Apparatus for Zonal Communication Interruption
OwnerJose Oliverio Alvarez, David A. Stilesinventors
Life of this patent
Estimating the term…
Loading patent…
OwnerJose Oliverio Alvarez, David A. Stilesinventors
Estimating the term…
A method for providing zonal communication interruption in a wellbore, comprising: positioning a plurality of cement diverters axially along an outer surface of a tubular member, each cement diverter having an axial length and an azimuthal extension of less than 360°, wherein the azimuthal position of at least one cement diverter is axially rotated from an adjacent cement diverter; positioning the tubular member within the wellbore; and flowing cement into an annulus formed between an inner surface of the wellbore and the outer surface of the tubular member, wherein the positioning of the plurality of cement diverters provides zonal communication interruption about every 10 to 20 feet (about every 3.0 to about 6.1 meters) axially along the tubular member. An apparatus for providing zonal communication interruption in a wellbore is also provided.
A method for providing zonal communication interruption in a wellbore, comprising:
An apparatus for providing zonal communication interruption in a wellbore, comprising:
A method of creating a wellbore in an underground formation, comprising the steps of:
A method of producing hydrocarbons from a production well of an underground formation, comprising the steps of:
Dependencies are inferred from the claim text.