A floating hydrocarbon processing/storage structure with a first and second assembly, each including a hull having side walls, one or more storage tanks and a deck structure, a connection structure interconnecting the hulls, processing equipment situated on the deck structures, at least one riser connected to a subsea hydrocarbon well and to the processing equipment and/or storage tanks, with a mooring system connecting the processing/storage structure to the sea bed, each hull including a hull deck structure bridging the side walls, the connection structure including a central deck extending at or near the height of the hull deck structures along at least 70% of the length of the hulls, the central deck supporting at least one of: risers vertically extending from the central deck between the hulls to the sea bed, fluid ducts horizontally supported on the central deck, and at least one drilling/work-over rig or crane.
Floating hydrocarbon processing and storage structure (1) with a first and a second assembly (2,2′) each comprising a hull (3,3′) having spaced-apart side walls (5,6;5′,6′), one or more storage tanks (7,7′) and a deck structure (4,4′), a connection structure interconnecting the first and second hulls (3,3′), processing equipment (10,10′) being situated on the hull deck structures (4,4′), at least one hydrocarbon riser (15) connected to a subsea hydrocarbon well and to the processing equipment (10,10′) and/or to the storage tanks (7,7′), and with a mooring system (8,13, 35,35′) connecting the hydrocarbon processing and storage (1) structure to the sea bed (12), wherein
Floating hydrocarbon processing and storage structure (1) with a first and a second assembly (2,2′) each comprising a hull (3,3′) having spaced-apart side walls (5,6;5′,6′), one or more storage tanks (7,7′) and a deck structure (4,4′) bridging the side walls, a connection structure interconnecting the first and second hulls (3,3′), the connection structure comprises a central deck (20) extending at or near the height of the hull deck structures (4,4′) along at least along 70% of the length of the hulls (3,3′), processing equipment (10.10′) being situated on the deck structures, at least one hydrocarbon riser (15) connected to a subsea hydrocarbon well and to the processing equipment (10,10′) and/or to the storage tanks (7,7′), and with a mooring system (8,13) connecting the structure to the sea bed (12), characterised in that the structure comprises a track (43,43′) along the outer side of at least one hull (3,3′) and along the central deck (20), movable supports (44,44′) displaceable along each track, a lifting member (42) extending between the supports and being displaceable over the respective deck structure.
Method of constructing a floating hydrocarbon processing and storage structure comprising the steps of: