Cementing method allowing initial liner top pressure integrity confirmation
AssigneeArcher Oil Tools AS
InventorsBarton SPONCHIA, Lars NORHEIM, Brett HRABOVSKY
Life of this patent
Estimating the term…
Loading patent…
AssigneeArcher Oil Tools AS
InventorsBarton SPONCHIA, Lars NORHEIM, Brett HRABOVSKY
Estimating the term…
Cementing takes place after a hanger and seal are set to first insure the pressure integrity of the connection between the string to be cemented and the existing tubular. Cementing top down or bottom up is envisioned with either displaced fluid returning toward the surface in a crossover tool or with the displaced fluid squeezed into the formation. A work string manipulates the crossover for reversing out after cementing. For running in a valve assembly is held open to permit circulation. Work string manipulation allows at least one valve that keeps the cement in the annulus to close and at least one other valve to close that keeps the reverse fluid from leaving the cemented tubular to allow such flow to return to the crossover and out to the surface. Valve release can be done with a pressure responsive sleeve instead of a stinger on the running string.
A well completion method for supporting and cementing a tubular string from an existing tubular, said method comprising the steps of:
A petroleum well liner cementing assembly comprising:
Dependencies are inferred from the claim text.