Method for remediating a screen-out during well completion
AssigneeExxonMobil Upstream Research Company
InventorsRandy C. Tolman, Timothy I Morrow, Timothy G Benish
Life of this patent
Estimating the term…
Loading patent…
AssigneeExxonMobil Upstream Research Company
InventorsRandy C. Tolman, Timothy I Morrow, Timothy G Benish
Estimating the term…
A method of completing a well involving remediating a condition of screen-out that has taken place along a zone of interest. The method includes forming a wellbore, and lining at least a lower portion of the wellbore with a string of production casing and placing a valve along the production casing, wherein the valve creates a removable barrier to fluid flow within the bore. The barrier is removed by moving the valve in the event of a screen-out. This overcomes the barrier to fluid flow, thereby exposing ports along the production casing to the subsurface formation at or below the valve. Additional pumping takes place to pump the slurry through the exposed ports, thereby remediating the condition of screen-out.
A method of completing a well, comprising:
A method of completing a well, comprising:
Dependencies are inferred from the claim text.