# US 2016/0252468 A1 · Detecting Gaps Between Fasteners and Openings

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0252468 A1
- Document ID: US20160252468A1
- Status: Published application
- Kind: A1
- Application number: 14/633,379
- Filed: 2015-02-27
- Published: 2016-09-01
- Earliest claimed: 2015-02-27
- Assignees: The Boeing Company
- Applicants: The Boeing Company
- Inventors: Taisia Tsukruk Lou; William Talion Edwards; Gergory Paul Saguto
- Web page: https://patentgrep.com/patent/US20160252468A1

## CPC

- G01N 23/203: Measuring back scattering
- G01N 2223/053: back scatter
- G01N 2223/3037: standards (constitution)
- G01N 2223/629: welds, bonds, sealing compounds
- G01N 2223/631: large structures, walls
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)

## Abstract

A method and apparatus are presented. X-rays are directed at a workpiece. The workpiece includes a fastener installed in an opening. Backscatter is received from the workpiece. It is determined if the fastener installed in the opening has an out of tolerance gap using the backscatter. An output is generated if the fastener installed in the opening has the out of tolerance gap.

## Claims

### Claim 1

A method comprising:
directing x-rays at a workpiece, the workpiece including a fastener installed in an opening;
receiving backscatter from the workpiece;
determining if the fastener installed in the opening has an out of tolerance gap using the backscatter; and
generating an output if the fastener installed in the opening has the out of tolerance gap.

### Claim 2 (depends on 1)

The method of claim 1, wherein determining if the fastener installed in the opening has the out of tolerance gap using the backscatter comprises:
creating a plot profile for a location through the fastener using the backscatter;
determining a lowest value in a valley of the plot profile; and
determining if the fastener installed in the opening has the out of tolerance gap using the lowest value in the valley of the plot profile.

### Claim 3 (depends on 2)

The method of claim 2, wherein determining if the fastener installed in the opening has the out of tolerance gap using the lowest value in the valley of the plot profile comprises:
calculating a difference between the lowest value and a background;
determining if the difference is above a limit; and
determining that the fastener installed in the opening has the out of tolerance gap if the difference is above the limit.

### Claim 4 (depends on 2)

The method of claim 2, wherein determining if the fastener installed in the opening has the out of tolerance gap using the lowest value in the valley of the plot profile comprises:
calculating a difference between the lowest value and a background;
determining a ratio value between the difference and the background;
determining an estimated gap using the ratio value; and
determining if the estimated gap is an acceptable size to determine if the fastener installed in the opening has the out of tolerance gap.

### Claim 5 (depends on 4)

The method of claim 4, wherein the background is generated from a standard having a same material layup as the workpiece.

### Claim 6 (depends on 4)

The method of claim 4, wherein the background is a value determined from backscatter from an area of the workpiece not containing the fastener installed in the opening.

### Claim 7 (depends on 2)

The method of claim 2, wherein determining if the fastener installed in the opening has the out of tolerance gap using the lowest value in the valley of the plot profile comprises:
determining if the lowest value in the valley of the plot profile is below a limit; and
determining that the fastener installed in the opening has the out of tolerance gap if the lowest value is below the limit.

### Claim 8 (depends on 7)

The method of claim 7, wherein the limit is set based on a standard having a same material layup as the workpiece.

### Claim 9 (depends on 2)

The method of claim 2 further comprising:
forming an image of the fastener installed in the opening using the backscatter; and
wherein creating the plot profile for the location through the fastener comprises creating the plot profile for the location through the fastener in the image.

### Claim 10 (depends on 9)

The method of claim 9, wherein forming the image of the fastener installed in the opening comprises:
forming a raw data image with contrast adjustment; and
performing a simple bandpass filter on the raw data image to form the image.

### Claim 11 (depends on 10)

The method of claim 10, wherein creating the plot profile for the location through the fastener using the backscatter comprises:
creating the plot profile for the location through the fastener using the image.

### Claim 12 (depends on 1)

The method of claim 1 further comprising:
inspecting a standard to form standardized data, wherein determining if the fastener installed in the opening has the out of tolerance gap also uses the standardized data.

### Claim 13 (depends on 12)

The method of claim 12, wherein the standard has a number of out of tolerance gaps and further comprising:
creating a ratio to gap size equation based on the standardized data.

### Claim 14 (depends on 1)

The method of claim 1, wherein directing the x-rays at the workpiece includes directing the x-rays at a first side of the workpiece, and wherein receiving the backscatter from the workpiece includes receiving the backscatter on the first side of the workpiece.

### Claim 15

A method comprising:
directing x-rays at a workpiece, the workpiece including a fastener installed in an opening;
receiving backscatter from the workpiece; and
determining an estimated gap associated with the fastener in the opening using the backscatter.

### Claim 16 (depends on 15)

The method of claim 15, wherein determining the estimated gap comprises:
creating a plot profile for a location through the fastener using the backscatter.

### Claim 17 (depends on 16)

The method of claim 16, wherein determining the estimated gap further comprises:
determining a lowest value in a valley of the plot profile;
determining a difference between the lowest value and a background;
determining a ratio value between the difference and the background; and
determining the estimated gap using the ratio value.

### Claim 18

An apparatus comprising:
x-ray inspection equipment having an x-ray generation system for directing x-rays at a workpiece, the workpiece including a fastener installed in an opening and a detector system for receiving backscatter from the workpiece; and
a processor unit for determining if the fastener installed in the opening has an out of tolerance gap using the backscatter, and generating an output if the fastener installed in the opening has the out of tolerance gap.

### Claim 19 (depends on 18)

The apparatus of claim 18, wherein in determining if the fastener installed in the opening has the out of tolerance gap using the backscatter, the processor unit creates a plot profile for a location through the fastener using the backscatter; determines a lowest value in a valley of the plot profile; and determines if the fastener installed in the opening has the out of tolerance gap using the lowest value in the valley of the plot profile.

### Claim 20 (depends on 19)

The apparatus of claim 19, wherein in determining if the fastener installed in the opening has the out of tolerance gap using the lowest value in the valley of the plot profile, the processor unit calculates a difference between the lowest value and a background; determines a ratio value between the difference and the background; determines an estimated gap using the ratio value; and determines if the estimated gap is an acceptable size to determine if the fastener installed in the opening has the out of tolerance gap.
