# US 2015/0215200 A1 · Recovery in connection-oriented network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0215200 A1
- Document ID: US20150215200A1
- Status: Published application
- Kind: A1
- Application number: 14/394,140
- Filed: 2012-04-13
- Published: 2015-07-30
- Earliest claimed: 2012-04-13
- Assignees: Telefonaktiebolaget L M Ericsson (publ)
- Inventors: Giulio Bottari; Diego Caviglia; Daniele Ceccarelli
- Web page: https://patentgrep.com/patent/US20150215200A1

## CPC

- H04L 45/28: using route fault recovery
- H04L 41/0663: Performing the actions predefined by failover planning, e.g. switching to standby network elements
- H04L 41/0681: Configuration of triggering conditions
- H04L 45/22: {Alternate routing}
- H04L 45/42: Centralised routing
- H04L 45/50: using label swapping, e.g. multi-protocol label switch [MPLS]
- H04Q 3/0079: {involving restoration of networks, e.g. disaster recovery, self-healing networks}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04Q: SELECTING (switches, relays, selectors H01H; wireless communication networks H04W)

## Abstract

Recovery from failure of a working path for communications traffic in a connection-oriented network, where the working path has a preplanned recovery path, involves initiating recovery by requesting computation of a new recovery path for the communications traffic to avoid the failure. If the recovery is not successful within a time limit, recovery is carried out using the preplanned recovery path. Determining if the recovery is not successful and initiating the recovery using the preplanned recovery path can be controlled by an ingress node of the working path. By trying to compute a new recovery path first, network resources can be used more efficiently, as the new recovery path is likely to reuse most of the working path, since it is computed knowing the location of the fault.

## Claims

### Claim 1

A method of recovering from failure of a working path for communications traffic in a connection-oriented network, the working path having a preplanned recovery path, the method comprising:
initiating recovery in response to the failure by requesting computation of a new recovery path for the communications traffic to avoid the failure; and
determining if the recovery is not successful within a time limit, and then initiating recovery using the pre-planned recovery path.

### Claim 2 (depends on 1)

The method according to claim 1 wherein the steps of determining if the recovery is not successful and initiating the recovery using the preplanned recovery path are carried out by an ingress node of the working path.

### Claim 3 (depends on 1)

The method according to claim 1, the step of requesting computation comprising sending a request to a centralised path computation element and the method comprising the step of carrying out the computation of the new recovery path at the centralised path computation element.

### Claim 4 (depends on 1)

The method according to claim 1, comprising the step of adapting the time limit during operation.

### Claim 5 (depends on 4)

The method of claim 4, comprising the step of adapting the time limit automatically according to a current status of the network.

### Claim 6 (depends on 1)

The method according to claim 1, the preplanned recovery path being arranged to use resources shared with other paths.

### Claim 7 (depends on 6)

The method according to claim 6 further comprising the step of checking if the shared resources are still available, and if not, then requesting a new preplanned recovery path.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the steps of determining if the recovery is not successful and initiating the recovery using the preplanned recovery path are carried out by a centralised recovery management part.

### Claim 9 (depends on 1)

The method according to claim 1, the step of requesting computation comprising sending a request to a local path computation element at an ingress node of the working path and the method having the step of carrying out the computation of the new recovery path at the local path computation element.

### Claim 10

A node for a connection-oriented network, the network being arranged to recover from failure of a working path for communications traffic in the network, the working path having a preplanned recovery path, the node comprising:
a recovery control part configured to initiate recovery in response to the failure by requesting computation of a new recovery path for the communications traffic to avoid the failure; and
a timer configured to determine if the recovery is not successful within a time limit, wherein the recovery control part is configured to respond to an output from the timer to initiate recovery using the preplanned recovery path.

### Claim 11 (depends on 10)

The node according to claim 10 wherein the node is an ingress node of the working path.

### Claim 12 (depends on 10)

The node according to claim 10 configured to request computation by sending a request to a centralised path computation element and configured to receive an indication of the new recovery path from the centralised path computation element.

### Claim 13 (depends on 10)

The node according to claim 10, the timer being arranged such that the time limit is adaptable during operation.

### Claim 14 (depends on 10)

The node according to claim 10, the preplanned recovery path being arranged to use resources shared with other preplanned recovery paths and the recovery control part being configured to check if the shared resources are still available, and if not, then request a new preplanned recovery path.

### Claim 15 (depends on 10)

The node of claim 10 having a local path computation element, and the recovery control part being configured to request computation by sending a request to the local path computation element for computation of the new recovery path.

### Claim 16

A centralised recovery management part for a connection-oriented network, the network being arranged to recover from failure of a working path for communications traffic in the network, the working path having a preplanned recovery path, and the centralised management part comprising:
a centralised control part configured to initiate a recovery in response to the failure by carrying out a computation of the new recovery path to avoid the failure; and
a centralised timer part to determine if the recovery is not successful within a time limit, wherein the centralised control part is configured to respond to an output from the centralised timer to initiate the recovery using the preplanned recovery path.

### Claim 17

A computer program having machine-readable instructions which when executed by a processor cause the processor to perform a method of recovering from failure of a working path for communications traffic in a connection-oriented network, the working path having a preplanned recovery path, the method comprising:
initiating recovery in response to the failure by requesting computation of a new recovery path for the communications traffic to avoid the failure; and
determining if the recovery is not successful within a time limit, and then initiating recovery using the pre-planned recovery path.
