# US 2015/0186558 A1 · Automated mep design

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0186558 A1
- Document ID: US20150186558A1
- Status: Published application
- Kind: A1
- Application number: 14/143,548
- Filed: 2013-12-30
- Published: 2015-07-02
- Earliest claimed: 2013-12-30
- Assignees: DPR Construction
- Inventors: Atul Khanzode; Saurabh Tiwari; Christopher Rippingham
- Web page: https://patentgrep.com/patent/US20150186558A1

## CPC

- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06F 30/18: Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling (circuit design at the physical level G06F30/39; network planning tools for wireless communication networks H04W16/18)
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06F 2113/14: Pipes
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Embodiments of the present invention include a method for automatically designing MEP for a building. The method may include receiving information about the building including a first structural model of the building, and retrieving design specifications from a database, including information about local building codes, physical laws and building design rules. Information about available MEP components may be retrieved from a component library. The information about the building and the design specifications may be analyzed to determine additional elements for the first structural model of the building. A second structural model of the building including the additional elements may then be prepared.

## Claims

### Claim 1

A method for automatically designing MEP for a building comprising:
providing a processor;
receiving information about the building comprising a first structural model of the building;
retrieving from a database, design specifications, including information about local building codes, physical laws and building design rules;
retrieving from a component library, information about available MEP components;
analyzing, using the processor, the information about the building and the design specifications to determine additional elements for the first structural model of the building; and
automatically preparing a second structural model of the building comprising the additional elements, wherein the information about available MEP components comprises information about at least one of the additional elements.

### Claim 2 (depends on 1)

The method of claim 1 wherein the second structural model includes a conflict between a first additional element and a second additional element, the method further comprising:
receiving rules about priority of components from a database and assigning a first priority to the first additional element, and a second priority to the second additional element, wherein the first priority is higher than the second priority;
modifying the second additional element to eliminate the conflict; and
preparing a third structural model of the building comprising the modified second additional element.

### Claim 3 (depends on 1)

The method of claim 1 wherein the first structural model includes at least a first air outlet and a second air outlet, and wherein the additional elements include at least an air duct connecting the first air outlet and the second air outlet.

### Claim 4 (depends on 1)

The method of claim 1 wherein the first structural model comprises a three dimensional model, and wherein the second structural model comprises a three dimensional model.

### Claim 5 (depends on 1)

The method of claim 1 wherein the second structural model comprises information about the additional elements sufficient to manufacture the additional elements.

### Claim 6 (depends on 1)

The method of claim 1 wherein the structural model of the building comprises
information about walls in the building, including their location and thickness;
information about expected occupancy of rooms in the building; and
information about a location of the building.

### Claim 7 (depends on 1)

The method of claim 1 wherein the information about the local building codes comprises information about fire regulations, information about electrical wiring requirements and information about plumbing regulations.

### Claim 8 (depends on 1)

The method of claim 1 wherein the information about physical laws comprises information relevant to determining the flow of water through a waste water pipe.

### Claim 9 (depends on 1)

The method of claim 1 wherein analyzing the information about the building and the design specifications comprises determining a required airflow for a plurality of air outlets connected to an air duct, and based on a total airflow for the plurality of air outlets, determining a cross-section area for the air duct.

### Claim 10

A non-transitory computer-readable storage medium comprising a plurality of computer-readable instructions tangibly embodied on the computer-readable storage medium, which when executed by a data processor, provide automatically designed MEP for a building, the plurality of instructions comprising:
instructions that cause the data processor to receive information about the building comprising a first structural model of the building;
instructions that cause the data processor to retrieve from a database, design specifications, including information about local building codes, physical laws and building design rules;
instructions that cause the data processor to retrieve from a component library, information about available MEP components;
instructions that cause the data processor to analyze the information about the building and the design specifications to determine additional elements for the first structural model of the building; and
instructions that cause the processor to automatically prepare a second structural model of the building comprising the additional elements, wherein the information about available MEP components comprises information about at least one of the additional elements.

### Claim 11 (depends on 10)

The non-transitory computer-readable storage medium of claim 10 wherein the second structural model includes a conflict between a first additional element and a second additional element, and further comprising:
instructions that cause the data processor to receive rules about priority of components from a database and assign a first priority to the first additional element, and a second priority to the second additional element, wherein the first priority is higher than the second priority;
instructions that cause the data processor to modify the second additional element to eliminate the conflict; and
instructions that cause the data processor to prepare a third structural model of the building comprising the modified second additional element.

### Claim 12 (depends on 10)

The non-transitory computer-readable storage medium of claim 10 wherein the first structural model includes at least a first air outlet and a second air outlet, and wherein the additional elements include at least an air duct connecting the first air outlet and the second air outlet.

### Claim 13 (depends on 10)

The non-transitory computer-readable storage medium of claim 10 wherein the first structural model comprises a three dimensional model, and wherein the second structural model comprises a three dimensional model.

### Claim 14 (depends on 10)

The non-transitory computer-readable storage medium of claim 10 wherein the second structural model comprises information about the additional elements sufficient to manufacture the additional elements.

### Claim 15 (depends on 10)

The non-transitory computer-readable storage medium of claim 10 wherein the structural model of the building comprises
information about walls in the building, including their location and thickness;
information about expected occupancy of rooms in the building; and
information about a location of the building.

### Claim 16

A system for automatically designing MEP for a building, comprising:
a processor; and
a memory disposed in communication with the processor and storing processor executable instructions, the instructions comprising instructions for:
receiving information about the building comprising a first structural model of the building;
retrieving from a database, design specifications, including information about local building codes, physical laws and building design rules;
retrieving from a component library, information about available MEP components;
analyzing the information about the building and the design specifications to determine additional elements for the first structural model of the building; and
automatically preparing a second structural model of the building comprising the additional elements, wherein the information about available MEP components comprises information about at least one of the additional elements.

### Claim 17 (depends on 16)

The system of claim 16 wherein the second structural model includes a conflict between a first additional element and a second additional element, and wherein the instructions further comprise:
instructions for receiving rules about priority of components from a database and assigning a first priority to the first additional element, and a second priority to the second additional element, wherein the first priority is higher than the second priority;
instructions for modifying the second additional element to eliminate the conflict; and
instructions for preparing a third structural model of the building comprising the modified second additional element.

### Claim 18 (depends on 16)

The system of claim 16 wherein the first structural model includes at least a first air outlet and a second air outlet, and wherein the additional elements include at least an air duct connecting the first air outlet and the second air outlet.

### Claim 19 (depends on 16)

The system of claim 16 wherein the first structural model comprises a three dimensional model, and wherein the second structural model comprises a three dimensional model.

### Claim 20 (depends on 16)

The system of claim 16 wherein the second structural model comprises information about the additional elements sufficient to manufacture the additional elements.