- Number: US 2016/0251856 A1
- Document ID: US20160251856A1
- Status: Published application
- Kind: A1
- Application number: 15/030,074
- Filed: 2013-11-27
- Published: 2016-09-01
- Earliest claimed: 2013-11-04
- Assignees: Samsung C&T Corporation
- Applicants: Samsung C&T Corporation
- Inventors: Tae Hoon KIM
- Web page: https://patentgrep.com/patent/US20160251856A1

## CPC

- E04C 3/34: of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings (E04C3/36 takes precedence)
- E01D 19/02: Piers {(E01D19/005 takes precedence; towers for suspension bridges E01D19/14)}; Abutments (foundations E02D ){; Protecting same against drifting ice (against colliding vehicles E01F15/00)}
- E04C 5/06: of high bending resistance, i.e. of essentially three-dimensional [3D] extent, e.g. lattice girders {(anchorage devices specially adapted for balconies E04B1/0038; supporting devices for connector reinforcing rods for concrete walls E04G21/125)}
- E04C 5/0604: {Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods (E04C5/0631 takes precedence)}
- E04C 5/0627: {Three-dimensional reinforcements composed of a prefabricated reinforcing mat combined with reinforcing elements protruding out of the plane of the mat (E04C5/0645 takes precedence)}
- E04G 21/02: Conveying or working-up concrete or similar masses able to be heaped or cast (in connection with finishing work E04F; construction and surfacing of floorings made of similar material to roads or pavements E01C; in connection with barrages E02B7/00; in connection with foundations E02D15/00; composition of concrete C04B; working concrete in general, e.g. mixing machines B28C)
- E04G 21/125: {Reinforcement continuity box}
- E04G 21/142: {Means in or on the elements for connecting same to handling apparatus (E04B1/38 takes precedence)}
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

A solid reinforced concrete column and a method of constructing the same are disclosed. The solid reinforced concrete column includes outer main reinforcing bars, inner reinforcing bars, inner transverse reinforcing bars, outer transverse reinforcing bars, and concrete. The outer main reinforcing bars are arranged in an axial direction. The inner reinforcing bars are each arranged to be placed between two or three of the outer main reinforcing bars inside the two or three outer main reinforcing bars in the axial direction. The inner transverse reinforcing bars are each arranged to connect the two or three outer main reinforcing bars and the inner reinforcing bar in a transverse direction. The outer transverse reinforcing bars are arranged to surround the outer main reinforcing bars outside the outer main reinforcing bars in the transverse direction. The concrete is placed to bury the reinforcing bars.

## Claims

### Claim 1

A solid reinforced concrete column, comprising:
outer main reinforcing bars arranged in an axial direction of the solid reinforced concrete column;
inner reinforcing bars each arranged to be placed between two or three of the outer main reinforcing bars inside the two or three outer main reinforcing bars in the axial direction;
inner transverse reinforcing bars each arranged to connect the two or three outer main reinforcing bars and the inner reinforcing bar, placed between the two or three outer main reinforcing bars, in a transverse direction of the solid reinforced concrete column, thereby forming each triangular reinforcing bar network;
outer transverse reinforcing bars arranged to surround the outer main reinforcing bars outside the outer main reinforcing bars in the transverse direction; and
concrete placed to bury the outer main reinforcing bars, the inner reinforcing bars, the inner transverse reinforcing bars, and the outer transverse reinforcing bars.

### Claim 2 (depends on 1)

The solid reinforced concrete column of claim 1, wherein the inner reinforcing bars are designed as column main reinforcing bars.

### Claim 3 (depends on 1)

The solid reinforced concrete column of claim 1, wherein the inner transverse reinforcing bars are implemented as one of closed strip-shaped reinforcing bars, spiral reinforcing bars, and non-closed reinforcing bars that connect the outer main reinforcing bars and the inner reinforcing bars but that do not connect the outer main reinforcing bars with each other.

### Claim 4 (depends on 1)

A method of constructing the solid reinforced concrete column of claim 1, comprising:
a first step of assembling each triangular reinforcing bar network by connecting two or three outer main reinforcing bars and a single inner reinforcing bar by inner transverse reinforcing bars;
a second step of arranging reinforcing bars by arranging a plurality of triangular reinforcing bar networks and then surrounding an outside of the plurality of triangular reinforcing bar networks with outer transverse reinforcing bars; and
a third step of placing concrete so that the reinforcing bars arranged at the second step are buried in the concrete.

### Claim 5 (depends on 4)

The method of claim 4, wherein the first step is performed by connecting the inner transverse reinforcing bars in a state in which the two or three outer main reinforcing bars and the single inner reinforcing bar are fastened to a pair of jigs.

### Claim 6 (depends on 4)

The method of claim 4, wherein the second step is performed by installing the plurality of triangular reinforcing bar networks at a location of the column, and then surrounding the plurality of triangular reinforcing bar networks with the outer transverse reinforcing bars.

### Claim 7 (depends on 4)

The method of claim 4, wherein the second step is performed by assembling a column reinforcing bar network in such a way as to arrange all triangular reinforcing bar networks, to be arranged in the square column to be constructed, and to surround the triangular reinforcing bar networks with the outer transverse reinforcing bars, and then installing the column reinforcing bar network at a location of the column in such a way as to lift the column reinforcing bar network using a crane.

### Claim 8 (depends on 4)

The method of claim 4, wherein the second step is performed by installing a plurality of triangular reinforcing bar networks, to be arranged on each side of the square column to be constructed, at a location of the column in such a way as to simultaneously hang the plurality of triangular reinforcing bar networks from a dedicated jig and to lift the plurality of triangular reinforcing bar networks using a crane, and then surrounding the triangular reinforcing bar networks with the outer transverse reinforcing bars.

### Claim 9 (depends on 4)

The method of claim 4, wherein the second step is performed by burying a guide plate, in which reinforcing bar receiving holes are formed, in an upper portion of a base part, and then installing the triangular reinforcing bar networks in such a way as to insert the outer main reinforcing bars or inner reinforcing bars into the reinforcing bar receiving holes of the guide plate.

### Claim 10 (depends on 2)

A method of constructing the solid reinforced concrete column of claim 2, comprising:
a first step of assembling each triangular reinforcing bar network by connecting two or three outer main reinforcing bars and a single inner reinforcing bar by inner transverse reinforcing bars;
a second step of arranging reinforcing bars by arranging a plurality of triangular reinforcing bar networks and then surrounding an outside of the plurality of triangular reinforcing bar networks with outer transverse reinforcing bars; and
a third step of placing concrete so that the reinforcing bars arranged at the second step are buried in the concrete.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first step is performed by connecting the inner transverse reinforcing bars in a state in which the two or three outer main reinforcing bars and the single inner reinforcing bar are fastened to a pair of jigs.

### Claim 12 (depends on 10)

The method of claim 10, wherein the second step is performed by installing the plurality of triangular reinforcing bar networks at a location of the column, and then surrounding the plurality of triangular reinforcing bar networks with the outer transverse reinforcing bars.

### Claim 13 (depends on 10)

The method of claim 10, wherein the second step is performed by assembling a column reinforcing bar network in such a way as to arrange all triangular reinforcing bar networks, to be arranged in the square column to be constructed, and to surround the triangular reinforcing bar networks with the outer transverse reinforcing bars, and then installing the column reinforcing bar network at a location of the column in such a way as to lift the column reinforcing bar network using a crane.

### Claim 14 (depends on 10)

The method of claim 10, wherein the second step is performed by installing a plurality of triangular reinforcing bar networks, to be arranged on each side of the square column to be constructed, at a location of the column in such a way as to simultaneously hang the plurality of triangular reinforcing bar networks from a dedicated jig and to lift the plurality of triangular reinforcing bar networks using a crane, and then surrounding the triangular reinforcing bar networks with the outer transverse reinforcing bars.

### Claim 15 (depends on 10)

The method of claim 10, wherein the second step is performed by burying a guide plate, in which reinforcing bar receiving holes are formed, in an upper portion of a base part, and then installing the triangular reinforcing bar networks in such a way as to insert the outer main reinforcing bars or inner reinforcing bars into the reinforcing bar receiving holes of the guide plate.

### Claim 16 (depends on 3)

A method of constructing the solid reinforced concrete column of claim 3, comprising:
a first step of assembling each triangular reinforcing bar network by connecting two or three outer main reinforcing bars and a single inner reinforcing bar by inner transverse reinforcing bars;
a second step of arranging reinforcing bars by arranging a plurality of triangular reinforcing bar networks and then surrounding an outside of the plurality of triangular reinforcing bar networks with outer transverse reinforcing bars; and
a third step of placing concrete so that the reinforcing bars arranged at the second step are buried in the concrete.

### Claim 17 (depends on 16)

The method of claim 16, wherein the first step is performed by connecting the inner transverse reinforcing bars in a state in which the two or three outer main reinforcing bars and the single inner reinforcing bar are fastened to a pair of jigs.

### Claim 18 (depends on 16)

The method of claim 16, wherein the second step is performed by installing the plurality of triangular reinforcing bar networks at a location of the column, and then surrounding the plurality of triangular reinforcing bar networks with the outer transverse reinforcing bars.

### Claim 19 (depends on 16)

The method of claim 16, wherein the second step is performed by assembling a column reinforcing bar network in such a way as to arrange all triangular reinforcing bar networks, to be arranged in the square column to be constructed, and to surround the triangular reinforcing bar networks with the outer transverse reinforcing bars, and then installing the column reinforcing bar network at a location of the column in such a way as to lift the column reinforcing bar network using a crane.

### Claim 20 (depends on 16)

The method of claim 16, wherein the second step is performed by installing a plurality of triangular reinforcing bar networks, to be arranged on each side of the square column to be constructed, at a location of the column in such a way as to simultaneously hang the plurality of triangular reinforcing bar networks from a dedicated jig and to lift the plurality of triangular reinforcing bar networks using a crane, and then surrounding the triangular reinforcing bar networks with the outer transverse reinforcing bars.