# US 2015/0178137 A1 · Dynamic system availability management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0178137 A1
- Document ID: US20150178137A1
- Status: Published application
- Kind: A1
- Application number: 14/138,744
- Filed: 2013-12-23
- Published: 2015-06-25
- Earliest claimed: 2013-12-23
- Assignees: Microsoft Corporation
- Applicants: Microsoft Corporation
- Inventors: Stefan Keir Gordon; Jason Earl Ginchereau; Joshua Boehm
- Web page: https://patentgrep.com/patent/US20150178137A1

## CPC

- H04L 67/101: based on network conditions
- G06F 9/5061: {Partitioning or combining of resources}
- H04L 67/1008: based on parameters of servers, e.g. available memory or workload (monitoring of computer activity G06F11/30)
- H04L 67/1031: Controlling of the operation of servers by a load balancer, e.g. adding or removing servers that serve requests
- G06F 2209/5011: Pool
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Server cluster management includes dynamically migrating machines between different server pools within the server cluster. The server pools include an active pool and at least one standby pool. Different standby pools can also be maintained to provide machines in different states of standby, including but not limited to different powered down or hibernation states. Machines are migrated between the different server pools based on network demands and machine status and capabilities. In some instances, the network demands are determined by forecasting future demands. The status and capability of the individual machines is evaluated on a continual basis to determine whether there is adequate capacity of the machines in the active pool to satisfy the one or more network demands, as well as to determine which machine is the most appropriate machine to migrate between server pools. Machines can also be migrated between the different standby pools.

## Claims

### Claim 1

A computer storage device having stored computer-executable instructions which, when executed by at least one processor, implement a method for managing and dynamically migrating a finite quantity of machines between different server pools in a server cluster, the plurality of server pools including an active pool and at least one standby pool, wherein machines in the active pool are machines that are available to be connected to clients in network sessions and wherein machines in the at least one standby pool are unavailable to be connected to clients in network sessions, the method comprising:
assigning a first set of machines to an active pool, wherein at least one of the first set of machines in the active pool operates as a stateful machine that is connected to at least one client in a lengthy and stateful session;
determining one or more network demands; and
determining whether there is adequate capacity of the first set of machines in the active pool to satisfy the one or more network demands by at least evaluating a status and capability of each of the first set of machines; and
upon determining there is adequate capacity of the first set of machines to satisfy the one or more network demands, based at least upon the evaluated status and capability of each of the first set of machines, selecting a particular one or more of the first set of machines to satisfy the one or more network demands; and
upon determining there is excess capacity of the first set of machines in the active pool, based at least upon the evaluated status and capability of each of the first set of machines and the network demands, moving one or more of the first set of machines from the active pool to the at least one standby pool.

### Claim 2 (depends on 1)

The storage device of claim 1, wherein the method further includes moving an additional one or more machines from the active pool to the at least one standby pool whenever it is determined that there is excess capacity of the first set of machines in the active pool beyond a predetermined threshold of excess capacity based upon the evaluated status and capability of each of the first set of machines.

### Claim 3 (depends on 1)

The storage device of claim 1, wherein determining there is adequate capacity includes first determining that there is insufficient capacity of the first set of machines in the active pool to satisfy the one or more network demands and thereafter moving one or more machines from the at least one standby pool to the active pool.

### Claim 4 (depends on 1)

The storage device of claim 1, wherein the one or more network demands comprises a client request and wherein upon determining there is adequate capacity of the first set of machines to satisfy the client request for a corresponding client, assigning a particular machine from the first set of machines in the active pool to a persistent and stateful session between the particular machine and the corresponding client for an extended duration of time while the client request is being satisfied.

### Claim 5 (depends on 1)

The storage device of claim 1, wherein the one or more network demands comprises a demand to update the first set of machines, and wherein selecting a particular one or more of the first set of machines to satisfy the one or more network demands includes determining it is more appropriate to update the particular one or more of the first set of machines than a different one or more of the first set of machines based upon the status and capabilities of each of the first set of machines in the active pool, and wherein the method further includes moving the particular one or more of the first set of machines from the active pool to the at least one standby pool to be updated.

### Claim 6 (depends on 1)

The storage device of claim 1, wherein determining the one or more network demands includes anticipated future demands and wherein the method includes forecasting the future demands based on historical patterns.

### Claim 7 (depends on 1)

The storage device of claim 1, wherein determining the one or more network demands includes future demands and wherein the method includes forecasting the future demands based on an anticipated software rollout.

### Claim 8 (depends on 1)

The storage device of claim 1, wherein determining the one or more network demands includes hardware maintenance demands.

### Claim 9 (depends on 8)

The storage device of claim 8, wherein the hardware maintenance demands include temperature regulation of machine hardware.

### Claim 10 (depends on 1)

The storage device of claim 1, wherein evaluating the status and capability of each of the first set of machines includes identifying a current status of utilization of each of the first set of machines.

### Claim 11 (depends on 1)

The storage device of claim 1, wherein evaluating the status and capability of each of the first set of machines includes identifying a current health status of each of the first set of machines.

### Claim 12 (depends on 1)

The storage device of claim 1, wherein evaluating the status and capability of each of the first set of machines includes identifying a current location of each of the first set of machines.

### Claim 13 (depends on 1)

The storage device of claim 1, wherein evaluating the status and capability of each of the first set of machines includes identifying a current temperature status of each of the first set of machines.

### Claim 14 (depends on 1)

The storage device of claim 1, wherein evaluating the status and capability of each of the first set of machines includes identifying a current age status of each of the first set of machines.

### Claim 15 (depends on 1)

The storage device of claim 1, wherein evaluating the status and capability of each of the first set of machines includes identifying a current status of updates of each of the first set of machines.

### Claim 16 (depends on 1)

The storage device of claim 1, wherein moving the one or more of the first set of machines from the active pool to the at least one standby pool includes:
enqueuing the one or more of the first set of machines to be moved from the active pool to the at least one standby pool; and
performing a validation that there is still an excess capacity of the first set of machines subsequent to enqueuing the one or more of the first set of machines and prior to dequeuing the one or more of the first set of machines to the at least one standby pool.

### Claim 17 (depends on 1)

The storage device of claim 1, wherein the at least one standby pool includes more than two standby pools.

### Claim 18 (depends on 16)

The storage device of claim 16, wherein the at least one standby pool includes a first standby pool that maintains machines in a powered down mode and wherein at least a second standby pool maintains machines in a powered up mode.

### Claim 19

A computer-implemented method for managing and dynamically migrating a finite quantity of machines between different server pools in a server cluster, the plurality of server pools including an active pool and at least one standby pool, wherein machines in the active pool are machines that are available to be connected to clients in network sessions and wherein machines in the at least one standby pool are unavailable to be connected to clients in network sessions:
assigning a first set of machines to an active pool, wherein at least one of the first set of machines in the active pool operates as a stateful machine that is connected to at least one client in a lengthy and stateful session;
detecting a demand to update the first set of machines;
evaluating a status and capability of each of the first set of machines;
determining it is more appropriate to update the particular one or more of the first set of machines than a different one or more of the first set of machines based upon the status and capabilities of each of the first set of machines in the active pool;
moving the particular one or more of the first set of machines from the active pool to the at least one standby pool to be updated by at least:
enqueuing the particular one or more of the first set of machines in a queue to be moved from the active pool to the at least one standby pool; and
prior to dequeuing the one or more of the first set of machines to the at least one standby pool, performing a new validation that there is still an excess capacity of the first set of machines in the active pool, wherein whenever the active pool fails to have an excess capacity then moving another machine from the at least one standby pool to the active pool so that the active pool maintains excess capacity;
updating the particular one or more of the first set of machines in the at least one standby pool; and
subsequent to updating the particular one or more of the first set of machines, replacing the different one or more machines in the active pool with the particular one or more of the first set of machines.

### Claim 20

A computing system composed of a plurality of different machines, each machine comprising a hardware processor and system memory, the computing system comprising:
an active server pool, the active server pool comprising a first set of one or more machines available to be connected to clients in network sessions, wherein at least one of the first set of machines in the active pool operates as a stateful machine that is connected to at least one client in a persistent and stateful session;
a first standby server pool, the first standby server pool comprising a second set of one or more machines that are configured to be moved into the active server pool and that are temporarily unavailable to be connected to clients in network sessions until being moved to the active server pool, the first standby server pool maintaining the second set of one or more machines in a first powered down or hibernation state; and
a second standby server pool, the second standby server pool comprising a third set of one or more machines that are configured to be moved into the active server pool or the first standby server pool, the third set of one or more machines being temporarily unavailable to be connected to clients in network sessions until being moved to the active server pool, the second standby server pool maintaining the third set of one or more machines in a second powered down or hibernation state that is different than the first powered down or hibernation state.