# US 2015/0178138 A1 · Multi-core dynamic workload management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0178138 A1
- Document ID: US20150178138A1
- Status: Published application
- Kind: A1
- Application number: 14/137,914
- Filed: 2013-12-20
- Published: 2015-06-25
- Earliest claimed: 2013-12-20
- Assignees: QUALCOMM Incorporated
- Applicants: QUALCOMM Incorporated
- Inventors: Juhi Saha; Hee Jun Park; Alex Kuang-Hsuan Tu; Thomas Andrew Morison; Tao Xue; Ron Alton
- Web page: https://patentgrep.com/patent/US20150178138A1

## CPC

- G06F 9/5094: {where the allocation takes into account power or heat criteria (power management in computers in general G06F1/3203; thermal management in computers in general G06F1/206)}
- G06F 1/3203: Power management, i.e. event-based initiation of a power-saving mode
- G06F 1/329: by task scheduling
- G06F 1/3293: by switching to a less power-consuming processor, e.g. sub-CPU
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A dynamic scheduler is provided that schedules tasks for a plurality of cores based upon current operating characteristics for the cores. The current operating characteristics include a predicted leakage current for each core based upon an analytical model.

## Claims

### Claim 1

A system comprising:
a plurality of cores;
an analytic core power and thermal modeler configured to analytically model a leakage power for each core based upon the cores' native leakage currents and current temperatures and to model a dynamic power for each core based upon a current voltage and clock frequency for each core, and
a dynamic scheduler further configured to schedule tasks for the cores based upon the modeled leakage powers and dynamic powers.

### Claim 2 (depends on 1)

The system of claim 1, wherein the dynamic scheduler is further configured to schedule the tasks based upon a temperature gradient for each core.

### Claim 3 (depends on 1)

The system of claim 1, wherein the dynamic scheduler is further configured to schedule the tasks based upon a thermal conductivity for each core.

### Claim 4 (depends on 1)

The system of claim 1, wherein the dynamic scheduler is further configured to schedule the tasks based upon a location for each core on a die.

### Claim 5 (depends on 4)

The system of claim 4, wherein the dynamic scheduler is further configured to schedule the tasks based upon a proximity of the core locations to other heat sources on the die.

### Claim 6 (depends on 4)

The system of claim 4, wherein the dynamic scheduler is further configured to schedule the tasks based upon a proximity of the core locations with respect to recently-scheduled core locations.

### Claim 7 (depends on 2)

The system of claim 2, wherein the dynamic scheduler is further configured to schedule the tasks for the cores based upon an efficiency for each core's power regulator.

### Claim 8 (depends on 8)

The system of claim 8, wherein the dynamic scheduler is further configured to schedule the tasks based upon an expected task time duration for each task.

### Claim 9 (depends on 1)

The system of claim 1, wherein the dynamic scheduler if further configured to schedule tasks based upon whether the task is an idle-use case, a low-power use-case, or a high-power use-case.

### Claim 10 (depends on 7)

The system of claim 7, wherein the dynamic scheduler is further configured to determine a total power consumption for each core and to determine a system power consumption that depends upon the total power consumption for each core and the efficiency for each core's power regulator, and wherein the dynamic scheduler is further configured to schedule the tasks to minimize the system power consumption.

### Claim 11

A method, comprising:
determining a projected leakage current for each core in a plurality of cores, wherein the determination is responsive to an analytical model that depends upon a native leakage current for each core and a temperature of each core;
comparing the projected leakage currents to determine a core that has a lowest projected leakage current; and
scheduling the core with the lowest projected leakage current for a first task.

### Claim 12 (depends on 11)

The method of claim 11, wherein the first task is an idle-use case, the method further comprising determining which core has the lowest operating voltage; and
scheduling at least one of the cores for a low-power use-case task based upon which core has the lowest projected leakage current and the lowest operating voltage.

### Claim 13 (depends on 11)

The method of claim 11, further comprising:
determining which core has the lowest temperature; and
scheduling at least one of the cores for a high-performance use-case task based upon which core has the lowest temperature.

### Claim 14 (depends on 13)

The method of claim 13, further comprising determining which core has the lowest thermal gradient, wherein the scheduling of at least one of the cores for the high-performance use-case task is further based upon which core has the lowest thermal gradient.

### Claim 15 (depends on 13)

The method of claim 13, further comprising determining which core has the highest thermal conductivity, wherein the scheduling of at least one of the cores for the high-performance use-case task is further based upon which core has the highest thermal conductivity.

### Claim 16 (depends on 11)

The method of claim 11, further comprising:
determining a power regulator efficiency for each core, and
selecting a core for a second task based upon a system-level efficiency that depends upon the power regulator efficiency for each core.

### Claim 17

A multi-core system comprising:
a plurality of cores; and
means for scheduling tasks for the cores based upon an analytical model of the leakage current predicted for the cores that depends upon a temperature for each core, wherein the means for scheduling is configured to select a core with lowest predicted leakage current for tasks corresponding to idle-use cases.

### Claim 18 (depends on 17)

The system of claim 17, wherein means is further configured to schedule the tasks based upon a temperature gradient for each core.

### Claim 19 (depends on 17)

The system of claim 17, wherein the means is further configured to schedule the tasks based upon a location for each core on a die.

### Claim 20 (depends on 19)

The system of claim 19, wherein the means is further configured to schedule the tasks based upon a proximity of the core locations to other heat sources on the die.
