# US 2016/0251865 A1 · Method for improving the structural stability of an existing building construction

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0251865 A1
- Document ID: US20160251865A1
- Status: Published application
- Kind: A1
- Application number: 15/032,893
- Filed: 2014-10-31
- Published: 2016-09-01
- Earliest claimed: 2013-10-31
- Inventors: Mario MARTINA; Enzo MORELLI; Michele MICELI
- Web page: https://patentgrep.com/patent/US20160251865A1

## CPC

- E04G 23/0218: {Increasing or restoring the load-bearing capacity of building construction elements (E04G23/0203 and E04G23/0266 take precedence)}
- E04B 1/92: Protection against other undesired influences or dangers (buildings providing protection against external dangers E04H9/00; shielding against dangerous radiation G21F)
- E04C 3/34: of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings (E04C3/36 takes precedence)
- E04C 3/36: of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials
- E04C 5/0604: {Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods (E04C5/0631 takes precedence)}
- E04C 5/125: {the tensile members are profiled to ensure the anchorage, e.g. when provided with screw-thread, bulges, corrugations}
- E04G 23/0211: {using injection}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)

## Abstract

The present invention relates to a method for improving considerably the structural stability of a building construction of already existing reinforced concrete (for example building constructions, schools, hospitals, bridges, etc.).

## Claims

### Claim 1

A method for improving the structural stability of an existing building construction of reinforced concrete having one or more pillars and one or more beams comprising the following steps:
a) performing a first horizontal drilling according to a cross direction to said pillar so as to involve the beam insisting on said respective pillar;
b) inserting a first reinforcement in said first drilling;
c) casting cementitious filling material, in particular fluidized expanding mortar, inside said first drilling;
d) performing a second vertical drilling in substantially central position and along the longitudinal axis of said one or more pillars;
e) inserting a second reinforcement in said vertical drilling having a plurality of openings apt to make a cementitious filling material to flow from inside towards outside of said second reinforcement.
f) casting said cementitious filling material, in particular fluidized expanding mortar, inside said second reinforcement until the complete filling-up of said second drilling.

### Claim 2 (depends on 1)

The method according to claim 1 wherein said second reinforcement comprises a metal pipe or a metal cage.

### Claim 3 (depends on 1)

The method according to claim 1, wherein said horizontal and vertical drillings are performed with continuous core boring at the centre of the section of said one or more pillars and said one or more beams.

### Claim 4 (depends on 1)

The method according to claim 1, wherein said second drilling is performed for the whole longitudinal size of said one or more pillars.

### Claim 5 (depends on 1)

The method according to claim 1 wherein said second reinforcement is inserted for the whole longitudinal size of said first drilling.

### Claim 6 (depends on 1)

The method according to claim 1 wherein said openings are distributed along the entire first reinforcement, preferably arranged staggered to each other.

### Claim 7 (depends on 1)

The method according to claim 1, wherein said first reinforcement comprises a threaded bar, an iron bar or a metal tube.

### Claim 8 (depends on 1)

The method according to claim 1, wherein said first reinforcement is inserted for the whole longitudinal size of said beam.

### Claim 9 (depends on 1)

The method according to claim 1, wherein a drawing of said beam to said pillar is performed by fastening means placed at the head of said beam.

### Claim 10 (depends on 1)

The method according to claim 1 wherein said one or more pillars are an intermediate peripheral pillar and/or a corner peripheral pillar and/or an internal pillar.

### Claim 11 (depends on 1)

The method according to claim 1 wherein in the step a) one or more horizontal drillings are performed, so as to involve said beams positioned at the structural nodes of said construction.

### Claim 12

A building construction of reinforced concrete having one or more pillars and one or more beams insisting on a respective pillar, wherein said one or more beams comprise a first horizontal reinforcement for the whole longitudinal axis of said beam and wherein said one or more pillars comprise in substantially central position and for the whole longitudinal axis of said pillar a second vertical reinforcement, and wherein said second vertical reinforcement has a plurality of openings apt to drain off a cementitious filling material, in particular expanding mortar, from the inside di said reinforcement to the outside of said reinforcement and wherein said second reinforcement is filled with said cementitious material.

### Claim 13 (depends on 12)

The building construction according to claim 12 wherein said first reinforcement comprises pre-stressed strands or a threaded bar with a diameter of at least 20 mm.

### Claim 14 (depends on 12)

The building construction according to claim 12 wherein said second reinforcement comprises a metal pipe or a metal cage.

### Claim 15 (depends on 12)

The building construction according to claim 12 comprising fastening means.

### Claim 16 (depends on 15)

The building construction according to claim 15 wherein said fastening means comprises a nut and a metal plate screwed so that said beam are drawn to the pillar.

### Claim 17 (depends on 12)

The building construction according to claim 12 wherein said one or more pillars are an intermediate peripheral pillar and/or a corner peripheral pillar and/or an internal pillar.

### Claim 18 (depends on 12)

The building construction according to claim 12 wherein said second vertical reinforcement is extended into the subsoil below the foundations of said pillar.

### Claim 19 (depends on 12)

The building construction according to claim 12 wherein said second vertical reinforcement is extended into the subsoil below the foundations of said pillar.

### Claim 20 (depends on 19)

The building construction according to claim 19 wherein said second vertical reinforcement is extended into the subsoil for at least 70 cm to the foot of the pillar and for at least 70 at the head of said pillar.

### Claim 21 (depends on 12)

The building construction according to claim 12 wherein said beam inserted in said first vertical reinforcement is a flooring beam with bearing or connecting thickness.

### Claim 22 (depends on 12)

The building construction according to claim 12 wherein said beam sustains the covering flooring or inter-floor.

### Claim 23 (depends on 12)

The building construction according to claim 12 wherein said pillar comprises two, three or more vertical reinforcements.