# US 2016/0364975 A1 · Equipment life span monitoring system and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0364975 A1
- Document ID: US20160364975A1
- Status: Published application
- Kind: A1
- Application number: 15/178,286
- Filed: 2016-06-09
- Published: 2016-12-15
- Earliest claimed: 2015-06-10
- Assignees: Alstom Transport Technologies
- Applicants: Alstom Transport Technologies
- Inventors: Ravindra R
- Web page: https://patentgrep.com/patent/US20160364975A1

## CPC

- G08B 21/187: {Machine fault alarms}
- G05B 23/0283: {Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL] (preventive maintenance, i.e. planning maintenance according to the available resources without monitoring the system G06Q10/06)}
- G06N 5/04: Inference or reasoning models
- G08B: SIGNALLING SYSTEMS, e.g. PERSONAL CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A monitoring system and method monitor one or more operational conditions of first equipment during operation of the first equipment and predict a life span of the first equipment based on the one or more operational conditions. The life span that is predicted differs from a designated life span of the first equipment that is determined prior to operation of the first equipment. The system and method can create or modify schedules for repair or replacement of other equipment to include repair or replacement of the first equipment based on the life span that is predicted.

## Claims

### Claim 1

A method comprising:
monitoring one or more operational conditions of first equipment during operation of the first equipment; and
predicting a life span of the first equipment based on the one or more operational conditions, wherein the life span that is predicted differs from a designated life span of the first equipment that is determined prior to operation of the first equipment.

### Claim 2 (depends on 1)

The method of claim 1, wherein the one or more operational conditions of the first equipment include one or more of a number of charging and discharging cycles, a temperature, a humidity, a state of charging, a number of activation and deactivation cycles, or a number of lumen hours.

### Claim 3 (depends on 1)

The method of claim 1, wherein the first equipment includes one or more of a battery, a relay, a solenoid, or a light bulb.

### Claim 4 (depends on 1)

The method of claim 1, further comprising generating one or more alarms responsive to a time in use of the first equipment coming within a designated period of time of the life span that is predicted.

### Claim 5 (depends on 1)

The method of claim 1, wherein generating the one or more alarms includes generating at least one of an audible alarm or a visual alarm to instruct an operator to one or more of repair or replace the first equipment prior to reaching an end of the life span that is predicted.

### Claim 6 (depends on 1)

The method of claim 1, further comprising automatically scheduling one or more of repair or replacement of the first equipment to occur prior to an end of the life span that is predicted.

### Claim 7 (depends on 1)

The method of claim 1, wherein the one or more of repair or replacement of the first equipment is scheduled responsive to a time in use of the first equipment coming within a designated period of time of the life span that is predicted.

### Claim 8 (depends on 1)

The method of claim 1, wherein automatically scheduling the one or more of repair or replacement of the first equipment includes:
examining one or more previously generated schedules for one or more of repair or replacement of second equipment disposed along a route that the first equipment is disposed along;
determining whether the one or more of repair or replacement of the second equipment is scheduled to occur after expiration of the life span of the first equipment that is predicted; and
automatically modifying at least one of the previously generated schedules to include the one or more of repair or replacement of the first equipment with the one or more of repair or replacement of the second equipment.

### Claim 9

A system comprising:
a monitoring device configured to monitor one or more operational conditions of first equipment during operation of the first equipment; and
an analysis device configured to predict a life span of the first equipment based on the one or more operational conditions, wherein the life span that is predicted differs from a designated life span of the first equipment that is determined prior to operation of the first equipment.

### Claim 10 (depends on 9)

The system of claim 9, wherein the one or more operational conditions of the first equipment include one or more of a number of charging and discharging cycles, a temperature, a humidity, a state of charging, a number of activation and deactivation cycles, or a number of lumen hours.

### Claim 11 (depends on 9)

The system of claim 9, wherein the first equipment includes one or more of a battery, a relay, a solenoid, or a light bulb.

### Claim 12 (depends on 9)

The system of claim 9, further comprising an output device configured to generate one or more alarms responsive to a time in use of the first equipment coming within a designated period of time of the life span that is predicted.

### Claim 13 (depends on 9)

The system of claim 9, wherein the output device is configured to generate the one or more alarms by generating at least one of an audible alarm or a visual alarm to instruct an operator to one or more of repair or replace the first equipment prior to reaching an end of the life span that is predicted.

### Claim 14 (depends on 9)

The system of claim 9, wherein the analysis device is configured to automatically schedule one or more of repair or replacement of the first equipment to occur prior to an end of the life span that is predicted.

### Claim 15 (depends on 9)

The system of claim 9, wherein the analysis device is configured to schedule the one or more of repair or replacement of the first equipment responsive to a time in use of the first equipment coming within a designated period of time of the life span that is predicted.

### Claim 16 (depends on 9)

The system of claim 9, wherein the analysis device is configured to automatically schedule the one or more of repair or replacement of the first equipment by examining one or more previously generated schedules for one or more of repair or replacement of second equipment disposed along a route that the first equipment is disposed along, determining whether the one or more of repair or replacement of the second equipment is scheduled to occur after expiration of the life span of the first equipment that is predicted, and automatically modifying at least one of the previously generated schedules to include the one or more of repair or replacement of the first equipment with the one or more of repair or replacement of the second equipment.

### Claim 17

A method comprising:
monitoring one or more operational conditions of first equipment during operation of the first equipment;
predicting a life span of the first equipment based on the one or more operational conditions;
examining one or more previously generated schedules for one or more of repair or replacement of second equipment disposed along a route that the first equipment is disposed along;
determining whether the one or more of repair or replacement of the second equipment is scheduled to occur after expiration of the life span of the first equipment that is predicted; and
automatically modifying at least one of the previously generated schedules to include the one or more of repair or replacement of the first equipment with the one or more of repair or replacement of the second equipment.

### Claim 18 (depends on 17)

The method of claim 17, wherein the life span that is predicted differs from a designated life span of the first equipment that is determined prior to operation of the first equipment.

### Claim 19 (depends on 17)

The method of claim 17, wherein the one or more operational conditions of the first equipment include one or more of a number of charging and discharging cycles, a temperature, a humidity, a state of charging, a number of activation and deactivation cycles, or a number of lumen hours.

### Claim 20 (depends on 17)

The method of claim 17, wherein the first equipment includes one or more of a battery, a relay, a solenoid, or a light bulb.
