# US 2016/0253208 A1 · Resource-based job scheduling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0253208 A1
- Document ID: US20160253208A1
- Status: Published application
- Kind: A1
- Application number: 14/632,494
- Filed: 2015-02-26
- Published: 2016-09-01
- Earliest claimed: 2015-02-26
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Aruun K. Kumar; David C. Reed; Max D. Smith
- Web page: https://patentgrep.com/patent/US20160253208A1

## CPC

- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 11/0751: {Error or fault detection not based on redundancy (power supply failures G06F1/30; network fault management H04L41/06)}
- G06F 11/1402: {Saving, restoring, recovering or retrying}
- G06F 11/3409: {for performance assessment}
- G06F 11/3476: {Data logging (G06F11/14, G06F11/2205 take precedence)}
- G06F 2209/485: Resource constraint
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Resource-based optimization is used to resolve some abnormal job terminations. An abnormal job termination is analyzed to determine if a resource shortage caused the termination. For a resource-dependent termination, the job is rescheduled for a time when sufficient resources are available.

## Claims

### Claim 1

A method comprising:
determining a type of an abnormal termination of a job;
collecting resource usage data;
analyzing resource availability, based at least in part on the resource usage data, to generate a resource availability analysis; and
responsive to a determination that the type is environmental, taking a rescheduling action, based at least in part on the resource availability analysis;
wherein:
at least the determining step is performed by computer software running on computer hardware.

### Claim 2 (depends on 1)

The method of claim 1, wherein the rescheduling action includes:
scheduling a new runtime for the job.

### Claim 3 (depends on 2)

The method of claim 2, wherein the new runtime is a best time based, at least in part, on the resource usage data and the resource availability analysis.

### Claim 4 (depends on 1)

The method of claim 1, wherein the rescheduling action is automatically processed.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
transmitting a message to a user describing the rescheduling action.

### Claim 6 (depends on 1)

The method of claim 1, wherein the resource usage data includes a set of prior rescheduling actions.

### Claim 7 (depends on 1)

The method of claim 1, wherein the abnormal termination is a secondary abnormal termination.

### Claim 8

A computer program product comprising a computer readable storage medium having stored thereon:
first program instructions programmed to determine a type of an abnormal termination of a job;
second program instructions programmed to collect resource usage data;
third program instructions programmed to analyze resource availability, based at least in part on the resource usage data, to generate a resource availability analysis; and
fourth program instructions programmed, responsive to a determination that the type is environmental, to take a rescheduling action, based at least in part on the resource availability analysis.

### Claim 9 (depends on 8)

The computer program product of claim 8, wherein the rescheduling action includes:
fifth program instructions programmed to schedule a new runtime for the job.

### Claim 10 (depends on 9)

The computer program product of claim 9, wherein the new runtime is a best time based, at least in part, on the resource usage data and the resource availability analysis.

### Claim 11 (depends on 8)

The computer program product of claim 8, wherein the rescheduling action is automatically processed.

### Claim 12 (depends on 8)

The computer program product of claim 8, further comprising:
fifth program instructions programmed to transmit a message to a user describing the rescheduling action.

### Claim 13 (depends on 8)

The computer program product of claim 8, wherein the resource usage data includes a set of prior rescheduling actions.

### Claim 14

A computer system comprising:
a processor set; and
a computer readable storage medium;
wherein:
the processor set is structured, located, connected, and/or programmed to run program instructions stored on the computer readable storage medium; and
the program instructions include:
first program instructions programmed to determine a type of an abnormal termination of a job;
second program instructions programmed to collect resource usage data;
third program instructions programmed to analyze resource availability, based at least in part on the resource usage data, to generate a resource availability analysis; and
fourth program instructions programmed, responsive to a determination that the type is environmental, to take a rescheduling action, based at least in part on the resource availability analysis.

### Claim 15 (depends on 14)

The computer system of claim 14, wherein the rescheduling action includes:
fifth program instructions programmed to schedule a new runtime for the job.

### Claim 16 (depends on 15)

The computer system of claim 15, wherein the new runtime is a best time based, at least in part, on the resource usage data and the resource availability analysis.

### Claim 17 (depends on 14)

The computer system of claim 14, wherein the rescheduling action is automatically processed.

### Claim 18 (depends on 14)

The computer system of claim 14, further comprising:
fifth program instructions programmed to transmit a message to a user describing the rescheduling action.

### Claim 19 (depends on 14)

The computer system of claim 14, wherein the resource usage data includes a set of prior rescheduling actions.

### Claim 20 (depends on 14)

The computer system of claim 14, wherein the abnormal termination is a secondary abnormal termination.