# US 2016/0356045 A1 · Multi-purpose anchor devices

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0356045 A1
- Document ID: US20160356045A1
- Status: Published application
- Kind: A1
- Application number: 14/732,023
- Filed: 2015-06-05
- Published: 2016-12-08
- Earliest claimed: 2015-06-05
- Assignees: Eric Fenske
- Inventors: Eric Fenske
- Web page: https://patentgrep.com/patent/US20160356045A1

## CPC

- E04C 5/12: Anchoring devices (tools or methods for tensioning {in situ} E04G21/12)
- E04B 1/41: Connecting devices specially adapted for embedding in concrete or masonry ({joist hangers E04B1/2612; shear dowels E04B1/483;} spacers {other than masonry wall ties} for cavity walls E04B2/30, E04B2/44; connectors for reinforcing elements E04C5/16; fastening frames to the border of openings E06B1/56)
- E04B 1/4107: {Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails}
- E04B 2/88: Curtain walls {(fixing of glass panes E06B3/54)}
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})

## Abstract

A multi-purpose anchor device for use in anchoring one or more tension cables and one or more window or curtain walls. In this respect, the anchor includes a channel, angle bracket, or plate for use in attaching to a window or curtain wall. One or more tension cables are also coupled to the anchor, which anchors the tension cables. The multi-purpose nature of the anchor allows for the reduction in materials cost, installation time, and conflict issues between placement of previously known anchors.

## Claims

### Claim 1

An anchor device for concrete, comprising:
a base portion having a first side adapted to be disposed in an edge of a concrete structure to couple a wall to the edge; and
a tension cable attached to an exterior of the first side and adapted to extend from the exterior into the concrete structure.

### Claim 2 (depends on 1)

The anchor device of claim 1, wherein the base portion further includes second and third sides extending from the first side in a first direction, the first, second and third sides cooperatively forming a channel.

### Claim 3 (depends on 2)

The anchor device of claim 2, wherein the base portion further includes teeth respectively extending from edges of the second and third sides opposite the first side.

### Claim 4 (depends on 3)

The anchor device of claim 3, wherein the teeth extend in a second direction into the channel.

### Claim 5 (depends on 2)

The anchor device of claim 2, further comprising an anchor pin adapted to be received in the channel and couple the wall to the edge of the concrete structure.

### Claim 6 (depends on 1)

The anchor device of claim 1, wherein the base portion further includes a second side adapted to face away from the edge of the concrete structure and couple the wall to the edge of the concrete structure.

### Claim 7 (depends on 1)

The anchor device of claim 1, wherein the base portion further includes first and second portions extending from and substantially perpendicular to the first portion, the first portion including the first side and is adapted to extend along a vertical edge of the concrete structure, and the second portion is adapted to extend along a horizontal edge of the concrete structure and couple the wall to the concrete structure.

### Claim 8 (depends on 1)

The anchor device of claim 1, further comprising an anchor stud coupled to the first side and adapted to extend from the first side into the concrete structure.

### Claim 9

An anchor device for concrete, comprising:
a base portion adapted to be disposed in an edge of a concrete structure to couple a wall to the edge;
an aperture in the first side adapted to receive a tension cable; and
a cut-out in the base portion adapted to allow access for a tension tool to tension a cable when the cable is inserted through the aperture.

### Claim 10 (depends on 9)

The anchor device of claim 9, wherein the base portion further includes second and third sides extending from the first side in a first direction, the first, second and third sides cooperatively forming a channel.

### Claim 11 (depends on 10)

The anchor device of claim 10, further comprising an anchor pin adapted to be received in the channel and couple the wall to the edge of the concrete structure.

### Claim 12 (depends on 9)

The anchor device of claim 9, wherein the base portion further includes a second side adapted to face away from the edge of the concrete structure and couple the wall to the edge of the concrete structure.

### Claim 13 (depends on 9)

The anchor device of claim 9, wherein the base portion further includes first and second portions extending from and substantially perpendicular to the first portion, the first portion including the first side and is adapted to extend along a vertical edge of the concrete structure, and the second portion is adapted to extend along a horizontal edge of the concrete structure and couple the wall to the concrete structure.

### Claim 14

An anchor system for concrete, comprising:
a first anchor device adapted to be disposed along a first edge of a concrete structure and couple a first wall to the concrete structure, the first anchor device including:
a first base portion having a first side adapted to face in a direction towards the concrete structure; and
a tension cable attached to an exterior of the first side of the first base portion and adapted to extend from the exterior into the concrete structure;
a second anchor device adapted to be embedded in a second edge of the concrete structure opposite the first edge, the second anchor device including:
a second base portion having a first side adapted to face in a direction towards the concrete structure; and
an aperture in the first side of the second base portion adapted to receive the tension cable.

### Claim 15 (depends on 14)

The anchor system of claim 14, wherein:
the first portion includes:
a second side extending from the first side of the first base portion in a first direction with respect to the first side of the first base portion, and
a third side extending from the first side of the first base portion in the first direction, the first, second and third sides of the first base portion cooperatively forming a first channel; and
the second base portion includes:
a second side extending from the first side of the second base portion in a first direction with respect to the first side of the second base portion, and
a third side extending from the first side of the second base portion in the first direction respect to the first side of the second base portion, the first, second and third sides of the second base portion cooperatively forming a second channel.

### Claim 16 (depends on 15)

The anchor system of claim 15, wherein:
the first base portion includes a first anchor pin adapted to be received in the first channel and couple the first wall to the first edge of the concrete structure; and
the second base portion includes second anchor pin adapted to be received in the second channel and couple a second wall so the second edge of the concrete structure.

### Claim 17 (depends on 14)

The anchor system of claim 14, wherein:
the first base portion includes a second side adapted to face away from the first edge of the concrete structure and couple the first wall to the first edge of the concrete structure; and
the second base portion includes a second side adapted to face away from the second edge of the concrete structure and couple a second wall to the second edge of the concrete structure.

### Claim 18 (depends on 14)

The anchor device of claim 14, wherein the first base portion includes a first portion and a second portion extending from and substantially perpendicular to the first portion, the first portion including the first side of the first base portion and adapted to extend along a vertical edge of the concrete structure, the second portion adapted to extend along a horizontal edge of the concrete structure and couple the first wall to the concrete structure.

### Claim 19

A method of constructing a post-tensioned concrete structure, comprising:
disposing a first anchor device at a first edge of a concrete formwork for the concrete structure, the first anchor device including a first base portion adapted to couple a first wall to the concrete structure and a tension cable attached to an exterior of the first base portion and extending from the exterior portion into the concrete formwork;
disposing a second anchor device at a second edge of the concrete formwork opposite the first edge, the second anchor device including a second base portion adapted to couple a second wall to the concrete structure and an aperture adapted to receive the tension cable;
extending the tension cable across the concrete formwork and through the aperture of the second anchor device;
pouring concrete into the concrete formwork, thereby embedding the first and second anchor devices in the respective edges of the concrete structure; and
tensioning the tension cable from the second edge after the concrete has hardened.

### Claim 20 (depends on 19)

The method of claim 19, further comprising installing supports adapted to support the tension cable across the concrete formwork.