satisfy the one or more constraints;
ranking each path in the subset of paths; and
selecting the path from the subset of paths based on the ranking of the path.

### Claim 18 (depends on 12)

The system of claim 12, wherein the one or more constraints include at least one of a threshold risk value, a threshold return value, a decommissioning start date, a start date for a certain activity, a decommissioning end date, or a decommissioning time horizon.

### Claim 19 (depends on 12)

The system of claim 12, wherein the graphical representation of the optimal decommissioning plan includes a graphical representation of the decision tree, wherein the path corresponding to the decommissioning plan is visually distinguished from the remainder of paths in the decision tree.

### Claim 20

A non-transitory machine-readable storage medium embodying instructions that, when executed by at least one processor of a machine, cause the machine to perform operations comprising:
receiving constraint data comprising one or more constraints for determining a power plant decommissioning plan;
accessing decommissioning strategy data, the decommissioning strategy data including a decision tree, the decision tree including nodes representing activities associated with decommissioning a power plant;
parsing the decommissioning strategy data to identify a plurality of paths in the decision tree, each path of the plurality of paths representing a possible power plant decommissioning plan;
generating, using one or more processors, decommissioning plan data based on the decommissioning strategy data in accordance with the constraint data, the decommissioning plan data including the requested power plant decommissioning plan, the power plant decommissioning plan corresponding to a path selected from the plurality of paths of the decision tree; and
causing presentation of a user interface on a client device, the user interface including a graphical representation of the power plant decommissioning plan.