Incorporating a load change penalty in central plant optimization
AssigneeJohnson Controls Technology Company
InventorsMichael J. Wenzel, Robert D. Turney
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Technology Company
InventorsMichael J. Wenzel, Robert D. Turney
Estimating the term…
An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by multiple groups of the central plant equipment. The optimization system includes a load change penalty module configured to modify the objective function to account for a load change penalty resulting from a change in an amount of the building energy loads assigned to one or more of the groups of central plant equipment.
An optimization system for a central plant configured to serve building energy loads, the optimization system comprising:
A method for incorporating a load change penalty in an optimization process for a central plant, the method comprising:
Dependencies are inferred from the claim text.