# US 2016/0258225 A1 · Blowout preventer trolley

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0258225 A1
- Document ID: US20160258225A1
- Status: Published application
- Kind: A1
- Application number: 14/639,826
- Filed: 2015-03-05
- Published: 2016-09-08
- Earliest claimed: 2015-03-05
- Assignees: Patterson-UTI Drilling Company LLC
- Applicants: Patterson-Uti Drilling Company LLC
- Inventors: Katherine J. Holst; Michael F. Jones; Tyson Andrew Springer; Kristopher Landon Murray Butler; Bradley James Schroeder; Christopher Medland
- Web page: https://patentgrep.com/patent/US20160258225A1

## CPC

- E21B 15/00: Supports for the drilling machine, e.g. derricks or masts
- E21B 33/06: Blow-out preventers {, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers (rotating blow-out preventers E21B33/085)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A box substructure for a drill rig has a box frame including a medial side oriented towards a space located under a drill floor of the drill rig. A trolley structure is connected to the box frame and protrudes away from the medial side. The trolley structure also has an overhanging end opposite of the medial side.

## Claims

### Claim 1

A box substructure for a drill rig, comprising:
a box frame including a medial side oriented towards a space located under a drill floor of the drill rig; and
a trolley structure connected to the box frame and protruding away from the medial side;
the trolley structure having an overhanging end opposite the medial side;
the trolley structure having multiple arms where each of the multiple arms includes a first end pivotally attached to the medial side of the box substructure and a second end pivotally attached to a trolley beam.

### Claim 2

(canceled)

### Claim 3 (depends on 2)

The box substructure of claim 2, wherein the trolley structure comprises a transport position where the multiple arms are aligned with the medial side of the box frame.

### Claim 4 (depends on 2)

The box substructure of claim 2, wherein the trolley structure comprises an operating position where the multiple arms are transverse to the medial side of the box frame.

### Claim 5 (depends on 2)

The box substructure of claim 2, further comprising a track formed in the trolley beam that is aligned with a medial side of the box frame.

### Claim 6 (depends on 5)

The box substructure of claim 5, further comprising a hoist moveably attached to the track.

### Claim 7 (depends on 6)

The box substructure of claim 6, wherein the hoist is capable of lifting over 2,000 pounds.

### Claim 8 (depends on 1)

The box substructure of claim 1, wherein the trolley structure is positioned at a height with respect to ground level that is higher than a center of gravity of a blowout preventer stack standing upright on the ground level.

### Claim 9

A drill rig, comprising:
a first box substructure with a first box frame including a first medial side oriented towards a second box substructure with a second box frame including a second medial side oriented towards the first box substructure;
the first box substructure being spaced apart from the second box substructure an overall distance;
a first trolley structure connected to the first box frame and protruding towards the second box substructure to a first partial distance; and
a second trolley structure connected to the second box frame and protruding towards the first box substructure to a second partial distance;
wherein the first partial distance and the second partial distance are each less than the overall distance, and the first trolley structure is independent of the second trolley structure and
wherein the first trolley structure includes a first arm set and the second trolley structure includes a second arm set, wherein arms in the first arm set and the second arm set each include a first end pivotally attached to either the first medial side or the second medial side, respectively.

### Claim 10

(canceled)

### Claim 11 (depends on 9)

The drill rig of claim 9, wherein the arms of the first arm set include a second end pivotally attached to a first trolley beam, and the arms of the second arm set include the second end pivotally attached to a second trolley beam.

### Claim 12 (depends on 11)

The drill rig of claim 11, wherein the first trolley structure comprises a first transport position where the first arm set is aligned with the first medial side of the first box frame and the second trolley structure comprises a second transport position where the second arm set is aligned with the second medial side of the second box frame.

### Claim 13 (depends on 9)

The drill rig of claim 9, wherein the first trolley structure comprises a first operating position where the first arm set is transverse to the first medial side of the first box frame, and the second trolley structure comprises a second operating position where the second arm set is transverse to the second medial side of the second box frame.

### Claim 14 (depends on 9)

The drill rig of claim 9, further comprising a first track formed in a first trolley beam that is aligned with the first medial side of the first box frame and a second track formed in a second trolley beam that is aligned with the second medial side of the second box frame.

### Claim 15 (depends on 14)

The drill rig of claim 14, further comprising a first hoist moveably attached to the first track and a second hoist moveably attached to the second track.

### Claim 16 (depends on 9)

The drill rig of claim 9, further comprising a first hoist connected to the first trolley structure, and a second hoist connected to the second trolley structure.

### Claim 17

A method for assembling a drill rig, comprising:
moving a first trolley structure pivotally connected to a first medial portion of a first box substructure with a first plurality of arms from a first transport position to a first operating position; and
moving a second trolley structure pivotally connected to a second medial portion of a second box substructure with a second plurality of arms from a second transport position to a second operating position.

### Claim 18 (depends on 17)

The method of claim 17, further comprising:
attaching a blowout preventer to a first hoist moveably connected to a first track of the first trolley structure;
attaching the blowout preventer to a second hoist moveably connected to a second track of the second trolley structure;
lifting the blowout preventer with the first hoist and the second hoist; and
guiding the blowout preventer to a position located underneath a drill floor of the drill rig by moving the first hoist along the first track and moving the second hoist along the second track.

### Claim 19 (depends on 17)

The method of claim 17, wherein the first trolley structure includes a first arm set and the second trolley structure includes a second arm set where arms in the first arm set and the second arm set includes a first end pivotally attached to either the first medial side or the second medial side respectively.

### Claim 20

A drill rig, comprising:
a first box substructure with a first box frame including a first medial side oriented towards a second box substructure with a second box frame including a second medial side oriented towards the first box substructure;
the first box substructure being spaced apart from the second box substructure an overall distance;
a first trolley structure connected to the first box frame and protruding towards the second box substructure to a first partial distance;
a second trolley structure connected to the second box frame and protruding towards the first box substructure to a second partial distance;
the first trolley structure includes a first arm set and the second trolley structure includes a second arm set where arms in the first arm set and the second arm set include a first end pivotally attached to either the first medial side or the second medial side respectively;
the arms of the first arm set include a second end pivotally attached to a first trolley beam, and the arms of the second arm set include the second end pivotally attached to a second trolley beam;
the first trolley structure comprises a first transport position where the first arm set is aligned with the first medial side of the first box frame and the second trolley structure comprises a second transport position where the second arm set is aligned with the second medial side of the second box frame;
the first trolley structure comprises a first operating position where the first arm set is transverse to the first medial side of the first box frame, and the second trolley structure comprises a second operating position where the second arm set is transverse to the second medial side of the second box frame;
a first track formed in the first trolley beam that is aligned with the first medial side of the first box frame and a second track formed in the second trolley beam that is aligned with the second medial side of the second box frame;
wherein the first partial distance and the second partial distance are each less than the overall distance, and the first trolley structure is independent of the second trolley structure.