# US 2015/0311814 A1 · Method of initiating a regenerative converter and a regenerative converter

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0311814 A1
- Document ID: US20150311814A1
- Status: Published application
- Kind: A1
- Application number: 14/674,546
- Filed: 2015-03-31
- Published: 2015-10-29
- Earliest claimed: 2014-04-29
- Assignees: Kone Corporation
- Applicants: KONE Corporation
- Inventors: Lauri STOLT; Juhamatti NIKANDER
- Web page: https://patentgrep.com/patent/US20150311814A1

## CPC

- H02M 5/458: using semiconductor devices only
- H02M 1/36: Means for starting or stopping converters
- H02M 5/4585: {having a rectifier with controlled elements}
- H02M 7/125: {Avoiding or suppressing excessive transient voltages or currents}
- H02P 27/06: using DC to AC converters or inverters (H02P27/05 takes precedence)
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS

## Abstract

The invention is related to a method of initiating a regenerative converter (1) and corresponding converter (1) including a line bridge (2) and a machine bridge (3), which are interconnected via a DC intermediate circuit (8A, 8B). The method comprises charging, through the line bridge (2) and while the machine bridge (3) remains inactive, the DC intermediate circuit (8A, 8B) to a target voltage (14) higher than peak value of the mains voltage (13).

## Claims

### Claim 1

A method of initiating a regenerative converter including a line bridge and a machine bridge, which are interconnected via a DC intermediate circuit,
the method comprising:
charging, through the line bridge and while the machine bridge remains inactive, the DC intermediate circuit to a target voltage higher than peak value of the mains voltage.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the converter includes line current filtering inductors arranged in series between line bridge AC output terminals and the mains.

### Claim 3 (depends on 2)

The method according to claim 2, the method comprising:
charging the DC intermediate circuit by switching one or more of the low-side and/or the high-side switches of the line bridge with a preselected pulse pattern.

### Claim 4 (depends on 2, 3)

The method according to claim 2 or 3, the method comprising:
charging the DC intermediate circuit by switching only subset of the switches of the line bridge.

### Claim 5 (depends on 4)

The method according to claim 4, the method comprising:
charging the DC intermediate circuit by switching only one or more of the low-side switches or alternatively only one or more of the high-side switches of the line bridge.

### Claim 6 (depends on 1)

The method according to claim 1, the method comprising:
observing the DC intermediate circuit voltage
starting normal converter operation when the DC intermediate circuit voltage reaches a threshold value.

### Claim 7

A regenerative converter, comprising:
a line bridge for connecting to the mains;
a machine bridge for connecting to the windings of an electric machine;
a DC intermediate circuit connecting together the line bridge and the machine bridge;
a control coupled to both the line bridge and the machine bridge, the control being configured to:
cause, while the machine bridge remains inactive, the line bridge to charge the DC intermediate circuit to a target voltage higher than peak value of the mains voltage.

### Claim 8 (depends on 7)

The regenerative converter according to claim 7, wherein the converter includes line current filtering inductors arranged in series between the line bridge AC output terminals and the mains connection.

### Claim 9 (depends on 8)

The regenerative converter according to claim 8, wherein the control comprises a memory for storing a preselected pulse pattern of the control pulses for one or more of the low-side switches and/or high-side switches of the line bridge;
and wherein the control is configured to cause switching with the preselected pulse pattern of one or more of the low-side switches and/or high-side switches of the line bridge.

### Claim 10 (depends on 8, 9)

The regenerative converter according to claim 8 or 9, wherein the line bridge comprises low-side and high-side switches arranged as legs, and wherein the control is configured to cause the line bridge to charge the DC intermediate circuit by switching only subset of the switches.

### Claim 11 (depends on 10)

The regenerative converter according to claim 10, wherein the control is configured to cause the line bridge to charge the DC intermediate circuit by switching only one or more of the low-side switches or alternatively only one or more of the high-side switches of the line bridge.

### Claim 12 (depends on 7)

The regenerative converter according to claim 7, wherein the control comprises a feedback channel for observing the DC intermediate circuit voltage,
and wherein the control is configured to start normal converter operation when the DC intermediate circuit reaches a threshold value.

### Claim 13 (depends on 7)

The regenerative converter according to claim 7, wherein the regenerative converter is a frequency converter.

### Claim 14 (depends on 2)

The method according to claim 2, the method comprising:
observing the DC intermediate circuit voltage
starting normal converter operation when the DC intermediate circuit voltage reaches a threshold value.

### Claim 15 (depends on 3)

The method according to claim 3, the method comprising:
observing the DC intermediate circuit voltage
starting normal converter operation when the DC intermediate circuit voltage reaches a threshold value.

### Claim 16 (depends on 4)

The method according to claim 4, the method comprising:
observing the DC intermediate circuit voltage
starting normal converter operation when the DC intermediate circuit voltage reaches a threshold value.
