# US 2016/0356130 A1 · Methods for preserving zonal isolation within a subterranean formation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0356130 A1
- Document ID: US20160356130A1
- Status: Published application
- Kind: A1
- Application number: 15/117,160
- Filed: 2015-02-03
- Published: 2016-12-08
- Earliest claimed: 2014-02-07
- Assignees: Suncor Energy Inc.
- Applicants: Suncor Energy Inc.
- Inventors: Grant DUNCAN
- Web page: https://patentgrep.com/patent/US20160356130A1

## CPC

- E21B 43/103: {of expandable casings, screens, liners, or the like}
- E21B 29/10: Reconditioning of well casings, e.g. straightening
- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B 33/14: for cementing casings into boreholes
- E21B 43/105: {Expanding tools specially adapted therefor}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

There is provided a method for effecting at least partial interference of a fluid passage extending between a casing, disposed within a wellbore that is penetrating a subterranean formation, and the subterranean formation. The method includes detecting the fluid passage, and effecting an operative displacement of a casing section of the casing such that at least partial interference of the fluid passage is effected.

## Claims

### Claim 1

A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating the subterranean formation, and wherein zonal isolation material is disposed between the casing and the subterranean formation, comprising:
in response to detecting of the fluid passage extending between the casing and the subterranean formation, effecting an operative displacement of a section of the casing such that the at least partial interference of the fluid passage is effected; and
effecting opposition to an elastic contraction of the displaced casing section for mitigating reversion of the displaced casing section towards its original position prior to the operative displacement.

### Claim 2

(canceled)

### Claim 3

(canceled)

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein the effecting of the operative displacement includes effecting expansion of the casing section.

### Claim 5

(canceled)

### Claim 6

(canceled)

### Claim 7 (depends on 1)

The method as claimed in claim 1, wherein the effecting of the operative displacement of the section of the casing includes effecting relative movement between a mandrel and a sleeve along their respective tapered surfaces such that deflection of the sleeve is effected in response to the relative movement and the deflected sleeve is pressed against the casing section to expand the casing section.

### Claim 8 (depends on 7)

The method as claimed in claim 7, wherein the effecting of the opposition to the elastic contraction of the displaced casing section comprises maintaining the deflected sleeve within the expanded casing section.

### Claim 9

(canceled)

### Claim 10

(canceled)

### Claim 11 (depends on 1)

The method as claimed in claim 1, wherein both of the effecting of the operative displacement and the effecting of the opposition to the elastic contraction are effected by the same tool.

### Claim 12 (depends on 1)

The method as claimed in claim 1, wherein, prior to the effecting of the operative displacement of the casing section, the casing is spaced apart from the zonal isolation material to define a spacing, wherein the fluid passage is defined by the spacing.

### Claim 13 (depends on 1)

The method as claimed in claim 1, wherein, prior to the effecting of the operative displacement of the casing section, the zonal isolation material is spaced apart from the subterranean formation to define a spacing, wherein the fluid passage is defined by the spacing.

### Claim 14

(canceled)

### Claim 15 (depends on 1)

The method as claimed in claim 1, further comprising, prior to the effecting of the operative displacement, selecting the casing section, to which a force is to be applied to effect the operative displacement, based on at least a determination that, upon the casing section becoming disposed in the displaced position, the fluid passage will become obstructed by the casing or by displaced zonal isolation material.

### Claim 16 (depends on 1)

The method as claimed in claim 1, wherein the at least partial interference is effected over a continuous portion of the fluid passage having an axial length “L” of at least about five (5) centimetres.

### Claim 17 (depends on 1)

The method as claimed in claim 1, further comprising:
prior to the effecting of the operative displacement of the section of the casing, detecting the fluid passage.

### Claim 18 (depends on 17)

The method as claimed in claim 17, wherein the detecting is effected by a zonal isolation material bond log or a zonal isolation material evaluation tool.

### Claim 19

A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating a subterranean formation, and wherein zonal isolation material is disposed between the casing and the subterranean formation, comprising:
deploying a tool within the wellbore;
effecting an operative displacement of a section of the casing with the tool such that the at least partial interference of the fluid passage extending between the casing and the subterranean formation is effected; and
effecting opposition to an elastic contraction of the displaced casing section for mitigating reversion of the displaced casing section towards its original position prior to the operative displacement.

### Claim 20

(canceled)

### Claim 21

(canceled)

### Claim 22 (depends on 19)

The method as claimed in claim 19, wherein the effecting of the operative displacement comprises effecting deformation or expansion of the casing section.

### Claim at position 23

23-25. (canceled)

### Claim 26 (depends on 22)

The method as claimed in claim 22, wherein the tool includes a mandrel and a sleeve, and the effecting of the deformation or expansion includes effecting relative movement between the mandrel and the sleeve along their respective tapered surfaces such that deflection of the sleeve is effected in response to the relative movement and the deflected sleeve is pressed against the casing section for effecting the deformation or expansion of the casing section.

### Claim 27 (depends on 26)

The method as claimed in claim 26, wherein the opposition to the elastic contraction of the displaced casing section is effected by maintaining the deflected sleeve within the casing.

### Claim at position 26

28-37. (canceled)

### Claim 38

A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating a subterranean formation, and wherein cement is disposed between the casing and the subterranean formation, comprising:
deploying a tool including a split ring within the wellbore;
expanding the split ring against a casing section to effect an operative displacement of the casing section to a displaced position, wherein, upon the casing section becoming displaced to the displaced position, the cement becomes disposed opposite to a subterranean formation portion that is relatively impermeable and effects the at least partial interference of the fluid passage; and
effecting retention of the casing section in the displaced position, or in substantially the displaced position, with the expanded split ring.

### Claim 39

A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating a subterranean formation, and wherein cement is disposed between the casing and the subterranean formation, comprising:
deploying a tool including a sleeve and a mandrel, wherein the sleeve is configured to be deflected in response to relative movement between the mandrel and the sleeve along their respective tapered surfaces; and
actuating relative movement between the mandrel and the sleeve along their respective tapered surfaces such that the sleeve is deflected and the deflected sleeve is pressed against the casing section such that an operative displacement of the casing section is effected, wherein, upon the casing section becoming displaced to the displaced position, the cement becomes disposed.

### Claim 40 (depends on 1)

The method as claimed in claim 1, wherein the operative displacement is effected by deploying a tool within the wellbore.

### Claim 41 (depends on 40)

The method as claimed in claim 40, wherein the effecting of the operative displacement includes exerting a force, with the tool, against the casing section.

### Claim 42

A method for occluding a gap between a casing of a wellbore and a formation, the method comprising:
identifying the presence of the gap between the casing's external surface and the formation;
deploying an expansion tool within the casing; and
applying an outward force against the casing with the expansion tool, to expand and operatively displace the casing radially outwards to occlude the gap.

### Claim 43 (depends on 42)

The method as claimed in claim 42, wherein the gap is formed subsequent to operation of the wellbore to recover hydrocarbons from the formation.

### Claim 44 (depends on 42)

The method as claimed in claim 42, wherein the gap allows gas, fluid, or vapor migration from the formation to the surface along the outside of the casing.

### Claim 45 (depends on 42)

The method as claimed in claim 42, further comprising installation of a retainer tool within the casing to effect the operative displacement and/or to retain the displaced position of the casing.

### Claim 46 (depends on 42)

The method as claimed in claim 42, wherein the gap is situated within cement between the casing and the formation.

### Claim 47 (depends on 46)

The method as claimed in claim 46, wherein the cement has lost structural integrity subsequent to thermal operation of the wellbore.

### Claim 48

A method for restoring zonal isolation in a cased and cemented portion of a thermally operated well in a formation, the method comprising:
detecting the presence of a gap extending between the casing and the formation;
deploying an expansion tool within a section of the casing; and
effecting an operative and radially outward displacement of the casing section to occlude the gap.

### Claim 49 (depends on 48)

The method as claimed in claim 48, wherein the gap is formed subsequent to operation of the wellbore to recover hydrocarbons from the formation.

### Claim 50 (depends on 48)

The method as claimed in claim 48, wherein the gap allows gas, fluid, or vapor migration from the formation to the surface along the outside of the casing.

### Claim 51 (depends on 48)

The method as claimed in claim 48, wherein the expansion tool comprises a sleeve having tapered surfaces.

### Claim 52 (depends on 48)

The method as claimed in claim 48, further comprising installation of a retainer tool within the casing to effect the operative displacement and/or to retain the displaced position of the casing.

### Claim 53 (depends on 48)

The method as claimed in claim 48, wherein the gap is situated within cement between the casing and the formation.

### Claim 54 (depends on 53)

The method as claimed in claim 53, wherein the cement has lost structural integrity subsequent to thermal operation of the wellbore.
