# US 2016/0251824 A1 · Control system of excavating machine and excavating machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2016/0251824 A1
- Document ID: US20160251824A1
- Status: Published application
- Kind: A1
- Application number: 14/386,456
- Filed: 2014-06-03
- Published: 2016-09-01
- Earliest claimed: 2014-06-03
- Assignees: Komatsu Ltd.
- Applicants: Komatsu Ltd.
- Inventors: Daiki Arimatsu; Azumi Nomura
- Web page: https://patentgrep.com/patent/US20160251824A1

## CPC

- E02F 3/435: {for dipper-arms, backhoes or the like}
- E02F 9/2025: {Particular purposes of control systems not otherwise provided for (E02F3/16, E02F3/26, sub-groups of E02F3/43, E02F3/651, sub-groups of E02F3/84, E02F3/907, E02F5/145 take precedence)}
- E02F 9/2292: {Systems with two or more pumps}
- E02F 9/2296: {Systems with a variable displacement pump}
- E02F 9/262: {with follow-up actions to control the work tool, e.g. controller}
- E02F 9/265: {with follow-up actions (e.g. control signals sent to actuate the work tool)}
- E02F 3/32: working downwardly and towards the machine, e.g. with backhoes
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

A control system of an excavating machine controls the excavating machine including a work machine, and includes a communication unit communicating with an outside of the excavating machine and receiving construction information related to an object to be excavated that is excavated by the work machine, a storage unit storing the construction information received by the communication unit, a work machine control unit executing excavation control to control an operation of the work machine not to erode the object to be excavated based on position of the work machine and the construction information stored, and a processing unit determining whether updating construction information to be used by the work machine control unit for the excavation control to the new construction information received by the communication unit according to a control state of the work machine by the work machine control unit.

## Claims

### Claim 1

A control system of an excavating machine, wherein, during execution of excavation control of controlling an operation of a work machine not to erode an object to be excavated that is excavated by the work machine based on a position of the work machine and construction information indicating a target form of the object to be excavated, when the excavation control is being executed, and in a state of waiting for update to new construction information, the new construction information is not updated for the excavation control that is being executed.

### Claim 2

A control system of controlling an excavating machine including a work machine, the system comprising:
a communication unit configured to receive construction information indicating a target form of an object to be excavated that is excavated by the work machine from an external device;
a storage unit configured to store the construction information received by the communication unit;
a work machine control unit configured to execute excavation control of controlling an operation of the work machine not to erode the object to be excavated based on a position of the work machine and the construction information stored in the storage unit; and
a processing unit configured to determine whether updating construction information to be used for the excavation control by the work machine control unit to new construction information received by the communication unit according to a control state of the work machine by the work machine control unit.

### Claim 3 (depends on 2)

The control system of an excavating machine according to claim 2, wherein,
when the work machine control unit is executing the excavation control, the processing unit does not update the construction information being used for the excavation control to the new construction information received by the communication unit.

### Claim 4 (depends on 3)

The control system of an excavating machine according to claim 3, wherein
in a case where the work machine control unit is executing the excavation control, when a file name of the construction information being used for the excavation control and a file name of the new construction information received by the communication unit are a same, the processing unit does not update construction information to be used for the excavation control to the new construction information received by the communication unit.

### Claim 5 (depends on 3)

The control system of an excavating machine according to claim 3, wherein
in a case where the work machine control unit is executing the excavation control, when position information of the construction information being used for the excavation control and position information of the new construction information received by the communication unit are a same, the processing unit does not update construction information to be used for the excavation control to the new construction information received by the communication unit.

### Claim 6 (depends on 2)

The control system of an excavating machine according to claim 2, wherein
in a case where the work machine control unit is executing the excavation control, the processing unit updates the construction information other than the construction information being used for the excavation control to the new construction information received by the communication unit.

### Claim 7 (depends on 2)

The control system of an excavating machine according to claim 2, wherein, when the work machine control unit does not execute the excavation control, or the excavating machine is in a state of key-off, the processing unit updates the construction information to be used for the excavation control to the new construction information received by the communication unit.

### Claim 8 (depends on 2)

The control system of an excavating machine according to claim 2, comprising:
a switch configured to select whether executing the excavation control, wherein
when the excavation control is canceled with an operation of the switch after the excavation control is executed with an operation of the switch,
the construction information used for the excavation control is updated to the new construction information received by the communication unit.

### Claim 9 (depends on 2)

The control system of an excavating machine according to claim 2, wherein,
when the work machine control unit is executing the excavation control, and the work machine is away from the object to be excavated, the processing unit updates the construction information to be used for the excavation control to the new construction information received by the communication unit.

### Claim 10 (depends on 2)

The control system of an excavating machine according to claim 2, wherein,
during execution of the excavation control by the work machine control unit, the processing unit displays reception information indicating the communication unit has received the new construction information in a display unit.

### Claim 11

A control system of controlling an excavating machine including a work machine, the system comprising:
a communication unit configured to receive, from an external device, construction information that is information related to an object to be excavated that is excavated by the work machine;
a storage unit configured to store the construction information received by the communication unit, and to update, when the communication unit has received new construction information, the stored construction information to the new construction information;
a work machine control unit configured to execute excavation control of controlling an operation of the work machine not to erode the object to be excavated based on a position of the work machine and the construction information stored in the storage unit; and
a processing unit configured to update the construction information to be used by the work machine control unit for the excavation control to the new construction information when the work machine control unit is not executing the excavation control, wherein when the work machine control unit is executing the excavation control, the processing unit is configured not to update the construction information being used by the work machine control unit for the excavation control to the new construction information to update the construction information other than the construction information being used by the work machine control unit for the excavation control to the new construction information received by the communication unit.

### Claim 12 (depends on 11)

An excavating machine comprising the control system of an excavating machine according to claim 11.

### Claim 13 (depends on 1)

An excavating machine comprising the control system of an excavating machine according to claim 1.

### Claim 14 (depends on 2)

An excavating machine comprising the control system of an excavating machine according to claim 2.