# US 2016/0255566 A1 · Transmission capacity negotiation between base stations in the event of a failed interface to core network for wireless networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0255566 A1
- Document ID: US20160255566A1
- Status: Published application
- Kind: A1
- Application number: 15/028,211
- Filed: 2013-10-10
- Published: 2016-09-01
- Earliest claimed: 2013-10-10
- Assignees: Nokia Solutions and Networks Oy
- Applicants: Nokia Solutions and Networks Oy
- Inventors: Henri Markus KOSKINEN
- Web page: https://patentgrep.com/patent/US20160255566A1

## CPC

- H04W 16/04: Traffic adaptive resource partitioning
- H04W 28/0257: {the individual bearer or channel having a maximum bit rate or a bit rate guarantee}
- H04W 36/0061: {of neighbour cell information}
- H04W 36/06: Reselecting a communication resource in the serving access point
- H04W 36/385: {of the core network}
- H04W 16/10: Dynamic resource partitioning
- H04W 24/04: Arrangements for maintaining operational condition
- H04W 92/20: between access points
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A technique is provided for sending, by a first base station (BS), a data rate test notification to one or more neighbor BSs, performing, by the first BS, a data rate test between the first BS and the core network, receiving, by the first BS, a data rate reply message from one or more neighbor BSs indicating whether or not the data rate test caused a decrease in the data rate available to the neighbor BS, and reducing, by the first BS, an amount of resources available to the first BS for allocation to one or more bearers if one or more of the data rate reply messages indicate that the data rate test caused a decrease in the data rate available to the neighbor BS.

## Claims

### Claim 1

A method comprising:
sending, by a first base station (BS), a data rate test notification to one or more neighbor BSs;
performing, by the first BS, a data rate test between the first BS and the core network;
receiving, by the first BS, a data rate reply message from one or more neighbor BSs indicating whether or not the data rate test caused a decrease in the data rate available to the neighbor BS; and
reducing, by the first BS, an amount of resources available to the first BS for allocation to one or more bearers if one or more of the data rate reply messages indicate that the data rate test caused a decrease in the data rate available to the neighbor BS.

### Claim 2 (depends on 1)

The method of claim 1 wherein the sending comprises sending, by a first base station (BS), a data rate test notification to one or more neighbor BSs in response to detecting a re-establishment of a failed interface between the first BS and a core network (first BS-core network interface).

### Claim 3 (depends on 1)

The method of claim 1 wherein the data rate test notification identifies a time period for the data rate test to be performed.

### Claim 4

(canceled)

### Claim 5 (depends on 2)

The method of claim 2 wherein the re-established first B S-core network interface is re-established over a physical path that shares one or more network resources with an interface between a second BS and the core network, the neighbor BSs including the second BS.

### Claim 6 (depends on 2)

The method of claim 2 wherein the re-established first BS-core network interface is re-established over a physical path which shares one or more network resources with an interface between the first BS and a second BS, the neighbor BSs including the second BS.

### Claim 7 (depends on 2)

The method of claim 2 wherein the sending, by a first base station (BS), a data rate test notification comprises:
detecting, by a first base station (B S), a failure of the first B S-core network interface;
determining that the failed first BS-core network interface has been re-established, the re-established first B S-core network interface being re-established over a physical path that shares one or more network resources with an interface between a second BS and the core network, the neighbor BSs including the second BS; and
sending, by the first BS, the data rate test notification to the one or more neighbor BSs in response to the determining that the first BS-core network interface has been re-established.

### Claim 8 (depends on 1)

The method of claim 1 wherein the data rate reply message from one or more neighbor BSs includes a data rate reduction field that indicates a data rate that should be subtracted from the amount of resources available to the first BS to allocate to one or more bearers.

### Claim 9 (depends on 1)

The method of claim 1 and further comprising sending, by the first BS to one or more neighbor BSs, a data rate test results message to report the results of the data rate test, wherein the data rate test is performed by the first BS between the sending of the one or more data rate test notifications and the sending of the data rate test results report.

### Claim 10 (depends on 1)

The method of claim 1 and further comprising sending, by the first BS to one or more neighbor BSs, a data rate test results message to report the results of the data rate test, wherein the data rate reply message from one or more neighbor BSs includes an allocated data rate for the first BS to allocate to guaranteed bit rate (GBR) bearers, the allocated data rate including at least one of:
a first data rate indicated in the data rate test results message that identifies a data rate detected for the data rate test performed between the first BS and the core network if the data rate test did not cause a decrease in the data rate available to the neighbor BS; or
a second data rate that is less than the data rate indicated in the data rate test results message if the data rate test caused a decrease in the data rate available to the neighbor BS.

### Claim 11 (depends on 10)

The method of claim 10 wherein the second data rate is based on the first data rate indicated in the data rate test result report and the data rate decrease observed by the neighbor BS during the data rate test.

### Claim 12

(canceled)

### Claim 13

An apparatus comprising at least one processor and at least one memory including computer instructions, when executed by the at least one processor, cause the apparatus to:
send, by a first base station (BS), a data rate test notification to one or more neighbor BSs;
perform, by the first BS, a data rate test between the first BS and the core network;
receive, by the first BS, a data rate reply message from one or more neighbor BSs indicating whether or not the data rate test caused a decrease in the data rate available to the neighbor BS; and
reduce, by the first BS, an amount of resources available to the first BS for allocation to one or more bearers if one or more of the data rate reply messages indicate that the data rate test caused a decrease in the data rate available to the neighbor BS.

### Claim 14

(canceled)

### Claim 15 (depends on 1)

A computer program product, the computer program product comprising a non-transitory computer-readable storage medium and storing executable code that, when executed by at least one data processing apparatus, is configured to cause the at least one data processing apparatus to perform a method of claim 1.

### Claim 16

A method comprising:
receiving, by a second base station (BS), a data rate test notification from a first BS indicating that a data rate test will be performed between the first BS and a core network;
determining, by the second BS, whether the data rate test performed by the first BS caused a decrease in a data rate available for allocation by the second BS; and
sending, by the second BS, a data rate reply message to the first BS indicating whether or not the data rate test caused a decrease in the data rate available to the second BS.

### Claim 17 (depends on 16)

The method of claim 16 wherein the receiving comprises receiving, by a second base station (BS), a data rate test notification from a first BS indicating that a data rate test will be performed over an interface between the first BS and a core network, wherein a physical path of the interface between the first BS and the core network shares one or more network resources with a physical path for an interface between the second BS and the core network

### Claim 18 (depends on 16)

The method of claim 16 and further comprising receiving, by the second BS, a data rate test results message to the first BS.

### Claim 19 (depends on 16)

The method of claim 16 wherein the data rate reply message comprises a data rate reduction field that indicates a data rate that should be subtracted from an amount of resources available to the first BS for allocation.

### Claim 20 (depends on 18)

The method of claim 18 wherein the data rate reply message comprises an allocated or suggested data rate for the first BS to allocate to guaranteed bit rate (GBR) bearers, the allocated or suggested data rate including at least one of:
a first data rate indicated in the data rate test results message that identifies a data rate detected for the data rate test performed between the first BS and the core network if the data rate test did not cause a decrease in the data rate available to the second BS; or
a second data rate that is less than the data rate indicated in the data rate test results message if the data rate test caused a decrease in the data rate available to the second BS.

### Claim 21 (depends on 16)

The method of claim 16 wherein the sending, by the second BS, a data rate reply message comprises:
comparing a data rate available at the second BS before the data rate test to a data rate available at the second BS during the data rate test;
determining whether or not the data rate test caused a decrease in the data rate available to the second BS; and
sending, by the second BS, a data rate reply message to the first BS indicating whether or not the data rate test caused a decrease in the data rate available to the second BS.

### Claim 22

An apparatus comprising at least one processor and at least one memory including computer instructions, when executed by the at least one processor, cause the apparatus to:
receive, by a second base station (BS), a data rate test notification from a first BS indicating that a data rate test will be performed between the first BS and a core network;
determine, by the second BS, whether the data rate test performed by the first BS caused a decrease in a data rate available for allocation by the second BS; and
send, by the second BS, a data rate reply message to the first BS indicating whether or not the data rate test caused a decrease in the data rate available to the second BS.

### Claim 23 (depends on 16)

A computer program product, the computer program product comprising a non-transitory computer-readable storage medium and storing executable code that, when executed by at least one data processing apparatus, is configured to cause the at least one data processing apparatus to perform a method of claim 16.
