Marine motion compensated draw-works real-time performance monitoring and prediction
AssigneeTransocean Sedco Forex Ventures Limited
InventorsTrenton Martin, Rafik Ishak Stefanos, Aaron Barr
Life of this patent
Estimating the term…
Loading patent…
AssigneeTransocean Sedco Forex Ventures Limited
InventorsTrenton Martin, Rafik Ishak Stefanos, Aaron Barr
Estimating the term…
A method for identifying compliance of a marine motion-compensated draw-works system's performance with pre-defined performance specifications, includes the steps of: receiving, by a processor, performance data associated with a marine motion-compensated draw-works system; receiving, by the processor, pre-defined performance specifications for the draw-works system; determining, by the processor, whether or not the performance of the draw-works system complies with the pre-defined performance specifications; and outputting, by the processor, a notification when the performance of the draw-works system is determined to not be in compliance with the pre-defined performance specifications.
A method for identifying compliance of a marine motion-compensated draw-works system's performance with pre-defined performance specifications, comprising:
A computer program product, comprising:
An apparatus, comprising:
Dependencies are inferred from the claim text.