Data Access Management During Zero Downtime Upgrade
AssigneeSap SE
InventorsJuergen Specht, Lars-Eric Biewald, Heiko Konrad, Steffen Meissner, Wieland Hoprich, Volker Driesen
Life of this patent
Estimating the term…
Loading patent…
AssigneeSap SE
InventorsJuergen Specht, Lars-Eric Biewald, Heiko Konrad, Steffen Meissner, Wieland Hoprich, Volker Driesen
Estimating the term…
A zero downtime upgrade procedure upgrading a source system to a target system is initiated that prepares software for the target system in parallel to the operation of the source system. As part of the upgrade procedure, source tables of the source system are renamed. Thereafter, the renamed source tables are cloned for the target system. Further, the renamed source tables are equipped with database triggers to transfer data from the renamed source tables to the cloned tables used by the source system according to a source database schema. Next, the target tables are generated that include updated software content for later use by the target system while the source tables are used via a bridge database schema. Tables can then be shared between the source database schema accessed via the bridge database schema and the target system.
A method comprising:
A non-transitory computer program product storing instructions, which when executed by at least one data processor forming part of at least one computing system, result in operations comprising:
A system comprising:
Dependencies are inferred from the claim text.