# US 2016/0252195 A1 · Marine pipelaying and method for abandonment of a pipeline

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0252195 A1
- Document ID: US20160252195A1
- Status: Published application
- Kind: A1
- Application number: 15/030,829
- Filed: 2014-10-16
- Published: 2016-09-01
- Earliest claimed: 2013-11-06
- Assignees: Itrec B.V.
- Applicants: Itrec B.V.
- Inventors: Joop ROODENBURG; Terence Willem August VEHMEIJER
- Web page: https://patentgrep.com/patent/US20160252195A1

## CPC

- F16L 1/205: {Pipe-laying ships (F16L1/225, F16L1/23 and F16L1/235 take precedence)}
- F16L 1/16: on the bottom
- F16L 1/207: {Pipe handling apparatus}
- F16L 1/23: Pipe tensioning apparatus
- F16L 1/235: Apparatus for controlling the pipe during laying
- F16L 3/012: {using reels}
- F16L 3/1218: {the pipe being only supported and not fixed}
- F16L 3/1222: {the member having the form of a closed ring, e.g. used for the function of two adjacent pipe sections}
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL

## Abstract

A method is provided for installing a pipeline on the seabed from a marine pipelaying vessel, including initiation, pipelaying, and abandonment of the pipeline. An embodiment of the abandonment of the pipeline includes halting pipelaying and engaging a hang-off clamp with the pipeline at a position below one or more tensioners, transferring the weight onto the hang-off clamp and holding the seagoing pipeline in the firing line, severing the pipeline, connecting the initiation cable to the lower end of the pipeline held by the one or more tensioners, transferring pipeline tension onto the initiation cable, releasing the one or more tensioners, so that a section of the pipeline is held in the firing line between the pipeline diverter and the initiation cable, vacating the firing line by at least displacing both the pipeline diverter and the initiation cable sheave and thereby displacing said section of the pipeline from the firing line, arranging the A&R cable in the firing line, connecting the A&R cable to the upper end of the seagoing pipeline held in the firing line, releasing the hang-off clamp, and operating the A&R winch and thereby lowering the pipeline onto the seabed.

## Claims

### Claim 1

A method for installing a pipeline on the seabed from a marine pipelaying vessel, said method comprising pipelaying and abandonment of said pipeline, wherein use is made of a marine pipelaying vessel comprising:
a pipeline launch tower;
a pipeline diverter which is supported at an elevated position on the pipeline launch tower;
one or more tensioners supported by the pipeline launch tower below the pipeline diverter;
an A & R system for abandonment and recovery of a pipeline, said A&R system comprising:
an A&R winch and A&R cable, and
an A&R cable suspension sheave; and
a hang-off clamp;
wherein the pipelaying comprises:
lowering a seagoing pipeline along a firing line into the sea by means of the one or more tensioners, said one or more tensioners engaging on the pipeline as so to support the weight of the seagoing pipeline,
wherein the abandonment of the pipeline comprises:
halting the pipelaying and engaging the hang-off clamp with the pipeline at a position below the one or more tensioners;
transferring the weight of the seagoing pipeline onto the hang-off clamp and holding the seagoing pipeline in the firing line by means of the hang-off clamp;
severing the pipeline between the hang-off clamp and the one or more tensioners;
connecting an auxiliary tensioning device to a lower end of the pipeline held by the one or more tensioners;
transferring pipeline tension from the one or more tensioners onto the auxiliary tensioning, device;
releasing the one or more tensioners from the pipeline, so that a section of the pipeline is held in the firing line between the pipeline diverter and the auxiliary tensioning device;
vacating the firing line by at least displacing both the pipeline diverter and the auxiliary tensioning device and thereby displacing said section of the pipeline from the firing line;
arranging the A&R cable in the firing line vacated by said section of the pipeline;
connecting the A&R cable to an upper end of the seagoing pipeline held by the hang-off clamp in the firing line;
transferring the weight of the seagoing pipeline from the hang-off clamp onto the A&R cable;
releasing the hang-off clamp from the seagoing pipeline; and
operating the A&R winch and thereby lowering the seagoing pipeline onto a seabed.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the auxiliary tensioning device comprises an auxiliary winch, an auxiliary tensioning cable, and auxiliary tensioning cable sheave, wherein the method comprises moving said auxiliary tensioning cable sheave between an active position aligned with the firing line and a retracted position remote from the firing line in order to vacate the firing line.

### Claim 3 (depends on 2)

The method according to claim 2, wherein said auxiliary tensioning device is an initiation system for initiation of pipelaying, said initiation system comprising an initiation winch, an initiation cable, and an initiation cable sheave, wherein the method comprises moving said initiation cable sheave between an active position aligned with the firing line and a retracted position remote from the firing line in order to vacate the firing line.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the step of severing the pipeline between the hang-off clamp and the one or more tensioners comprises making several cuts at different heights in the pipeline and thereby removing a pipeline part between the lower end of the pipeline held by the one or more tensioners an upper end of the seagoing pipeline held by the hang-off clamp, and wherein the initiation cable sheave is moved into the space vacated by the removed pipeline part and into a position underneath the lower end of the pipeline held by the one or more tensioners.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the A&R cable is provided with a connector, said connector being held near the A&R cable suspension sheave during pipelaying,
wherein the marine pipelaying vessel comprises a tugger system that is adapted to pull the A&R cable down to an upper end of the seagoing pipeline, said tugger system comprising:
a tugger winch (70) and tugger cable; and
a tugger cable sheave, and
wherein, after the step of vacating the firing line, the tugger cable is passed upward from the tugger cable sheave adjacent the upper end of the seagoing pipeline along the firing line to the A&R cable connector, the A&R cable connector then being pulled downward towards the upper end of the seagoing pipeline and connected there to.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the tower is further provided with a straightener assembly including one or more straightener tracks that straighten the pipeline as the pipeline exits the pipeline diverter during pipelaying.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the tower is provided with one or more centralizers each forming an eye that can be opened and closed and that is adapted to maintain a cable or a pipeline centralized in the firing line, and
wherein the step of vacating the firing line is preceded by opening the eye of one or more centralizers so as to allow the displacement of the pipeline section in said vacating step.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the marine pipelaying vessel further comprises:
a horizontal pipeline assembly line with one or more pipe connecting stations, and
wherein the pipelaying involves connecting, pipes end to end to form the pipeline to be laid, said pipeline being passed directly via a pipeline feed trajectory to the pipeline diverter on the tower.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the pipeline assembly line has an assembly direction for the pipeline that is directed away from the tower, and wherein the marine pipelaying vessel further comprises an assembly line diverter that diverts the pipeline upward and to the pipeline diverter on the tower.

### Claim 10 (depends on 9)

The method according to claim 9, wherein the step of vacating the firing line further comprises displacing the assembly line diverter and displacing any pipeline present in the assembly line in a manner so as to maintain a constant distance between the assembly line diverter and the pipeline diverter on the tower.

### Claim 11 (depends on 8)

The method according to claim 8, wherein the assembly line comprises an assembly line tensioner engaging on the pipeline near the end of the assembly line allowing to tension the pipeline between said assembly line tensioner and the one or more tensioners on the tower during pipelaying and between said assembly line tensioner and the auxiliary tensioning device in the course of the abandonment of the pipeline.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the one or more tensioners on the tower each comprise a tensioner frame and multiple tracks supported by the tensioner frame, said tracks engaging on the pipeline during pipelaying, and wherein each tensioner frame is displaceable mounted on the tower so as to be movable between an active position wherein the tracks can engage on the pipeline during pipelaying and a retracted, non-operative position wherein the tensioner frame is remote from the firing line, and wherein the step of vacating the firing line comprises the displacement of the one or more tensioners on the tower into their retracted, non-operative position.

### Claim 13

A marine pipelaying installation to be mounted or mounted on a vessel for laying a pipeline on the seabed, wherein the marine pipelaying installation comprises:
a pipeline launch tower;
a pipeline diverter which is supported at an elevated position on the tower;
one or more tensioners supported by the tower below the pipeline diverter;
an A & R system for abandonment and recovery of a pipeline, said A&R system comprising:
an A&R winch (50) and A&R cable; and
an A&R cable suspension sheave that is displaceable mounted on the tower;
an auxiliary tensioning device; and
a hang-off clamp,
wherein the pipeline diverter is displaceable mounted on the tower, and wherein a pipeline diverter displacement actuator is provided allowing to displace the pipeline diverter between an active position wherein a pipeline passing over the pipeline diverter exits said pipeline diverter in the firing line and a retracted position wherein the pipeline diverter is remote from the firing line,
wherein the auxiliary tensioning device is displaceable mounted, preferably on the tower, and wherein auxiliary tensioning device displacement actuator is provided allowing to displace the auxiliary tensioning device between an active position aligned with the firing line and a retracted position remote from the firing line,
wherein the installation further comprises a controller that is adapted to control the operation of at least the pipeline diverter displacement actuator and the auxiliary tensioning device displacement actuator, and
wherein said controller is adapted to provide retraction signals on the basis of which the pipeline diverter displacement actuator and the auxiliary tensioning device displacement actuator perform a retraction that vacates a pipeline section held between the auxiliary tensioning device and the pipeline diverter from the firing line.

### Claim 14 (depends on 13)

The installation according to claim 13, wherein the auxiliary tensioning device comprises an auxiliary winch, an auxiliary tensioning cable, and auxiliary tensioning cable sheave, wherein the auxiliary tensioning cable sheave is movable between an active position aligned with the firing line and a retracted position remote from the firing line in order to vacate the firing line.

### Claim 15 (depends on 14)

The installation according to claim 14, wherein said auxiliary tensioning device is an initiation system for initiation of pipelaying, said initiation system comprising an initiation winch, an initiation cable, and an initiation cable sheave, wherein the initiation cable sheave is movable between an active position aligned with the firing line and a retracted position remote from the firing line in order to vacate the firing line.

### Claim 16 (depends on 13)

The installation according to claim 13, wherein the installation further comprises:
a horizontal pipeline assembly line with one or more pipe connecting stations, allowing to connect pipes end to end to form the pipeline to be laid during pipelaying, the pipeline passing from the assembly line directly via a pipeline feed trajectory to the pipeline diverter on the tower.

### Claim 17 (depends on 16)

The installation according to claim 16, wherein the pipeline assembly line has an assembly direction for the pipeline that is directed away from the tower, and wherein the installation further comprises an assembly line diverter that diverts the pipeline upward and to the pipeline diverter on the tower.

### Claim 18 (depends on 17)

The installation according to claim 17, wherein the assembly line diverter is displaceable and wherein an assembly line diverter actuator is provided to displace the assembly line diverter, and wherein the controller is adapted to provide a retraction signal on the basis of which the assembly line diverter actuator performs a retraction in unison with the retraction of the pipeline diverter and of the initiation cable sheave, allowing to maintain a constant distance between the assembly line diverter and the pipeline diverter on the tower during the step of vacating the firing line.

### Claim 19 (depends on 13)

The installation according to claim 13, wherein the A&R cable is provided with a connector, said connector being held near the A&R cable suspension sheave during pipelaying,
wherein the installation further comprises a tugger system adapted to forward the A&R cable an upper end of the seagoing pipeline held by the hang-off clamp in the course of abandonment of the pipeline, said tugger system comprising:
a tugger winch and tugger a cable; and
a tugger cable sheave, and
wherein, after the step of vacating the firing line, the tugger cable is passable upward from the tugger cable sheave adjacent the upper end of the seagoing pipeline along the firing line to the A&R cable connector, such that the A&R cable connector can be pulled downward towards the upper end of the seagoing pipeline and connected there to.

### Claim 20 (depends on 13)

A marine pipelaying vessel provided with the installation according to claim 13.
